Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP19-0234
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/06/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. The development package will contain the following identification in the lower right corner of each sheet: Any relevant case numbers for reviews or modifications that affect the site. Provide the PDMR activity number. As a general note, provide the PDMR case number, date of approval, and the approved modifications requested. The DP will not be able to be approved until the PDMR is approved by the City of Tucson. (Per zoning comment #3). COMMENT: 2-06.4.9.H.5.a - The parking space located on the south east portion of the site needs to be 18' in length. Show the 2.5 overhang for the north parking spaces. Ensure that Zoning comments are addressed prior to landscape section approval. Additional comments may apply |
| 01/07/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Keynote #12 has not been added to sheet 5 of 11. [Initial comment: The rim elevation of the next upstream sanitary manhole (9444-11, 2364.97) is higher than the first floor elevation (2364.3'). Provide a note on the plans requiring the installation of a backwater valve when future plumbing activities take place. Floors discharging from the second story shall not discharge through the backwater valve. Reference: Section 714.1, IPC 2018, as amended by the City of Tucson.] |
| 01/08/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | please add the PDMR case number to the cover sheet |
| 01/09/2020 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE NOTE: A resubmittal with a Comment Response Letter is required. Permit/Activity Number: DP19-0234 Please include this number on all future correspondence. Description: SITE/GRADING - Alborada Apts - Balboa. Manager: Mallory.Ress@TucsonAz.gov, (520) 837-6933 Fee Balance: $0 (zero) View documents and reviewer's comments on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, left side, Activity Search, enter the Activity Number - Permits section, click on blue tab - Documents section, click on blue icon to the right of each document - Reviews section, click on Review Details YOUR NEXT STEPS: Submit the following items to the Filedrop - https://www.tucsonaz.gov/file-upload-pdsd - In the Project Description field, enter the Activity Number - Name your 3rd submittal documents accordingly, for example: 3_Plan_Set 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set) 3) Any other documents requested by review staff Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, 2nd Floor Tucson, AZ 85701 email: COTDSDPermits@TucsonAz.gov |
| 12/06/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 12/18/2019 | SAMUEL ROGERS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Samuel Rogers - Planner PDSD Zoning Review Section PROJECT: La Frontera Alborada Apts Development Package (2nd Review) 2620 N BALBOA AV DP19-0234 - R-3 Zoning TRANSMITTAL DATE: December 18, 2019 DUE DATE: January 7, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 02, 2020. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) CONTENT REQUIREMENTS 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and, 1. COMMENT: 2-06.4.4.B - Label the following on the location map: Stone Av, Glenn St, 6th Av, Dahil Rd and Miracle mile. FOLLOW UP COMMENT: 6th Ave. was not added to the vicinity map, add 6th Ave. on next submittal. 2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 2. COMMENT: 2-06.4.9.H.5 - The PAAL located on the north side of the property is 22 ft. in width the required two-way PAAL width is 24 ft. FOLLOW UP COMMENT: Provide the PDMR activity number adjacent to the title block. As a general note, provide the PDMR case number, date of approval, and the approved modifications requested. The DP will not be able to be approved until the PDMR is approved by the City of Tucson. 2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 3. COMMENT: 2-06.4.9.H.5.a - The parking space located on the south east portion of the site needs to be 18' in length. Show the 2.5 overhang for the north parking spaces. FOLLOW UP COMMENT: Provide the PDMR activity number adjacent to the title block. As a general note proved the PDMR case number, date of approval, and the approved modifications requested. The DP will not be able to be approved until the PDMR is approved by the City of Tucson. ***For additional information on the any standard presented in this memo, please refer to the City of Tucson "Unified Development Code" - Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, Contact Samuel Rogers at (520) 837-6932 or email Samuel.Rogers@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 12/18/2019 | SROGERS2 | ZONING HC | REVIEW | Reqs Change | See zoning comments |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/09/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |