Permit Number: DP20-0099
Parcel: 11619040A

Address:
405 N GRANADA AV

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP20-0099
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/07/2020 SBEASLE1 START PLANS SUBMITTED Completed
05/12/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/12/2020 MARTIN BROWN FIRE REVIEW Completed
05/26/2020 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL

The development package will contain the following identification in the lower right corner of each sheet:

Any relevant case numbers for reviews or modifications that affect the site.

Provide Case # DP20-0099 on each sheet.

Ensure that Zoning and Engineering comments are addressed prior to landscape section approval.


Additional comments may apply
05/29/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: Hinchcliffe Shire LLC - Bungalow Renovations and Additions
Development Package (1st Review)
DP20-0099

TRANSMITTAL DATE: May 29, 2020

DUE DATE: June 05, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 06, 2021.

2-06.3.0 FORMAT REQUIREMENTS

1. 2-06.3.5 - Remove the "DEVELOPMENT PACKAGE PDSD APPROVAL" stamp form the plan as an electronic stamp will be applied once the DP can be approved.

CONTENT REQUIREMENTS

2. 2-06.4.1 - Provide the name, mailing and email addresses, and phone number of the primary property owner/developer on the right half of the cover sheet.

3. 2-06.4.3 - Provide the development package case number, DP20-0099, adjacent to the title block on each sheet.

4. 2-06.4.2.C - Label the section corners on the location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

5. 2-06.4.7.A.4 - Revised General Note 5 to read, "Existing & Proposed Use: Multifamily, R-2 zoning subject to Use Specific Standards 4.9.7.B.6, .9, & .10.

6. 2-06.4.7.A.6.a - Provide a general note on the cover sheet stating "THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R)."

2-06.4.7.A.8 - For development package documents provide:

7. 2-06.4.7.A.8.b - Provide a lot coverage calculation on the plan that meets UDC Article 6.4.3.

8. 2-06.4.7.A.8.c - As it appears that you are expanding floor area provide a floor area expansion calculation on the plan. This calculation cumulative

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

9. 2-06.4.9.O - Based on elevations provided it does not appear that the proposed addition will meet perimeter yard setbacks to the east property. As the elevations were not fully dimensioned Zoning utilized Bluebeam measure feature and came up with a wall height exceeding 14'. Per UDC Table 6.3-2.B & 6.3-3.A the required perimeter yard setback to the east property line is 10' or ¾ times the height (H) of the exterior wall. Based on the provided setback of 10'-6" the maximum wall height would be 14'. The height of the exterior wall is measured from design grade to the highest point, see UDC Article 6.4.5.B1 and Figure 6.4.5-A. Provide a fully dimensioned elevation for the east side of the structure so that perimeter yard setbacks can be verified. A Design Development Option (DDO) for reduction of perimeter yard setbacks may be required.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/01/2020 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP20-0099

1) Provide waste stream calculations on plans per TSM section 8-01.8.0 showing that the existing service is sufficient for the proposed expansion. Otherwise show how the required service will be provided

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
06/02/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change RETURNED FOR CORRECTIONS NOTICE
Your Next Step: 1. Payment 2. Resubmittal of documents

DESCRIPTION: SITE - Hinchcliffe Shire, renovations and additions.

PERMIT/ACTIVITY: DP20-0099

FEES DUE: $ 511.50
Please pay the total fees (or Review Fees at a minimum).
A payment is required before the next submittal.

ONLINE PAYMENTS
https://www.tucsonaz.gov/pdsd
It may take 1-2 days for complete permit information to be available online
Visa, MC, Discover, American Express or pay by checking account
1- Click blue tab: Pay Permit Fees
2- Enter your Permit Nbr, example: dp00-0006 (not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5- If any issues, try using the browser Internet Explorer

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on blue icon to the right of each document

YOUR NEXT STEP: Submit documents to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd

For quicker processing, on the Filedrop page, select the box "Development Package or Land Division". This applies to all DP submittals, DP resubmittals, and DP revisions - and all Land Splits.
(For Building Permits, continue to select "Resubmittals/Revisions...".)

1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Name the 2nd submittal documents starting with the submittal number, for example: 2_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
06/02/2020 SBEASLE1 OUT TO CUSTOMER Completed