Permit Number: DP19-0246
Parcel: 107020090

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP19-0246
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/06/2020 SBEASLE1 START PLANS SUBMITTED Completed
02/27/2020 LSHAMIS1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Loran Shamis
PDSD Zoning Review Section

PROJECT: MJI Industrial
3224 N Freeway Industrial Loop
Development Package (2nd Review)
DP19-0246

TRANSMITTAL DATE: February 25, 2020
DUE DATE: March 6, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 8, 2020.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

1. COMMENT: 2-06.4.7.A.4 - Add a general note acknowledging compliance with the applicable use-specific standards, 4.9.5.C.2, .6, .7, .8 and 4.9.13.Q.

2. COMMENT: 2-06.4.9.H.5 - Per Article 7.4.6.F.B., Back-up Spurs, of the UDC states the back-up spur must be a minimum of three feet in depth and have a three foot radii and a wheel barrier to prevent encroachment onto unsurfaced areas. Additionally, a minimum distance of thee feet must be provided between the back of the spur and any obstruction (i.e. the wrought iron fence). Figure 7.4.6-B demonstrates the standard.

3. COMMENT: 2-06.4.9.R - Per Technical Standards Manual, Section 7-01.0.0 Pedestrian Access, the pedestrian refuge area requires a minimum of four-foot width.

4. COMMENT: 2-06.4.9.R - Regarding Construction Note 25, Pedestrian Refuge, add a note confirming this area is not accessible to the public.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson "Unified Development Code" - Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations

If you have any questions about this transmittal, Contact Loran Shamis by email Loran.Shamis@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/05/2020 ANDREW CONNOR LANDSCAPE REVIEW Approved
03/09/2020 MARTIN BROWN FIRE REVIEW Approved
03/11/2020 LOREN MAKUS ENGINEERING REVIEW Approved
03/12/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: Resubmittal with a Comment Response Letter

DESCRIPTION: SITE/GRADING - MJI Industrial Building, in Lot 5 of Freeway IndustrialPark.

PERMIT: DP19-0246
Due to high volume, please enter this number at the beginning on Filedrop's "ProjectDescription" field and all correspondence. It will allow our staff to quickly identify which office to forward it to for processing.

PROJECT MANAGER: Mallory.Ress@tucsonaz.gov or 837-6933

FEE BALANCE: $0 (zero)

SEE REVIEWER'S COMMENTS and your submitted documentson PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, left side, Activity Search, enter the Activity Number
- Permits section, click on blue tab
- Reviews section, click on Review Details
- Documents section, click on blue icon to the right of each document

YOUR NEXT STEPS: Submit the following items to the Filedrop- https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
- Filedrop: In the Project Description field, enter the Activity/Permit Number
- Name your 3rd submittal documents to start with the submittal number, for example: 3_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, 2nd Floor
Tucson, AZ 85701
email: COTDSDPermits@TucsonAz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
03/12/2020 SBEASLE1 OUT TO CUSTOMER Completed