Permit Number: DP19-0313
Parcel: 141366910

Address:
6601 E BENSON HY

Review Status: Completed

Review Details: TENTATIVE PLAT REVIEW

Permit Number - DP19-0313
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2020 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The "attached PDF" mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the "Documents" section.)

DP19-0313 Tentative Plat La Estancia Phase II Parcels 1&2 is being Returned for Corrections by Pima County Addressing.
The attached pdf contains Addressing’s comments.
Please let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor Tucson, AZ 85701, (520) 724-7570
01/13/2020 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Reqs Change Tucson Electric Power Co., (TEP) has reviewed the development plan/tentative plat submitted on December 27, 2019, and is unable to approve the plat at this time. Please show and label underground electrical facilities adjacent to the new project on the north side of Camino Boleadoras.

If there are any questions, please contact me at 520-917-8744.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co., Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com
01/13/2020 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Reqs Change Regional Traffic Engineering has comments on this submittal.The TIA submitted in this package does not identify/address any impacts to the I-10 frontage road Wilmot Rd intersection and any modifications to the existing facilities.
The document identifies that the original, approved, TIA used ADOT & PCDOT guidelines for ti conclusions, why was this not done for this phase of the development.
Thank you.

Tom Martinez, ADOT
TMartinez@Azdot.gov
01/22/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
01/24/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Indicate which lots will require backwater valves. Reference: Section 714.1, IPC 2018.
2. There are two lots labeled as 105 on sheet 10 of 12.
01/27/2020 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Reqs Change January 27, 2020
RE: DP19-0313 / TENTATIVE PLAT - La Estancia, Phase 2, Parcels 1 (Lots 1-193) and 2 (Lots 1-78) / 1st Submittal, Received December 27, 2019

Thank you for the opportunity to comment on DP19-0313, La Estancia, Phase 2, Parcels 1 (Lots 1-193) and 2 (Lots 1-78), Tentative Plat; 1st Submittal, a development package application of a tentative plat for an approximately 50.42 acre site, located southwest of the intersection of South Kolb Road and Camino Boleadoras. The property is zoned Planned Area Development 7 (PAD-7), with the proposed development being a residential development.
This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.

The Tucson Airport Authority conditionally approves the subject request contingent upon the following condition of approval, as noted below. This condition shall be identified in the general notes of the revised development plan.

Condition of approval:
1. "According to the Federal Aviation Administration (FAA) Notice Criteria Tool, this project area is located in proximity to a navigation facility and could impact navigation signal reception. As the project site develops, every project applicant shall file FAA Form 7460 with the FAA at least 45 days before construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA), provides the project applicant with written communication that filing FAA Form 7460 is not required. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp"

Although this project does not propose a change in plan designation or zoning the Tucson Airport Authority highly recommends the applicant add the following two notes into the general notes of the revised development plan. This project is located approximately 4 miles northeast of Tucson International Airport and is within FAA traffic pattern airspace, an area which would be subject to aircraft overflight and noise due to being in close proximity to Tucson International Airport.

The first proposed note would provide a means of assuring that future owners and tenants of the property are aware they are in proximity an airport and further assures the continued right of the City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson International Airport the right to utilize the airspace above or near the property. This would be accomplished through the property owner recording the Avigation Easement. The second proposed note is meant to be a second method of notification, but only for residential related uses, that future property owners and tenants are living near an airport. The Tucson Airport Authority believes the proposed notes help to support the City of Tucson Airport Environs Overlay Zone and supports Plan Tucson - Regional and Global Positioning policy 4 (RG-4).

1. "That prior to the City's approval of any construction permit for a permanent building, the property owner shall record the Avigation Easement which discloses the existence, and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The Avigation Easement shall be recorded in a manner with the Pima County recorder which shall document it as having title liability. The content of such documents shall be according to the form and instructions provided.

The current property owner or person authorized to sign on behalf of the current property owner shall complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder's Office. Once the Avigation Easement is recorded please send a complete copy of the recorded easement document to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below.
Scott Robidoux, Senior Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard
Suite 300
Tucson, AZ 85756"

2. "For only residential uses - The developer shall provide the Airport Disclosure Statement form, at time of sale, to the new property owners with new unit purchases. In the event the development of any residential uses does not involve the sale of new units, but is instead offering rental residential units to the public, the new tenant of the rental unit shall be provided a copy of the Airport Disclosure Statement form. The intent of the Airport Disclosure Statement form is to educate and notify the new residents that they are living near an airport. The content of such documents shall be according to the form and instructions provided.

The new property owner or new tenant shall forward a signed copy of the Airport Disclosure Statement form to the Tucson Airport Authority, using the mailing address provided below.
Scott Robidoux, Senior Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard
Suite 300
Tucson, AZ 85756"

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,
Scott Robidoux, , Senior Airport Planner
cc: gmohl@sunbeltholdings.com
01/27/2020 DJELLEN1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Jellen
PDSD Zoning Review Section

PROJECT: La Estancia Phase II Parcels 1 and 2
Development Package (1st Review)
DP19-0313

TRANSMITTAL DATE: January 27, 2020
DUE DATE: January 28, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 24, 2020.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)


2-06.3.0 FORMAT REQUIREMENTS

CONTENT REQUIREMENTS

2-06.4.2 - The title block shall include the following information and be provided on each sheet:


2-06.4.2.C - The number of proposed lots and common areas are to be noted. If the subdivision is a Flexible Lot Development (FLD), a condominium, or a similar type of residential subdivision utilizing special provisions of the UDC, it shall be so noted;

1. COMMENT: 2-06.4.2.C - Revise the tract areas to be labeled as common areas A, B, C, D, etc. The use of each common area should be labeled within the footprint of the common area and on the title block. Also revise General Note 3 to include common areas instead of tracts.


2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

2. COMMENT: 2-06.4.3 - Provide the development package case number, DP19-0313, adjacent to the title block on each sheet.


2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and,

3. COMMENT: 2-06.4.4.B - Add Via Rio Poco to the location map adjacent to the Julian Wash as noted by the Major Streets and Routes Map.


2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

Zoning and Land Use Notes

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

4. COMMENT: 2-06.4.7.A.4 - Add the existing use of the project site to the General Note section with the listed proposed uses.


2-06.4.7.A.5 - On residential projects, list the total number of units/lots proposed.

5. COMMENT: 2-06.4.7.A.5 - In addition to the information that has been provided, provide the combined number of lots that are being proposed for both Parcel 1 and Parcel 2 under General Note 3.


2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

6. COMMENT: 2-06.4.7.A.6 - Remove General Notes 6 and 7, as they do not apply to the boundaries of the project site. Replace one of these notes to state that the development is in conformance with the PAD-7 Sound Mitigation Overlay Zone and its accompanying requirements.


2-06.4.7.A.8 - For development package documents provide:

2-06.4.7.A.8.d - When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. If the project is being phased, calculations must show that, at each phase, requirements are being met.

7. COMMENT: 2-06.4.7.A.8.d - Indicate whether Parcel 1 and Parcel 2 are being phased. If so, provide the information noted by the standard above.


2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system.

8. COMMENT: 2-06.4.8.A - Provide the information noted by the standard above for every boundary of the site.


2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.

9. COMMENT: 2-06.4.8.B - If applicable, add any additional easements not already detailed on the tentative plat.


2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

10. COMMENT: 2-06.4.8.C - Add the recordation information for Camino Boleadoras.


2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements.

11. COMMENT: 2-06.4.9.A - Provide the information noted by the standard above. Specifically, Lots 10-20 on Sheet 8 are missing the rear lot distance information.


2-06.4.9.C - If the project has common areas, label each common area individually with a separate letter designation. Enclose with a solid line each common area, private street, etc., that will have separate restrictions, a separate homeowners' association, or any common area that is separated by a public right-of-way.

12. COMMENT: 2-06.4.9.C - Provide the information noted by the standard above. See related comment #1.


2-06.4.9.D - Delineate proposed Natural Undisturbed Open Space (NUOS) in a surveyable manner.

13. COMMENT: 2-06.4.9.D - If applicable, provide the information as noted by the standard above.


2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements.

14. COMMENT: 2-06.4.9.F - Provide the information noted by the standard above for lots across I-10.


2-06.4.9.G - If the project is to be phased, provide calculations, setbacks, etc., to indicate that each phase complies with all requirements as a separate entity. Show phase lines on the drawing. Show and label any temporary improvements that may be needed to make the site function for each phase as one entity. If such temporary improvements are off the site of the phase under consideration, a temporary easement or other legal documentation to assure legal use of the property is required. Note recording information.

15. COMMENT: 2-06.4.9.G - If applicable, provide the information noted by the standard above.


2-06.4.9.H.2 - Show future and existing sight visibility triangles. On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section.

16. COMMENT: 2-06.4.9.H.2 - Show future and existing sight visibility triangles for Camino Boleadoras as noted by the standard above.


2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

17. COMMENT: 2-06.4.9.H.5.a - Provide a parking calculation for the site as noted by the standard above.


2-06.4.9.H.6 - If the project is phased, the phase under consideration shall be designed so those later phases are assured legal access. If such access is provided through the phase under consideration, public streets are required, or access easements must be delineated and dedicated for such use. If private easements are utilized, protective covenants establishing the right of access, maintenance and incorporation of future phases into this project are required.

18. COMMENT: 2-06.4.9.H.6 - If applicable, provide the information noted by the standard above.


2-06.4.9.K - Identify and provide dimensions, approximate areas in square footage, and purposes of any lots proposed for dedication (such as open spaces, recreation areas, or natural areas) or for reservation for a public use (such as public parks, water facilities, or school sites).

19. COMMENT: If applicable, provide the information noted by the standard above.


2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval.

20. COMMENT: 2-06.4.9.L - If applicable, add the information for any additional easements not already detailed on the tentative plat.


2-06.4.9.V - For gang mailboxes indicate location to assure there are no conflicts with other requirements, such as pedestrian accessibility, utilities, and landscaping.

21. COMMENT: 2-06.4.9.V - Indicate whether a gang mailbox will be used for the site. If so, provide the information noted by the above.


2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required.

22. COMMENT: 2-06.4.9.W - If applicable, state in a General Note that all signs will be permitted under a separate permit.


***For additional information on the any standard presented in this memo, please refer to the City of Tucson "Unified Development Code" - Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, Contact David Jellen at (520) 837-4082 or by email David.Jellen@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
01/27/2020 ALEXANDRA HINES COT NON-DSD REAL ESTATE Reqs Change Real Estate has reviewed this plat and has the following comments;

It appears La Estancia Phase II Parcels 1 & 2 are two separate subdivisions. This plat submittal should be two separate reviews, Lots 1-193 and Lots 1-78 or combined into one subdivision of 271 lots.

Developer/engineer should contact the Real Estate Division to finalize the vacation of Vuelta De Ocho Rios right of way within the new subdivision via the Paper Plat Process.

Respectfully,

Jim Stoyanoff
Real Estate Consultant
Jim.Stoyanoff@tucsonaz.gov
520-837-6837
01/28/2020 DJELLEN1 H/C SITE REVIEW Reqs Change See zoning comments.
01/28/2020 SBEASLE1 COT NON-DSD PARKS & RECREATION Reqs Change Unless other acceptable remedy can be negotiated: As described in the La Estancia PAD, and as stated in the Parks "Letter of Refinement" dated May 22, 2008, the design and construction of the "Community Park and the Gas Line Park Phase 2 are to be completed prior to the "issuance by the City of Tucson of a C of O for the first 20% of the total dwelling units to be built in Phase 2 or b) the first 250 units in phase 2, whichever comes first". It is the responsibility of the owner/developer to notify Tucson Parks and Recreation "when submitting application for C of O that is 75% of trigger; and when submitting application for trigger C of O".

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation, (520) 837-8040
Howard.Dutt@tucsonaz.gov
01/28/2020 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL

SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS

4.1 Identification and Descriptive Data

All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.

If applicable show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements.

Indicate graphically, where possible, compliance with conditions of PAD 7 document.

The Landscape Plans for La Estancia (Exhibit II.D) must respond to section D. Landscape Plan of PAD 7.

The Tentative Plat will contain the following identification in the lower right corner of each sheet:

Any relevant case numbers for reviews or modifications that affect the site.

Provide case number, DP19-0313.

Ensure that all Zoning and Engineering comments and concerns are addressed.

Additional comments may apply
01/28/2020 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Passed
01/30/2020 MARTIN BROWN COT NON-DSD FIRE Reqs Change Per section D107.1 of the 2018 International Fire Code, developments exceeding 30 single family houses require two remote access points, or all houses will contain fire sprinklers. Please review section D (in the appendixes) and modify plans to conform.
02/03/2020 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP19-0313

1) City of Tucson Stormwater Detention Retention Manual requires, for Balanced Basins, that the 2,10 and 100 year developed discharges do not exceed pre-developed condition. Update Drainage report to include the 2 year rain event.
2) Provide a retention/detention summary table sheet in the drainage manual for each of the existing/proposed watersheds showing the pre-developed discharges against the developed discharges
3) This development proposes 5 or more units per acre. Per section 1.4 of the Detention Retention Manual, provide the necessary 2 year threshold retention and include the provided volumes in the summary table mentioned in comment 2
4) Provide percolation testing to verify that the drawdown time for the proposed retention basins is less than 12 hours
5) Sheet 5. Retention Basin Table. Basin C shows a depth of 3' and a ponding depth of 3.77' Please update as needed. Ponding depth should not be greater than basin depth
6) Sheet 5. Clarify if the proposed basins are for Retention, Detention or Both. Provide an updated table indicating the depth of retention, and the depth of detention for each basin
7) Section 4.5 of the supplied drainage report. Indicate the depth of water during a 100-year event. A maximum of 1' depth is allowed per section 12.2 of the standards manual for drainage design for flow in a street
8) Show on plans the 100 year floodplain limits/boundaries for all regulatory flows of 100 CFS or greater. Reference chapter V of the standards manual for drainage design and page 2.10. Clearly label all regulatory limits
9) It is proposed to divert a portion of a critical basin into a balanced basin. Existing water shed discharge points must remain essentially the same so as to not degrade riparian areas downstream. Please update plan and drainage report to show that the critical basin discharge location remains essentially at the same location and provide the necessary 15% reduction in pre-developed discharge
10) Sheet 2. MDR and MDHR building set back detail. Update detail to show how site visibility requirements are being met. Reference City of Tucson (COT) Technical Standards Manual (TSM) section 10-01.5.0
11) Sheet 6-8. Show site visibility triangles at all intersections. Reference standard in comment 7. The currently shown typical site visibility triangles are not shown correctly

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
02/04/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
Your Next Step: A resubmittal which includes a Comment Response Letter

DESCRIPTION: TENTATIVE PLAT - La Estancia, Phase 2, Parcels 1 (Lots 1-193) and 2 (Lots 1-78).

PERMIT: DP19-0313
Please include this number on all future correspondence and in Filedrop's "Project Description" field.

PROJECT MANAGER: Steve.Shields@Tucsonaz.gov or (520) 837-4956
FEE BALANCE: $0 (zero)
VIEW REVIEWER'S COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, left side, Activity Search, enter the Activity Number
- Permits section, click on blue tab
- Documents section, click on blue icon to the right of each document
- Reviews section, click on Review Details

YOUR NEXT STEPS: Submit the following items to the Filedrop - https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
- Filedrop: In the Project Description field, enter the Activity/Permit Number
- Name your 2nd submittal documents to start with the number, for example: 2_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, 2nd Floor
Tucson, AZ 85701
email: COTDSDPermits@TucsonAz.gov
12/27/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Reqs Change The Applicant is responsible for obtaining a Water Availability Letter from Tucson Water (or Ray Water Company, if applicable). Provide the Letter in your next submittal. Mayor & Council cannot approve until water is assured.
12/27/2019 SBEASLE1 START PLANS SUBMITTED Completed
12/27/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
12/27/2019 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed Review not required. This agency was notified for their information only.
12/27/2019 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed Review not required. This agency was notified for their information only.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/04/2020 SBEASLE1 OUT TO CUSTOMER Completed