Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - OK TO SUBMIT
Permit Number - DP19-0158
Review Name: DEV PKG - OK TO SUBMIT
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/30/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
09/03/2019 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields, Section Manager PROJECT: COT Park & Ajo - Covered Parking with Solar Development Package (2nd Review), DP19-0158 TRANSMITTAL DATE: September 3, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). 1. 2-06.4.9.H.5.a Sheet 2 & 4 near the top of the sheet you show vehicle parking areas that are called out as "NEW PARKING LOT TO BE CONSTRUCTION UNDER SEPARATE PERMIT" & "OLD PARKING LOT TO BE DEMOED UNDER SEPARATE PERMIT". For clarity of this permit the vehicle parking needs to be shown in the current configuration, as shown on the last submittal, not some proposed and some existing. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
09/03/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
09/03/2019 | SBEASLE1 | WWM | REVIEW | Passed |