| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/03/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 02/12/2020 | DJELLEN1 | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Jellen PDSD Zoning Review Section PROJECT: Sunland Asphalt Yard and Maintenance Facility Development Package (2nd Review) DP19-0295 TRANSMITTAL DATE: February 12, 2020 DUE DATE: March 3, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 27, 2020. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) CONTENT REQUIREMENTS 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. Zoning and Land Use Notes 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 1. COMMENT: 2-06.4.7.A.4 - Comment not fully addressed. List all UDC sections applicable to the proposed use, specifically "4.9.13.Q" with General Note #4. Remove the UDC section from General Note #1. 2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan. 2. COMMENT: 2-06.4.7.A.6 - Comment not fully addressed. Draw and label the Airport Environs Height Zone lines that affect the property on the site plan. There are three distinct height zones that affect the subject property and each should be drawn and labeled on the site or key plan, as noted by the standard above. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson "Unified Development Code" - Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, Contact David Jellen at (520) 837-4082 or by email David.Jellen@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 03/04/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 03/18/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | Please provide a completed floodplain use permit application. |
| 03/20/2020 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | RETURNED FOR CORRECTIONS NOTICE Your Next Steps: Resubmittal with a Comment Response Letter DESCRIPTION: SITE/GRADING/SWPPP - Sunland Asphalt, svc. yard and maint. facility. PERMIT: DP19-0295 PROJECT MANAGER: Loren.Makus@tucsonaz.gov or 837-4927 FEE BALANCE: $0 (zero) SEE REVIEWER'S COMMENTS and your submitted documentson PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, left side, Activity Search, enter the Activity Number - Permits section, click on blue tab - Reviews section, click on Review Details - Documents section, click on blue icon to the right of each document YOUR NEXT STEPS: Submit the following items to the Filedrop- https://www.tucsonaz.gov/file-upload-pdsd 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set) 3) Any other documents requested by review staff - Name your 3rd submittal documents to start with the submittal number, for example: 3_Plan_Set Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, 2nd Floor Tucson, AZ 85701 email: COTDSDPermits@TucsonAz.gov |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/20/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |