Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP19-0250
Parcel: 10712170G

Address:
2940 N ORACLE RD

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP19-0250
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/31/2020 SBEASLE1 START PLANS SUBMITTED Completed
01/31/2020 MALLORY RESS ZONING REVIEW Approved
02/03/2020 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change The following applies:

5.4. MAJOR STREET AND ROUTES SETBACK ZONE (MS&R)

5.4.5. PERMITTED USE OF MS&R RIGHT-OF-WAY AREA

An approved site plan is required indicating how the project will comply with UDC standards when the MS&R right-of-way can no longer be used as part of the site. Such plan shall be an exhibit to an executed covenant for recordation stating the responsibility of the property owner, successor, or assignee as to the removal of improvements and compliance with the UDC at no cost to the City.

The following comments are intended for Board of Adjustment Variance

7.6.4. LANDSCAPE STANDARDS

Minimum Width

Street landscape borders must be a minimum of ten feet wide as measured from the street property line. On streets designated as Major Streets and Routes (MS&R), the street landscape border must be measured from the future MS&R right-of-way line as determined by Section 5.4.4.

Located on Site

Street landscape borders must be located entirely on site, except that, if approved by the City or appropriate Engineer or designee, up to five feet of the required ten foot width may be placed within the adjacent right-of-way area or within the Major Streets and Routes (MS&R) right-of-way area on MS&R streets.

A street landscape border is an area running the full length of the street property line bounding the site except for points of ingress-egress.

Portions of the 5' on-site landscape buffer along Oracle Rd., indicated on future site plan are not located on-site.

7.6.5. SCREENING STANDARDS


Whether or not required by this section, screens along a street frontage must be located on the development side of the street landscape border so that they do not obstruct the view of the street landscape border from the street.


A future site plan will need to show how the site will meet minimum conditions of the UDC.


Note: Any use of the ROW will need full and written permission from ADOT.
02/04/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: A resubmittal which includes a Comment Response Letter

DESCRIPTION: SITE/GRADING - La Frontera Alborada Apts. - Oracle, single-story.

PERMIT: DP19-0250
Please include this number on all future correspondence and in Filedrop's "Project Description" field.

PROJECT MANAGER: Mallory.Ress@Tucsonaz.gov or (520) 837-6933
FEE BALANCE: $0 (zero)
VIEW REVIEWER'S COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, left side, Activity Search, enter the Activity Number
- Permits section, click on blue tab
- Documents section, click on blue icon to the right of each document
- Reviews section, click on Review Details

YOUR NEXT STEPS: Submit the following items to the Filedrop - https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
- Filedrop: In the Project Description field, enter the Activity/Permit Number
- Name your 5th submittal documents to start with the number, for example: 5_Plan_Set
Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, 2nd Floor
Tucson, AZ 85701
email: COTDSDPermits@TucsonAz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
02/04/2020 SBEASLE1 OUT TO CUSTOMER Completed