Permit Number: DP20-0129
Parcel: 117200270

Address:
180 S CHURCH AV

Review Status: Completed

Review Details: DEV PKG - OK TO SUBMIT

Permit Number - DP20-0129
Review Name: DEV PKG - OK TO SUBMIT
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/23/2020 SBEASLE1 START PLANS SUBMITTED Completed
06/24/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: TCC Eckbo Plaze - Phase 1
Development Package (1st Review)
DP20-0129

TRANSMITTAL DATE: June 24, 2020

DUE DATE: OK to Submit

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 34, 2021.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.1.0 GENERAL

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

2-06.3.0 FORMAT REQUIREMENTS

2-06.4.0 CONTENT REQUIREMENTS

2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD) - ADDITIONAL REQUIREMENTS

2-06.1.0 GENERAL

2-06.1.1 PURPOSE
This standard has been prepared for the purpose of informing applicants of the submittal and review requirements for development package documents to assure proper and adequate information is presented in a consistent manner, thereby providing the basis for an efficient and timely review. The development package documents are prepared in support of applications for building permits and related reviews.

The information that is requested establishes the basis upon which the project will be approved and could affect what is required of the property in the future, should there be a proposal for expansion or for a different use of the property.

This standard does not waive any applicable city regulations or codes.

2-06.1.2 APPICABILITY
This standard shall be used for all site plans and tentative plats submitted to PDSD for review.

2-06.2.1 APPLICATION SUBMITTAL REQUIREMENTS
Development Package applications are available from PDSD. Completed applications and accompanying materials shall be submitted to PDSD. Incomplete or inaccurate applications will not be accepted, nor will any application in which the pre-application conference or neighborhood meeting requirements have not been met. The types of documents and the specific number of copies required of each of the documents are on the PDSD website or may be obtained from PDSD. Resubmittals of development packages require a comment response letter that details how all previous comments have been addressed. Provide the same number of copies of the comment response letter as plans provided.
The following documents and information shall be submitted upon application:

2-06.2.1 Application Form
A completed application signed by the property owner or authorized designee;

2-06.2.2 Development Package
A development package must be prepared to the format and content requirements described herein;

2-06.2.3 Related Reviews
In addition to the plan process, a project may require review for other types of plans and documents. The applications for those processes are submitted to the appropriate department for review and approval. These related reviews can be applied for so that review can occur concurrently with the development package application. However, it must be understood that, should the related application be approved subject to conditions or denied, this may affect the;

2-06.2.4 Concurrent Reviews
The development package is designed to allow for concurrent review of any site related reviews. Concurrent review means that all plans and documents needed for the review are submitted as one package. Examples of site related reviews include but are not limited to: site plans, landscape plans, NPPO plans, water harvesting plans, grading plans, SWPPP plans, floodplain use permits, and overlay reviews. Separate applications are often required for the different site related reviews even if the plans are submitted concurrently; and,

2-06.2.5 Fees
Fees in accordance with Section 4-01.0.0, Development Review Fee Schedule.

2-06.3.0 FORMAT REQUIREMENTS

2-06.3.1 - Each sheet shall measure 24 inches by 36 inches and include a minimum one inch margin on left side and one-half inch margin on all other sides to facilitate efficient record keeping. A larger sheet format may be used with the approval of the Planning and Development Services Department (PDSD).

1. 2-06.3.9 - The plan drawing shall be oriented with north toward the top of the sheet. If it is not practical to orient north to the top of the sheet, the plan drawing shall be oriented with north to the left side of the sheet.

2. COMMENT: Provide the development package case number, DP20-0129, adjacent to the title block on each sheet.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/26/2020 SBEASLE1 ENGINEERING REVIEW Reqs Change DP20-0129

1) Provide grading cut/fill quantities in cubic yards
2) Project proposes site disturbance of over 1 acre. Provide a complete SWPPP manual upon next submittal
3) Sheet L9.4 has a series of details which reference civil plan set details. Detail 5 indicates that stormwater may drain to Sewer. Stormwater may not be directed to the sewer system. Update details accordingly
4) Please provide a pre-post drainage boundary map showing where the current and proposed outlet points are
5) Provide invert elevations for all inlet/outlet locations for the below grade drainage system
6) Sheet L9.4. Please clarify the section view of the infiltrator system. Is there an outlet pipe at the bottom of the system? If the system is for retention/infiltration Confirm through infiltration testing that the basin drawdown time be less than 12 hrs. Reference COT Stormwater Detention/Retention manual, section 3.5
7) Show how the infiltrator system may be accessed for maintenance
8) Reference City of Tucson (COT) Standards Manual for Drainage Design and Floodplain Management, include all applicable drainage maintenance responsibility notes found in section 14.3
9) Provide spot grades for all proposed water harvesting areas
10) Show on plans the cross slope and running slope of the proposed sidewalks to ensure that ADA requirements are being met
11) Please remove sheets E-001 through E-701. Commercial Electrical Review will need to occur under a seperate building permit

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
06/26/2020 SBEASLE1 ZONING-DECISION LETTER WRITE DECISION LETTER Passed