Permit Number: DP20-0116
Parcel: 14029051C

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP20-0116
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/02/2020 SBEASLE1 START PLANS SUBMITTED Completed
06/02/2020 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed
06/02/2020 SBEASLE1 PIMA COUNTY ADDRESSING Passed
06/02/2020 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Reqs Change (The TEP Facility Map mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

June 08, 2020
WR #6624488
SUBJECT: HEMISPHERE LOOP SPEC BUILDING
DP20-0116

Tucson Electric Power Company (TEP) has reviewed the development plan submitted June 30, 2020. TEP is unable to approve the plan at this time.
TEP facilities are not depicted on plans, our designer cannot tell if there will be conflicts with new development. In order for TEP to approve the plan, our facilities and easements must be depicted on the plans.

Enclosed is a copy of a TEP facility map showing the approximate location of the existing facilities. All costs associated with the relocation of the facilities in conflict will
be billable to the developer.
Please resubmit a revised blueline to the City of Tucson for TEP’s review.
Should you have any technical questions, please contact the area Designer, Martin Rodriguez, at
(520) 917-8787.
Sincerely,
Conor Mahoney, Office Support Assistant
Design/Build
06/02/2020 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed
06/02/2020 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
06/05/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/08/2020 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL

SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS

4.1 Identification and Descriptive Data

A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.

The development package will contain the following identification in the lower right corner of each sheet:

Any relevant case numbers for reviews or modifications that affect the site.

Provide Case # DP20-0116 on each sheet.

Ensure that Zoning and Engineering comments are addressed prior to landscape section approval.


Additional comments may apply
06/18/2020 GDAURIA1 COT NON-DSD FIRE Reqs Change * Show new location for "relocated" hydrant (preferably at Key Note 9 on pg. 8).
* Address signage or monument to be located at approved locations on Hemisphere Lp., as well as on building corners.
Address on Palo Verde to include "E. Hemisphere Loop".
06/26/2020 LOREN MAKUS ENGINEERING REVIEW Reqs Change DP20-0116
1. Provide a complete drainage statement. The appendices for the drainage statement were not included in the first submittal.
2. Ensure the backup spur provides sufficient space for overhang with post barricades.
3. Provide representative dimensions for parking spaces through the radius, to show the minimum dimensions are provided.
06/29/2020 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Reqs Change June 29,2020

RE: DP20-0116 / Site/Grading/SWPPP - Hemisphere Loop Spec Building / 1st Submittal, Received June 2, 2020

Thank you for the opportunity to comment on DP20-0116, Hemisphere Loop Spec Building; 1st Submittal, a development package application for an approximately 4.85 acre site, located northwest of the intersection of South Palo Verde Road and East Britannia Drive. The property is zoned Light Industrial Zone (I-1), with the proposed development being a building to support a future industrial or office use.

This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.

According to the Federal Aviation Administration (FAA) Notice Criteria Tool, this proposed project resulted in the following responses:

1. Your proposed structure exceeds an instrument approach area by 14 feet and aeronautical study is needed to determine if it will exceed a standard of subpart C of 14CFR Part 77. The FAA, in accordance with 77.9, requests that you file.
2. Your proposed structure is in proximity to a navigation facility and may impact the assurance of navigation signal reception. The FAA, in accordance with 77.9, requests that you file.
3. 77.9(b) by 6 ft. The nearest airport is TUS, and the nearest runway is 03/21.
4. The FAA requests that you file

The Tucson Airport Authority conditionally approves the subject request contingent upon the following conditions of approval, as noted below. These conditions shall be identified in the general notes of the revised development plan.

Conditions of approval:

1. "The applicant shall file FAA Form 7460 with the FAA at least 45 days before construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA), provides the project applicant with written communication that filing FAA Form 7460 is not required. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp"

Although this project does not propose a change in plan designation or zoning the Tucson Airport Authority highly recommends the applicant add the following note into the general notes of the revised development plan. This project is located approximately 1 ¼ miles northeast of Tucson International Airport and is within FAA traffic pattern airspace, an area which would be subject to aircraft overflight and noise due to being in close proximity to Tucson International Airport.

The proposed note would provide a means of assuring that future owners and tenants of the property are aware they are in proximity an airport and further assures the continued right of the City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson International Airport the right to utilize the airspace above or near the property. This would be accomplished through the property owner recording the Avigation Easement. The Tucson Airport Authority believes the proposed note helps to support the City of Tucson Airport Environs Overlay Zone and supports Plan Tucson - Regional and Global Positioning policy 4 (RG-4).

1. "That prior to the City's approval of any construction permit for a permanent building, the property owner shall record the Avigation Easement which discloses the existence, and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The Avigation Easement shall be recorded in a manner with the Pima County recorder which shall document it as having title liability. The content of such documents shall be according to the form and instructions provided.

The current property owner or person authorized to sign on behalf of the current property owner shall complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder's Office. Once the Avigation Easement is recorded please send a complete copy of the recorded easement document to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below.
Scott Robidoux, Senior Airport Planner
Tucson Airport Authority
7250 South Tucson Blvd, Suite 300
Tucson, AZ 85756

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,
Scott Robidoux, C.M., Senior Airport Planner
06/30/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: Hemisphere Loop Spec Building
Development Package (1st Review)
DP20-0116

TRANSMITTAL DATE: June 30, 2020

DUE DATE: June 30, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is June 01, 2021.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.1.0 GENERAL

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

2-06.3.0 FORMAT REQUIREMENTS

2-06.4.0 CONTENT REQUIREMENTS

2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD) - ADDITIONAL REQUIREMENTS

2-06.1.0 GENERAL

2-06.1.1 PURPOSE
This standard has been prepared for the purpose of informing applicants of the submittal and review requirements for development package documents to assure proper and adequate information is presented in a consistent manner, thereby providing the basis for an efficient and timely review. The development package documents are prepared in support of applications for building permits and related reviews.

The information that is requested establishes the basis upon which the project will be approved and could affect what is required of the property in the future, should there be a proposal for expansion or for a different use of the property.

This standard does not waive any applicable city regulations or codes.

2-06.1.2 APPICABILITY
This standard shall be used for all site plans and tentative plats submitted to PDSD for review.

2-06.2.1 APPLICATION SUBMITTAL REQUIREMENTS
Development Package applications are available from PDSD. Completed applications and accompanying materials shall be submitted to PDSD. Incomplete or inaccurate applications will not be accepted, nor will any application in which the pre-application conference or neighborhood meeting requirements have not been met. The types of documents and the specific number of copies required of each of the documents are on the PDSD website or may be obtained from PDSD. Resubmittals of development packages require a comment response letter that details how all previous comments have been addressed. Provide the same number of copies of the comment response letter as plans provided.
The following documents and information shall be submitted upon application:

2-06.2.1 Application Form
A completed application signed by the property owner or authorized designee;

2-06.2.2 Development Package
A development package must be prepared to the format and content requirements described herein;

2-06.2.3 Related Reviews
In addition to the plan process, a project may require review for other types of plans and documents. The applications for those processes are submitted to the appropriate department for review and approval. These related reviews can be applied for so that review can occur concurrently with the development package application. However, it must be understood that, should the related application be approved subject to conditions or denied, this may affect the;

2-06.2.4 Concurrent Reviews
The development package is designed to allow for concurrent review of any site related reviews. Concurrent review means that all plans and documents needed for the review are submitted as one package. Examples of site related reviews include but are not limited to: site plans, landscape plans, NPPO plans, water harvesting plans, grading plans, SWPPP plans, floodplain use permits, and overlay reviews. Separate applications are often required for the different site related reviews even if the plans are submitted concurrently; and,

2-06.2.5 Fees
Fees in accordance with Section 4-01.0.0, Development Review Fee Schedule.

2-06.4.0 CONTENT REQUIREMENTS

1. 2-06.4.3 - Provide the Development Package case number, DP20-0116, adjacent to the title block on all sheets.

2. 2-06.4.4.B - Label Britannia Dr on the location map.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

3. 2-06.4.9.H.5 - Provide a width dimension for the northern most PAAL shown east of the building.

4. 2-06.4.9.H.5 - Provide a width dimension for the access lane at the southeast corner of this site.

5. 2-06.4.9.H.5.a - The ratio, 1,000, used in the vehicle parking calculation is not correct and should be 300.

6. 2-06.4.9.H.5.a - Provide the number of van accessible vehicle parking spaces required and provided.

7. 2-06.4.9.H.5.a - Provide a detail for a standard vehicle parking space. This detail shall provide a location dimension for the proposed wheel stops.

8. 2-06.4.9.H.5.d - The short-term bicycle parking list "NONE" and then shows 5 required with 6 provided.

9. 2-06.4.9.L - Some type of access easement or agreement will be needed to allow access through the developments to the west and north.

10. 2-06.4.9.O - The street perimeter yard setbacks show on the plan and under General Note 17 are not correct. As this site boarders on Palo Verde Rd. and Palo Verde Rd. is listed as an arterial street on the COT Major Streets and Route map this site will use developing area setback. That said the street perimeter yard setbacks should be shown as 21' or the height of the proposed exterior building wall measured from the back of future curb on Palo Verde and from the outside edge of the nearest adjacent travel lane on Britannia Dr. Also, along Palo Verde there are two (2) separate "REQUIRED BUILDING SETBACK" dimensions shown. One with a distance of 54' and the other 0'.

11. 2-06.4.9.R - As this site is acting as one with the site to the west provide the required pedestrian circulation to the building to the west.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/30/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved June 30, 2020
ACTIVITY NUMBER: DP20-0116
PROJECT NAME: Hemisphere Loop Spec Building
PROJECT ADDRESS: 3380 E H Loop
PROJECT REVIEWER: Zelin Canchola Transportation and Mobility

The following comments to Traffic Statement and requirement for offsite improvements.


No need for a continuous TWLTL on Hemisphere Loop.

Striping left turn pocket for EB Hemisphere loop at Palo Verde. This is how the leg will function/operate with or without the markings. If there is peak traffic leaving the building in the PM this may help the orderly flow of traffic. A permit for striping will be required. (no PIA)

Palo Verde is extremely under capacity, so no need to widen out for a dedicated right turn lane.

Zelin Canchola
Transportation and Mobility Engineering

If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov
07/01/2020 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this development.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks and Recreation
(520) 837-8040
Howard.Dutt@tucsonAz.gov
07/02/2020 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Approved
07/03/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change RETURNED FOR CORRECTIONS NOTICE
Your Next Step: 1. Payment 2. Resubmittal of documents

DESCRIPTION: Site/Grading/SWPPP - Hemisphere Loop Spec Building.

PERMIT/ACTIVITY: DP20-0116

FEES DUE: $ 4,203.28
Please pay the total fees (or at a minimum, the REVIEW Fees).
A payment is required before your next submittal.

ONLINE PAYMENTS
https://www.tucsonaz.gov/pdsd
NOTE: It may take 1-2 days for the full fee amount to show online.
Wait for full amount before paying.
Visa, MC, Discover, American Express or pay by checking account
1- Click blue tab: Pay Permit Fees
2- Enter your Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5- If any issues, try using the browser Internet Explorer

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on blue icon to the right of each document

YOUR NEXT STEP: Submit documents to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd

FOR FASTER PROCESSING, when on the Filedrop page, select the box
"Development Package or Land Division". This applies to all
DP submittals, DP resubmittals, and DP revisions - and all Land Splits.
(For Building Permits, continue to select "Resubmittals/Revisions...".)

1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Name the 2nd submittal documents starting with the
submittal number, for example: 2_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
07/03/2020 SBEASLE1 OUT TO CUSTOMER Completed