Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - OK TO SUBMIT
Permit Number - DP19-0271
Review Name: DEV PKG - OK TO SUBMIT
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/04/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
11/04/2019 | SBEASLE1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Passed | |
11/04/2019 | SBEASLE1 | WWM | REVIEW | Passed | |
11/05/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
11/05/2019 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: Catalina High School Park - Shade Structure Development Package (1st Review) DP19-0271 TRANSMITTAL DATE: November 5, 2019 DUE DATE: OK to Submit COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 4, 2020. CONTENT REQUIREMENTS 1. 2-06.4.2.D - In the lower right corner of the title block provide the page number and the total number of pages in the package (i.e., sheet xx of xx). 2. 2-06.4.3 - Provide the development package case number, DP19-0271, adjacent to the title block on all sheets. 3. 2-06.4.2.C - For the location map provide the section, township, and range and label section corners; 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 4. 2-06.4.7.A.4 - Revise General Note 3 to read "EXISTING USE PARKS AND RECREATION. PROPOSED USE PARKS AND RECREATION SUBJECT TO USE SPECIFIC STANDARDS 4.9.13.B & C. 5. 2-06.4.7.A.6 - Provide a general note on the cover sheet stating "THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R). 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 6. 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds "2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 7. 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
11/06/2019 | SBEASLE1 | ZONING-DECISION LETTER | WRITE DECISION LETTER | Passed |