Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP19-0178
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/31/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
07/31/2019 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | Review not required. This agency was notified for their information only. |
07/31/2019 | SBEASLE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | Review not required. This agency was notified for their information only. |
07/31/2019 | SBEASLE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | Review not required. This agency was notified for their information only. |
08/01/2019 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
08/15/2019 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | (The enclosed "TEP facilities map" mentioned here can be viewed on PRO in the "Documents" section) WR#6282877 August 15, 2019 City of Tucson Planning and Development Services Attn: Sharon Beasley, Permit Specialist 201 N. Stone Avenue, First Floor Tucson, AZ 85701 Dear Ms. Beasley: SUBJECT: Bridges, Sub-Area, DP19-0178 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted July 31, 2019. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. There is a pole line along Park Ave going N to S on the West side of the street. Current plans do not show any conflicts with those poles/lines. Future plans for driveways may/may not be in conflict. Will determine that if/when future plans are drafted up. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Mr. Richard Harrington New Business Project Manager P. O. Box 711 (OH 204) Tucson, AZ 85702 520-917-8726 Should you have any technical questions, please contact the area Designer, Freddy Quintero, at (520) 917-8758. Sincerely, Linda Metzer, Office Support Assistant Design/Build cc: F. QuinteroTucson Electric Power |
08/19/2019 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Paul Camarena PDSD Zoning Review Section PROJECT: The BRIDGES, SUB-AREA, B-IV Development Package (1st Review) 3250 S PARK AV DP19-0178 TRANSMITTAL DATE: August 16, 2019 DUE DATE: August 28, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is July 29, 2020. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) Section 2-06.3.0 FORMAT REQUIREMENTS 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 1. COMMENT: Provide the development package case number, DP19-0178, adjacent to the title block on each sheet. 2-06.4.6 - If the project is located within the boundaries of a Planned Area Development (PAD) zone, include a reduced-scale map of the PAD on the first sheet, indicating the location of the portion being developed. 2. COMMENT: Provide a map of the PAD on the cover sheet as noted by the standard above. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 3. COMMENT: Provide the existing use of the property as noted by the standard above If you have any questions about this transmittal, Contact Paul Camarena at (520) 791-5550 or by email Paul.Camarena@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
08/19/2019 | PCAMARE1 | ZONING HC | REVIEW | Approved | |
08/26/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The first floor elevation of the proposed 2-story building is less than 12" above the rim elevation of the next upstream sanitary manhole. Provide a note on the plans requiring the installation of a backwater valve when future plumbing activities take place. Plumbing fixtures located on the second floor of the building shall not discharge through the backwater valve. Reference: Section 714.1, IPC 2018, as amended by the City of Tucson. |
08/26/2019 | SBEASLE1 | COT NON-DSD | PARKS & RECREATION | Approved | Tucson Parks and Recreation recommends approval of this Site/Grading Plan. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation, (520) 837-8040 Howard.Dutt@tucsonaz.gov |
08/26/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP19-0178 1) SWPPP plan sheet. Show appropriate controls needed to prevent sediment from entering into the proposed storm drain system and along the boundary of the detention/retention basin 2) Sheet 12. Suggest providing a graded area suitable for future sidewalk along the northern side of the proposed street cross section 3) Roundabout at the western end of the proposed street is a good opportunity for water harvesting. Provide curb cut inlet details and spot grades as needed according to UDC section 7.6.6.C. Also the center landscaped islands in the proposed street can be designed to accept rain water John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
08/27/2019 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | August 27, 2019 RE: DP19-0178 Bridges, Sub-Area, 1st Submittal, Received July 31, 2019 Thank you for the opportunity to comment on DP19-0178, Bridges, Sub-Area; 1st Submittal, a development package application for an approximately 2.0 acre site, located west of the intersection of East Tucson Marketplace Boulevard and South Park Avenue. The property is zoned Planned Area Development 15 (PAD-15) and the proposed development is infrastructure for future commercial development. The Tucson Airport Authority provided previous comments during the proposed vertical construction portion of the project, DP19-0093. The Tucson Airport Authority is satisfied with the 1st submittal of this project and has no additional comments to provide. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, Senior Airport Planner Cc: Lisa Bowers |
08/27/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | The Development Package will contain the following identification in the lower right corner of each sheet: Any relevant case numbers for reviews or modifications that affect the site. Provide the development package case number, DP19-0178. If applicable, indicate graphically, where possible, compliance with conditions of the PAD document. Provide a map of the PAD on the cover sheet. Ensure that all Zoning and Engineering comments and concerns are addressed. |
08/27/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
08/28/2019 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Passed | Building and land use proposal is covered under separate development package review. |
08/28/2019 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Passed | The buildings are covered under separate development packages. |
08/29/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE - A resubmittal is required Permit/Activity Number: DP19-0178 Description: SITE/GRADING - Bridges, Sub-Area B-4. Initial infrastructure. Project Manager: Steve.Shields@TucsonAz.gov, (520) 837-4956 Fees Due: $4,554.36 Please pay the total fees (or Review Fees at a minimum): 1. Online 2. In person at the permit counter (Mon-Fri, 8:00 AM to 2:00 PM) 3. By mail - a check payable to City of Tucson, address is shown below, include the Activity Number NEW: Online payments are now accepted. 1. Visa, MC, Discover, or American Express 2. No cost to the customer 3. All data and transactions are securely encrypted 4. City staff cannot view your online payments Link to Online Payments: https://www.tucsonaz.gov/pdsd/online-resources-fees-maps-records 1. Not case-sensitive but a hyphen is needed, e.g.: dp19-0000 2. Simply enter your Permit Nbr. and click the “Continue” tab 3. If any issues, try using the browser Internet Explorer. To view the review comments: www.tucsonaz.gov/PRO, enter Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.) Submit the following items to the PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, please include the Activity Number. 1) Comment Response Letter (listing your response to reviewer's comments) 2) Plan Set (all pages, full set) 3) Any other items requested by review staff Name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/29/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |