Permit Number: DP19-0250
Parcel: 10712170G

Address:
2940 N ORACLE RD

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP19-0250
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/18/2019 SBEASLE1 START PLANS SUBMITTED Completed
10/30/2019 IMONSHI1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Iman Monshizadeh
PDSD Zoning Review Section

PROJECT: La Frontera Alborada Apts - 2940 N Oracle Rd
Development Package (1st Review)
DP19-0250 - C-2 Zoning

TRANSMITTAL DATE: November 15th, 2019
DUE DATE: November 15th, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 10th, 2020.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)


CONTENT REQUIREMENTS

2-06.4.1 - The name, mailing and email addresses, and phone number of the primary property owner of the site, the developer of the project, registrant(s), and other person(s), firm(s), or organization(s) that prepared the development package documents shall be provided on the right half of the cover sheet. The applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines.

1. COMMENT: 2-06.4.1 - Provide the email address for the owner/developer, Jason Hisey.


2-06.4.2 - The title block shall include the following information and be provided on each sheet:

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

2. COMMENT: 2-06.4.3 - Provide the development package case number, DP19-0250, adjacent to the title block on each sheet.




2-06.4.9.H.2 - Show future and existing sight visibility triangles. On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section.

3. COMMENT: 2-06.4.9.H.2 - Provide existing SVT for access on Blacklidge St.


2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

4. COMMENT: 2-06.4.9.H.5.a - Total required parking exceeds the total number of provided spaces by 4. Revise parking on the next submittal. If current number of parking spaces is to be kept demonstrate how you are meeting the reductions within the vehicle parking calculation i.e UDC article 7.4.5.E or an IPP or a Board of Adjustment will be required prior to approval


2-06.4.9.J - If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way lines for those streets. (Add the MS&R future sidewalk, right-of-way lines, sight visibility triangles, etc.)

5. COMMENT: 2-06.4.9.J - Provide dimensions for future ROW lines from the center of the street.


2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

6. COMMENT: 2-06.4.9.R - Show pedestrian circulation access to Blacklidge St.


2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required.

7. COMMENT: 2-06.4.9.W - Add a general note that states that signage will be permitted under a separate permit.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson "Unified Development Code" - Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, Contact Iman Monshizadeh at (520) 837-4082 or by email Iman.Monshizadeh@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/07/2019 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The "attached PDF" mentioned below can be viewed on: www.TucsonAz.gov/Pro. See the "Documents" section.)

DP19-0250 / 1st submittal/ La Frontera Alborada Apts is being Returned for Corrections by Pima County Addressing.
The attached pdf contains Addressing’s comments.
Please let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701, (520) 724-7570

CC: Lisa Bowers
11/13/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL

SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS

4.1 Identification and Descriptive Data

All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.

The Development Package will contain the following identification in the lower right corner of each sheet:

Any relevant case number for reviews or modifications that affect the site.

Add case # DP19-0250

Ensure that all Zoning and Engineering comments and concerns are addressed.

Additional comments may apply
11/15/2019 IMONSHI1 ZONING HC REVIEW Reqs Change
11/15/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
11/15/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change DP19-0250

1. Revise the drainage report to provide 5-year threshold retention. As indicated in the presubmittal comments, retention is required since the parcel was part of a parcel greater than acre since September 1984.
2. Provide the existing site run-off in the drainage report.
3. Clarify on page 4 of the drainage report the 1237 cubic feet of generated volume. This is not the total volume generated from the site.
4. Provide complete waste stream calculations including the requirements of TS 8-01 in addition to Tucson City Code 15-10. The TS 8-01 calculation is for weekly volume; TCC 15-10 is for minimum capacity between pickups. Both standards must be met.
5. Clearly identify and label all water harvesting and retention areas on the plans.
6. Show drainage patterns, including roof drainage, throughout the site to show how required volumes will be directed to the basins.
11/20/2019 MARTIN BROWN COT NON-DSD FIRE Approved
11/21/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
- A resubmittal is required.

Permit/Activity Number: DP19-0250
Include this number on all future correspondence.

Project Description: SITE/GRADING - La Frontera Alborada Apts., single-story.
Project Manager: Mallory.Ress@TucsonAz.gov, (520) 837-6933

Fee Balance: $0 (zero).
To view documents and Reviewer's comments: www.tucsonaz.gov/pro
(If information is not available, check back later as data transfers to PRO periodically.)
- Home page, left side, “Activity Search”, enter the Activity Number
- “Permits” section, click on blue tab
- “Documents” section, click on blue icon to the right of each document
- "Reviews" section, click on "Review Details"

Submit the following items to the Filedrop.
In the Project Description field, enter the Activity Number.
PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's “Requires Change” comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
4) Name your 2nd submittal documents accordingly, for example: 2_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
11/21/2019 SBEASLE1 OUT TO CUSTOMER Completed