Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/15/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | FROM: Development Services Department Zoning Review PROJECT: 1st Southern Baptist Church – Solar Canopies Development Package (Revision #1) DP19-0198 TRANSMITTAL DATE: July 15, 2021 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. COMMENT: 2-06.4.9.H.5 – Per UDC Figure 7.4.6-A: Motor Vehicle Use Area Dimensions and Table 7.4.6-1 MOTOR VEHICLE USE AREA DIMENSIONS, when accessing 90 degree parking the minimum PAAL width is 24’. That said the 22’-2” PAAL shown on the south side of the western canopy does not meet required 24’-0”. Zoning acknowledges that a PDMR was submitted but Per UDC Article 7.4.10.D.10 the modification cannot decrease the parking area access lane or driveway dimension by more than 5% of the minimum width required. Exception: The width of a parking area access lane or driveway may not be reduced when it is a fire lane. The maximum reduction in width to a 24’ PAAL is 1.2’ or a 22.8’ wide. The PDMR was denied. If you have any questions about this transmittal, please contact Elisa Hamblin, Elisa.Hamblin@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
07/29/2021 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | 1. Previous comment 4 - "Minimum back up distance for 90-degree parking is 24'. For the new accessible parking spaces 21'7" is shown. As well on the northside of the western most canopy. Update as needed." still needs to be addressed. PDMR was denied Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
07/29/2021 | SBEASLE1 | ZONING-DECISION LETTER | WRITE DECISION LETTER | Reqs Change | Email from: COTDSDPermits To: Armando Grijalva Cc: ALL@ssolare.com Thu 7/29/2021 12:52 PM REVISION PLAN Returned for corrections, DP19-0198 DESCRIPTION: SITE - First Southern Baptist Church, solar carports, re-stripe parking. 445 E SPEEDWAY BL FEE BALANCE: $0 (zero) Thank you for the payment VIEW the review comments and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on View to the right of each document After the corrections are made, please name your Revision #1, 4th submittal documents accordingly, for example: REV-1_4_Plan_Set. YOUR NEXT STEPS: Submit documents to the Filedrop https://docs.tucsonaz.gov/Forms/tucsonpermitapp Select "Existing Application" 1) Comment Response Letter (your response to the reviewer's Requires changes comments) 2) Plan Set (or individual sheets) 3) Any other items requested by review staff Thank you. Sharon Beasley, Permit Specialist City of Tucson, Planning and Development Services Email for Development Pkgs: COTDSDpermits@TucsonAz.gov (disregard the email response that will be sent automatically) Email for Building Permits: PDSDinquiries@TucsonAz.gov |