Permit Number: DP19-0188
Parcel: 12108075A

Address:
6188 E PIMA ST

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP19-0188
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/12/2019 SBEASLE1 START PLANS SUBMITTED Completed
08/20/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Leman Academy of Excellence - Charter School
Development Package (1st Review) 6188 E. Pima Street
DP19-0188 - R-1 / R-2 Zoning
UDC compliance not applicable - ADA site review is applicable

TRANSMITTAL DATE: August 20, 2019
DUE DATE: September 10, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 7, 2020.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

1. COMMENT: 2-06.4.3 - Provide the development package case number, DP19-0188, adjacent to the title block on each sheet.


2. COMMENT: 2-06.4.9.R - Label the onsite ADA route on the site plan sheet(s) and the ADA connection to the street sidewalk.


If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
08/20/2019 DAVID RIVERA ZONING HC REVIEW Reqs Change See zoning comments related to ADA
08/21/2019 MASHFOR1 COT NON-DSD FIRE Reqs Change Fire Sprinklers & Alarms will be required based on the information given. Please provide the occupancy type/usage on the plan set. Also, please add all current and future Fire Hydrant locations to confirm available water source for Fire. Fire access will also need to be determined moving forward on this project.
08/29/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). The construction of the on-site utilities may be included with the permit for constructing a building or as a separate permit if there are multiple buildings.
2. Provide the rim elevations of the sanitary manholes upstream of each connection to the public sewer system. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.
09/09/2019 ANDREW CONNOR LANDSCAPE REVIEW Passed
09/10/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP19-0188

1) Sheet C3.2. It does not appear that the curb access ramp at the corner of Lee St and Rook Av meets accessibility requirements. Show on plans that the curb access ramp at the corner of Lee St and Rook Av will be updated to the current PAG standard detail 207
2) Per Stormwater Detention/Retention Manual section 3.4.2 provide a grade control marker for each of the proposed detention basins. On the plans please also provide the coordinates of the grade control markers so that they can be easily located in the future
3) Sheet C3.2. Please add the sheet number to section detail 8
4) It appears that rip-rap is needed along the western side of the outlet weir locations, for the proposed retention basin, to control erosion
5) Engineering can conduct an expedited electronic review once the above comments have been addressed and a new workflow opened

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
09/11/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
- A resubmittal is requested
Permit/Activity Number: DP19-0188
Description: SITE/GRADING/SWPPP - Leman Academy, charter school.
Project Manager: Mallory.Ress@TucsonAz.gov, (520) 837-6933 Fees Due: $ 3,802.21
Note: Review fees must be paid before we can accept a resubmittal.

Please pay the total fees (or Review Fees at a minimum):
1. Online
2. In person at the permit counter (Mon-Fri, 8:00 AM to 2:00 PM)
3. By mail - a check payable to City of Tucson, address is shown below, include the Activity Number

City of Tucson - Online Payments:
https://www.tucsonaz.gov/pdsd/online-resources-fees-maps-records
1. Payment portal may take 1-2 days to update to the correct total fees due.
2. Not case-sensitive but a hyphen is needed, e.g.: dp19-0000
3. Enter your Permit Nbr. and click the “Continue” tab
4. If any issues, try using the browser Internet Explorer.
5. Accepted: Visa, MC, Discover, or American Express
6. All data and transactions are securely encrypted

To view the review comments: www.tucsonaz.gov/PRO, enter Activity Number.
(If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
Submit the following items to the PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (listing your response to reviewer's comments)
2) Plan Set (all pages, full set)
3) Any other items requested by review staff
Name your 2nd submittal documents accordingly, for example: 2_Plan_Set.
Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
09/11/2019 SBEASLE1 OUT TO CUSTOMER Completed