Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: DP19-0308
Parcel: 11623144A

Address:
1007 S FREEWAY

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP19-0308
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/19/2019 SBEASLE1 START PLANS SUBMITTED Completed
12/19/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP19-0308

1) Provide approval from Tucson Electric Power, and Southwest Gas for the construction activities which will be occurring through or over existing easements. Reference City of Tucson Administrative Manual section 2-06.4.8.b
B. All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.
2) Reference City of Tucson (COT) Standards Manual for Drainage Design and Floodplain Management, include all applicable drainage maintenance responsibility notes found in section 14.3
3) Per Stormwater Detention/Retention Manual section 3.4.2 provide a grade control marker for the proposed retention basin. On the plans please also provide the coordinates of the grade control marker so it can be easily located in the future
4) ADD DP19-0308 to all sheets

This project will require a pre-construction meeting prior to issuance of the development package permit. Project will require EOR certification prior to final inspection


John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
12/19/2019 STEVE SHIELDS ZONING REVIEW Reqs Change See Engineering comments
12/19/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL

SECTION 2-11.0.0: NATIVE PLANT PRESERVATION PLAN REQUIREMENTS

2-11.3.0 PERMITTED EXCEPTIONS

Requests for exceptions from the Native Plant Preservation requirements in accordance with Sections 7.7.3.D.3 and .4 of the UDC are reviewed by the Planning and Development Services Department (PDSD). Submittals are required to document that the site does not contain, or the proposed project does not impact, Protected Native Plants. Submittal requirements shall consist of one or more of the following items:

3.2 A signed statement from one of the plant professionals listed in Section 7.7.4.D, Professional Expertise, of the UDC who has visited the site and verified that Viable Protected Native Plants are not located on the subject site.

Provide NPP Application or Exception.

https://www.tucsonaz.gov/files/pdsd/forms/NPPOapp.pdf

Ensure that Engineering comments are addressed prior to landscape section approval.
12/23/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
See details below - a resubmittal is required.

Permit/Activity Number: DP19-0308
Include this number on all future correspondence.

Project Description: GRADING/SWPPP / IID - 22nd Street Expo.

Fee Balance: $0 (zero)
View the documents and the reviewer's comments online: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, left side, Activity Search, enter the Activity Number
- Permits section, click on blue tab
- Documents section, click on blue icon to the right of each document
- Reviews section, click on "Review Details"

Submit the following items to the Filedrop.
In the Project Description field, enter the Activity Number.
PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
4) Name your 2nd submittal documents accordingly, for example: 2_Plan_Set

HOLIDAY SCHEDULE, Dec. 23-27 (Mon-Fri): All City of Tucson Planning and Development permitting services and Cashier Services at the Public Works Building, 201 N. Stone Ave., (first floor) will be closed.
Beginning Dec. 30 (Mon), they will reopen at their new location on the second floor.

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, 3rd Floor
Tucson, AZ 85701
email: COTDSDPermits@TucsonAz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
12/23/2019 SBEASLE1 OUT TO CUSTOMER Completed