Permit Number: DP20-0119
Parcel: 13304035G

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP20-0119
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/08/2020 SBEASLE1 START PLANS SUBMITTED Completed
06/08/2020 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed
06/08/2020 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
06/08/2020 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed
06/29/2020 GDAURIA1 COT NON-DSD FIRE Completed
06/30/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved Work within the right of way will require a ROW permit
07/01/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: TEP Harrison Substation
9411 E Speedway Blvd. - C-1 Zone
Development Package (1st Review)
DP20-0119

TRANSMITTAL DATE: July 1, 2020

DUE DATE: July 7, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 07, 2021.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.1.0 GENERAL

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

2-06.3.0 FORMAT REQUIREMENTS

2-06.4.0 CONTENT REQUIREMENTS

2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD) - ADDITIONAL REQUIREMENTS

2-06.1.0 GENERAL

2-06.1.1 PURPOSE
This standard has been prepared for the purpose of informing applicants of the submittal and review requirements for development package documents to assure proper and adequate information is presented in a consistent manner, thereby providing the basis for an efficient and timely review. The development package documents are prepared in support of applications for building permits and related reviews.

The information that is requested establishes the basis upon which the project will be approved and could affect what is required of the property in the future, should there be a proposal for expansion or for a different use of the property.

This standard does not waive any applicable city regulations or codes.

2-06.1.2 APPICABILITY
This standard shall be used for all site plans and tentative plats submitted to PDSD for review.

2-06.2.1 APPLICATION SUBMITTAL REQUIREMENTS
Development Package applications are available from PDSD. Completed applications and accompanying materials shall be submitted to PDSD. Incomplete or inaccurate applications will not be accepted, nor will any application in which the pre-application conference or neighborhood meeting requirements have not been met. The types of documents and the specific number of copies required of each of the documents are on the PDSD website or may be obtained from PDSD. Resubmittals of development packages require a comment response letter that details how all previous comments have been addressed. Provide the same number of copies of the comment response letter as plans provided.
The following documents and information shall be submitted upon application:

2-06.2.1 Application Form
A completed application signed by the property owner or authorized designee;

2-06.2.2 Development Package
A development package must be prepared to the format and content requirements described herein;

2-06.2.3 Related Reviews
In addition to the plan process, a project may require review for other types of plans and documents. The applications for those processes are submitted to the appropriate department for review and approval. These related reviews can be applied for so that review can occur concurrently with the development package application. However, it must be understood that, should the related application be approved subject to conditions or denied, this may affect the;

2-06.2.4 Concurrent Reviews
The development package is designed to allow for concurrent review of any site related reviews. Concurrent review means that all plans and documents needed for the review are submitted as one package. Examples of site related reviews include but are not limited to: site plans, landscape plans, NPPO plans, water harvesting plans, grading plans, SWPPP plans, floodplain use permits, and overlay reviews. Separate applications are often required for the different site related reviews even if the plans are submitted concurrently; and,

2-06.2.5 Fees
Fees in accordance with Section 4-01.0.0, Development Review Fee Schedule.

2-06.4.0 CONTENT REQUIREMENTS

1. 2-06.4.3 - Provide the following case numbers, DP20-0119 & T15SE00066, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. 2-06.4.7.A.4 - Add the following Use Specific Standards General Site Note 3, 4.9.11.A.1, .5, & .9 and 4.9.13.O.

3. 2-06.4.7.A.6.a - The dates will need to be filled in for General Site Note 14 and if applicable the conditions will need to be revised.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
07/02/2020 PETER MCLAUGHLIN LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL
SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS
4.1 Identification and Descriptive Data

A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.

The development package will contain the following identification in the lower right corner of each sheet:

Any relevant case numbers for reviews or modifications that affect the site. Add the Development Package case number, DP20-0119, and Special Exception case number SE-15-66 (or T15SE00066) to each sheet in the lower right hand corner adjacent to the title block.

On sheet 2 of 31 of the Development Package, in the lower left hand corner, in the Special Exception conditions, add the Preliminary Development Package Date of March 24, 2020 to revised condition #1. Once the revisions to the the Special Exception conditions are approved by the Zoning Examiner, add all of the conditions to the plan sheet.
07/02/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
07/06/2020 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this development.

Howard B. Dutt, RLA, Landscape Architect
Tucson Parks and Recreation
(520) 837-8040
07/06/2020 LOREN MAKUS ENGINEERING REVIEW Reqs Change DP20-0119
1. This project proposes disturbance of a regulatory floodplain. Provide an Environmental Resource Report in accordance with Technical Standard (TS) 4-02. Expect additional comments concerning riparian resource protection based on this standard.
2. Show the areas for each watershed identified in the drainage report. Online detention/retention is not permitted for drainage areas greater than 100 acres.
3. For clarity, I recommend using sheet numbers instead of DWG numbers for page references.
4. Clearly show depth of fill at representative points throughout the site. If two feet or more of fill is proposed in the outer 100 feet of the property adjacent to residential uses, the differential fill process must be followed.
07/10/2020 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The ATTACHED PDF mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

Tucson Electric Power, 1st submittal, DP20-0119, is being Returned for Corrections by Pima County Addressing.

The attached pdf contains Addressing’s comments.
Please let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701, (520) 724-7570
07/14/2020 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Passed
07/20/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change RETURNED FOR CORRECTIONS NOTICE
Your Next Step: 1. Payment 2. Resubmittal of documents

DESCRIPTION: Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.
PERMIT/ACTIVITY: DP20-0119

FEES DUE: $ 3,395.22 Thank you for the partial payment on June 8.
Please pay the total fees (or at a minimum, the REVIEW Fees).
A payment is required before your next submittal.

ONLINE PAYMENTS
https://www.tucsonaz.gov/pdsd/fees
NOTE:
It may take 1-2 days for the full fee amount to show online.
Wait for full amount before paying.
Visa, MC, Discover, American Express or pay by checking account
1- Click on: Pay Planning & Permit Fees
2- Enter your Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5- If any issues, try using the browser Internet Explorer

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on blue icon to the right of each document

YOUR NEXT STEP:
Submit documents to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Name the 2nd submittal documents starting with the
submittal number, for example: 2_Plan_Set

FOR FASTER PROCESSING:
When on the Filedrop page, select the box
"Development Package or Land Division". This applies to all
DP submittals, DP resubmittals, and DP revisions - and all Land Splits.
(For Building Permits, continue to select "Resubmittals/Revisions...".)

Thank you.

Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov
07/21/2020 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved (The TEP FACILITIES MAP mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

WR# 6625034
July 20, 2020

SUBJECT: TEP HARRISON SUBSTATION
DP20-0119

Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted January 7 2020. There are conflicts: //TEP JUNCTION CBINET (J2) & UG THREE PHASE PRIMARY IN POSSIBLE CONFLICT WITH NEW DRIVEWAY.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.
In order to apply for electric service, call the New Construction Department at (520) 918-8300.
Submit a final set of plans including approved site, electrical load, paving off-site improvements
and irrigation plans, if available include a CD with the AutoCAD version of the plans.

If easements are required, they will be secured by separate instrument. Your final plans should be sent to:
Tucson Electric Power Company
Attn: Mr. Richard Harrington
New Business Project Manager
P. O. Box 711 (OH 204)
Tucson, AZ 85702
520-917-8726

Should you have any technical questions, please contact the area Designer Martin Salazar, (520)
305-6713.

Sincerely,
Conor Mahoney, Office Support Assistant
Design/Build

Final Status

Task End Date Reviewer's Name Type of Review Description
07/20/2020 SBEASLE1 OUT TO CUSTOMER Completed