Review Date Reviewer's Name Type of Review Description Status Comments
10/11/2019 SBEASLE1 START PLANS SUBMITTED Completed
10/16/2019 PAUL CAMARENA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: Brake Max Tanque Verde
Development Package (1st Review) 9191 E TANQUE VERDE RD
DP19-0191 - C-2 Zoning

TRANSMITTAL DATE: October 16, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 13, 2020.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)


CONTENT REQUIREMENTS


2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval.

1. COMMENT: 2-06.4.9.L - This comment is still applicable - provide the information noted by the standard above. Provide recordation information for the electrical easement.




If you have any questions about this transmittal, Contact Paul Camarena at (520) 791-5550 or by email Paul.Camarena@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
10/16/2019 PCAMARE1 ZONING HC REVIEW Reqs Change COMMENT: Show the longitudinal slope from the property line to the parking lot. The slope must be less than 8% and because the rise of the slope is greater than 6 inches the sidewalk will require hand railing in order to comply with accessibility standards. See Engineering Comments.
10/18/2019 JOHN VAN WINKLE ENGINEERING REVIEW Approved
10/25/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
10/29/2019 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Needs Review
10/30/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change

Final Status

Task End Date Reviewer's Name Type of Review Description
10/30/2019 SBEASLE1 OUT TO CUSTOMER Completed