Permit Review Detail
Review Status: Completed
Review Details: TENTATIVE PLAT REVIEW
Permit Number - DP19-0313
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/06/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
07/06/2020 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | May 4, 2020 Atwell 4700 E. Southern Ave. Mesa, AZ 85206 Attn: Dennis E. Roberts, P.E. SUBJECT: Water Availability for Project: 6700-6800 Block of E. Camino Boleadoras, APN: 141366800,880,890,900,910,920,930,940 & 960, Case #: WA3112, T-15 R-15 S-19, Lots: 9999, Location Code: TUC, Total Area: 106.97 ac, Zoning: PAD-7 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Michael Mourreale, P.E., Engineering Manager Tucson Water Department |
07/08/2020 | GDAURIA1 | COT NON-DSD | FIRE | Reqs Change | Show or add notes: * The emergency access road will meet the City of Tucson Development Standards, as well as Fire Code requirements for width, 18' curb radiuses, and clearance height to obstructions. * This temporary access road will remain and be maintained until the Phase 3 roadway is approved by TFD. * This roadway will be signed as a fire access lane * If roadway access is secured, the method must be approved by TFD. |
07/14/2020 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Approved | ADOT SC District no comments based on codes or ordinances. However per: The Arizona Department of Transportation (ADOT) has prepared a Draft Environmental Assessment (EA) and Initial Design Concept Report (DCR) to study potential improvements to two important corridors that serve the Tucson area: Interstate 10 and SR 210. possible alternatives do show future Right of Way takes that may affect this subdivision. Just a note for the developer to be aware of. Richard La Pierre Permits Supervisor, South Central District 1221 South Second Avenue Tucson, Arizona 85713 520.388.4234 (office) |
07/17/2020 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Approv-Cond | Tucson Electric Power Co., (TEP) has reviewed and approves the Tentative Plat submitted on July 6, 2020, however, please correct Paving Notes Item 9 to read: "ACCESS FROM THE SOUTH IS UNOBSTRUCTED." If there are any questions, please contact me at 520-401-9895. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Land Resources – RC 131, Tucson, AZ 85714-2114 Office - 520-917-8744, Cell - 520-401-9895 mburke@tep.com |
07/22/2020 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | 07/21/20 DP19-0313 Tentative Plat La Estancia Phase II Parcels 1 and 2, 2nd Submittal, is Approved by Pima County Addressing. Thank you. Robin Freiman, Addressing Official Pima County Development Services Department (520) 724-7570 |
07/31/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
07/31/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The following lots appear to require backwater valves in addition to the lots you have identified: 126, 127, 128, 129, 131, 132, 174, 175, 176, 177, 178, 179, and 180 (upstream manhole #20); lot 5 (upstream manhole #23); and lot 113 (upstream manhole #37). [Initial comment: Indicate which lots will require backwater valves. Reference: Section 714.1, IPC 2018 as amended by the City of Tucson.] |
07/31/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. Ensure that Zoning and Engineering comments are addressed prior to landscape section approval. Additional comments may apply |
08/03/2020 | SBEASLE1 | COT NON-DSD | PARKS & RECREATION | Approved | No Tucson Parks and Recreation facilities are affected by this development package. Howard B. Dutt, RLA, Landscape Architect Tucson Parks and Recreation, (520) 837-8040 |
08/04/2020 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | August 3, 2020 RE: DP19-0313 / TENTATIVE PLAT - La Estancia, Phase 2, Parcels 1 (Lots 1-193) and 2 (Lots 1-78) / 2nd Submittal, Received July 6, 2020 Thank you for the opportunity to comment on DP19-0313, La Estancia, Phase 2, Parcels 1 (Lots 1-193) and 2 (Lots 1-78), Tentative Plat; 2nd Submittal, a development package application of a tentative plat for an approximately 50.42 acre site, located southwest of the intersection of South Kolb Road and Camino Boleadoras. The property is zoned Planned Area Development 7 (PAD-7), with the proposed development being a residential development. This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the 2nd submittal of this project and has no additional comments to provide. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M., Senior Airport Planner |
08/10/2020 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | DATE: Aug. 10, 2020 RETURNED FOR CORRECTIONS NOTICE Your Next Steps: Resubmittal of documents NOTE - See Tucson Electric Power's review comments regarding their conditional approval: www.tucsonaz.gov/pro DESCRIPTION: TENTATIVE PLAT - La Estancia, Phase 2, Parcel 1 (Lots 1-193) and Parcel 2 (Lots 1-78). PERMIT/ACTIVITY: DP19-0313 PROJECT MANAGER: Steve.Shields@TucsonAz.gov FEE BALANCE: $0 (zero) Thank you for the payment. SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on View to the right of each document YOUR NEXT STEP: Submit documents to the Filedrop https://www.tucsonaz.gov/file-upload-pdsd 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff - Name the 3rd submittal documents starting with the submittal number, for example: 3_Plan_Set FOR FASTER PROCESSING: When on the Filedrop page, select the box "Development Package or Land Division". This applies to all DP submittals, DP resubmittals, and DP revisions - and all Land Splits. (For Building Permits, continue to select "Resubmittals/Revisions...".) Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services email: COTDSDPermits@TucsonAz.gov |
08/10/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP19-0313 1) Previous comment 8. Adjacent to Lots 10,11,12. The floodplain boundaries is shown as being outside of the channel and at grade with the proposed lots. Please clarify if this is the case. If so the pad elevation for the associated lots will need to provide a minimum 1' freeboard John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov |
08/10/2020 | SBEASLE1 | COT NON-DSD | REAL ESTATE | Approved | The Real Estate Division has approved DP19-0313. Our right of way vacation will be by the Paper Plat Process so we will need to be on the same Mayor and Council date as the new plat. Please keep Real Estate informed with regards to the tentative M&C date. Regards, Michael Hollar, SENIOR PROPERTY AGENT REAL ESTATE DIVISION DEPARTMENT OF TRANSPORTATION Main: 520-791-4371, Direct: 520-837-6784 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/10/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |