Review Date Reviewer's Name Type of Review Description Status Comments
07/29/2020 SBEASLE1 START PLANS SUBMITTED Completed
07/30/2020 GDAURIA1 FIRE REVIEW Completed
07/31/2020 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved (The TEP FACILITIES MAP mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

WR#6624488
July 30, 2020
SUBJECT: HEMISPHERE LOOP SPEC BUILDING
DP20-0116, 2ND Submittal

Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted July 30 2020. TEP facilities are not depicted on plans, but the TEP easement is listed.
Facilities do not appear to be in conflict.
Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.
In order to apply for electric service, call the New Construction Department at (520) 918-8300.
Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans.
If easements are required, they will be secured by separate instrument. Your final plans should be sent to:
Tucson Electric Power Company
Attn: Mr. Jeremy Erlacher
New Business Project Manager
P. O. Box 711 (OH 204)
Tucson, AZ 85702
520-396-2898
Should you have any technical questions, please contact the area Designer Martin Rodriguez, at (520) 991-5495
Sincerely,
Conor Mahoney, Office Support Assistant
Design/Build
08/24/2020 ANDREW CONNOR LANDSCAPE REVIEW Approved
08/25/2020 STEVE SHIELDS ZONING REVIEW Approved
08/26/2020 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approved August 26, 2020

RE: DP20-0116 / Site/Grading/SWPPP - Hemisphere Loop Spec Building / 2nd Submittal, Received July 29, 2020

Thank you for the opportunity to comment on DP20-0116, Hemisphere Loop Spec Building; 2nd Submittal, a development package application for an approximately 4.85 acre site, located northwest of the intersection of South Palo Verde Road and East Britannia Drive. The property is zoned Light Industrial Zone (I-1), with the proposed development being a building to support a future industrial or office use.

This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.

The Tucson Airport Authority approves the proposed project. The Tucson Airport Authority communicated to the applicant that it was acceptable to record the Avigation Easement after the development package is approved.

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.

Respectfully,
Scott Robidoux, C.M., Senior Airport Planner
08/28/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Approved Date: August 28, 2020

PLAN APPROVAL NOTICE / Request for 3 documents
Please follow the steps below to finalize the approval process

NOTE: An Engineering Pre-construction Meeting is required before the permit can be issued.

DESCRIPTION: Site/Grading/SWPPP - Hemisphere Loop Spec Building.
PERMIT/ACTIVITY: DP20-0116
FEES DUE: $0 (zero) Thank you for the payment

YOUR NEXT STEPS
A. Send email to request an Engineering Pre-construction Meeting to:
Loren.Makus@TucsonAz.gov or John.VanWinkle@TucsonAz.gov.

B. Email the following documents to: COTDSDpermits@TucsonAz.gov
1. City of Tucson Permit, check-marked and signed. See attached.
2. Letter of Intent from the Contractor: Includes the project title, project address, Activity Number, ROC license number
3. Fugitive Dust Activity Permit: Contact Pima County DEQ at (520) 724-7400,
http://webcms.pima.gov/cms/one.aspx?pageId=54362

AFTER REPLYING with the required documents and completing the meeting, allow a few days for us to stamp the approved plans, upload them to PRO
(www.tucsonaz.gov/pro),
and send you a "Plan Issued" email notification. That email will include information regarding the stamped plans and required inspections.
Thank you.

Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services Dept.
email: COTDSDPermits@TucsonAz.gov
08/28/2020 LOREN MAKUS ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/28/2020 SBEASLE1 OUT TO CUSTOMER Completed