Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP19-0258
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/22/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
11/01/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Solar Panels for COT Secondary Effluent Pump Station site Development Package (1st Review) DP19-0258 / 2931 W. Calle Agua Nueva / RX-1 Zoning TRANSMITTAL DATE: November 1, 2019 DUE DATE: November 20, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 21, 2019. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) CONTENT REQUIREMENTS 2-06.4.1 - The name, mailing and email addresses, and phone number of the primary property owner of the site, the developer of the project, registrant(s), and other person(s), firm(s), or organization(s) that prepared the development package documents shall be provided on the right half of the cover sheet. The applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines. 1. COMMENT: 2-06.4.1 - On the cover sheet, list the Owner/developer's information as noted by the standard above and list the Surveyor's email address. 2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat; 2. COMMENT: 2-06.4.2.B - List in the title block, a brief legal description of the site. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 3. COMMENT: 2-06.4.3 - Provide the development package case number, DP19-0258, adjacent to the title block on each sheet. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. Zoning and Land Use Notes 2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan. 4. COMMENT: 2-06.4.7.A.6 - All projects proposed on City of Tucson property cannot be approved until an Archeological review and approval is completed through the PDSD Historic review section. Contact Michael Taku at 520-837-4963 for process information. 2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any. 5. COMMENT: 2-06.4.7.A.6.a - List the Archeological application case number next to the title block of all plan sheets. AS a general note list the application case number, date of approval and any conditions of approval. 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system. 6. COMMENT: 2-06.4.8.A - Label the site boundary information as noted by the standard above. 2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided. 7. COMMENT: 2-06.4.8.B - Include the easement recording information as noted by the standard above. 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements. 8. COMMENT: 2-06.4.9.F - On the cover sheet overall site drawing label the adjacent zoning classifications, RX-1 along the west and south boundary and RX-1 and P-1 along the east boundary. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson "Unified Development Code" - Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
11/01/2019 | DAVID RIVERA | ZONING HC | REVIEW | Passed | |
11/20/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL The Development Package will contain the following identification in the lower right corner of each sheet: Any relevant case numbers for reviews or modifications that affect the site. Add case # DP19-0258 Ensure that all Zoning and Engineering comments and concerns are addressed. Additional comments may apply. |
11/22/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
11/25/2019 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
11/27/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE - A resubmittal is required. NOTE: All City of Tucson offices, except for emergency services, will be closed tomorrow, Thursday, Nov. 28. We will be open on Friday, Nov. 29, but with limited staff and services. Pima County public parking facilities will be closed on both days. Permit/Activity Number: DP19-0258 Include this number on all future correspondence. Project Description: SITE - City of Tucson, secondary effluent pump station, ground mount photovoltaic. Fee Balance: $0 (zero). To view documents and Reviewer's comments: www.tucsonaz.gov/pro (If information is not available, check back later as data transfers to PRO periodically.) - Home page, left side, “Activity Search”, enter the Activity Number - “Permits” section, click on blue tab - “Documents” section, click on blue icon to the right of each document - "Reviews" section, click on "Review Details" Submit the following items to the Filedrop. In the Project Description field, enter the Activity Number. PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd 1) Comment Response Letter (your response to the reviewer's “Requires Change” comments) 2) Plan Set (all pages, full set) 3) Any other documents requested by review staff 4) Name your 2nd submittal documents accordingly, for example: 2_Plan_Set Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/27/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |