Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP19-0150
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/17/2019 | SBEASLE1 | ENGINEERING | REVIEW | Passed | |
| 06/17/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 06/26/2019 | MASHFOR1 | COT NON-DSD | FIRE | Approved | |
| 07/15/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Bank of America - Commercial Use Group / Financial Services Use Development Package (1st Review) - 7077 E. Tanque Verde Road DP19-0150 - C-1 Zoning / ADA Modifications to parking area and sidewalk TRANSMITTAL DATE: July 15, 2019 DUE DATE: July 16, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 14, 2020. 2-06.3.12 - An index of sheets in the development package shall be provided on the first sheet. 1. COMMENT: The sheet index shall include the sheet number i.e., 1 - SD0.00, 2 - SD00.00, 3, SD00.10 etc. CONTENT REQUIREMENTS 2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat; 2. COMMENT: Include in the title block of all plan sheets a brief legal description of the parcel, i.e. (SE QTR, SE QTR, SE QTR of Section 31 T.13S, R13E.) 2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx). 3. COMMENT: The sheet numbers in the title block shall be listed, 1 of 10, 2 of 10, 3 of 10 etc. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 4. COMMENT: Provide the development package case number, DP19-0150, adjacent to the title block on each sheet. 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile, and provide the following information. 2-06.4.4.A - Show the subject property approximately centered within the one square mile area; 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and, 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled. 5. COMMENT: The location map shall be drawn and include the information as noted by the standards above, 2-06.4.4 - 2-06.4.4.C. 2-06.4.7 - General Notes 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 6. COMMENT: Identify the use of the site as follows: Commercial Services Use Group - Financial Services Use, Subject to UDC Use Specific Standards 4.9.4.L.1 & .3 and 4.9.13.O 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. 7. COMMENT: The portion of the proposed ADA sidewalk between the planter and the parking space must be physically separated from the parking space (vehicular Use area) by means of constructing a raised concrete sidewalk with an ADA ramp or some form of curbing. If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 07/15/2019 | DAVID RIVERA | ZONING HC | REVIEW | Reqs Change | See zoning comments. |
| 07/16/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | The development package will contain the following identification in the lower right corner of each sheet: Provide the developmen case number, DP19-0150, adjacent to the title block on each sheet. Ensure that all Zoning and Engineering comments are addressed. |
| 07/17/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. The fee balance is $0 (zero). Thank you for your payment. Activity/Permit Number: DP19-0150 Project Description: SITE - Bank of America, ADA upgrades to exterior and interior. For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.) Please name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, please include the Activity Number. 1) Comment Response Letter (listing your response to reviewer's comments) 2) Complete Plan Set (all pages, full set) 3) Any other items requested by review staff Upon resubmittal, the plans will re-enter the standard 20-working-day review cycle. Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/17/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |