Permit Review Detail
Review Status: Completed
Review Details: TENTATIVE PLAT REVIEW
Permit Number - DP19-0128
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/17/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
05/04/2020 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | DP19-0128 / 811 S. 4th Ave / 2nd submittal is Approved by Pima County Addressing. Robin Freiman, Addressing Official Pima County Development Services Department (520) 724-7570 |
05/11/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: 811 S 4TH AV Development Package (1st Review) 811 S 4TH AV DP19-0128 - HR-3 Zoning TRANSMITTAL DATE: May 11, 2020 DUE DATE: May 12, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 23, 2020. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) *** This plan has not been drawn to comply with Administrative manual 2-06. Refer to 2-06 standards for requirements such as calculation, required notes etc. This parcel is within the Armory Park addition HPZ overlay. Additional review by the assigned PDSD design professional will be required. Any conditions related to the HPZ review must be addressed and incorporated into the Development package plans. 2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan. 5.This comment was not addressed correctly. The HPZ case number should be T19SA00491. COMMENT: 2-06.4.7.A.6 - Prior to zoning approval an HPZ application and approval must be completed. Any condition of the HPZ approval must be addressed and incorporated into the plan. List HPZ case numbers in the lower right hand corner. 2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks. 8.This comment was not addressed. COMMENT: 2-06.4.8.C - Provide the information noted by the standard above for the curbs and sidewalks 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. New comment 1. COMMENT: 2-06.4.9.Q - The provided street perimeter yard setbacks to not meet the requirements of UDC Article 6.4.5.C and do not qualify for the allowance in UDC Article 8.7.3.L.2. At a minimum the street perimeter yard reduction needs to be addressed during Historic review if not a Design Development Option will be required. If you have any questions about this transmittal, contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
05/12/2020 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Reqs Change | May 12, 2020 RE: DP19-0128 811 S. 4th Ave / 2nd Submittal, Received April 17, 2020 Thank you for the opportunity to comment on DP19-0128, 811 S. 4th Ave; 2nd Submittal, a development package application for a tentative plat and flexible lot development of an approximately 0.67 acre site, located southeast of the intersection of East 18th Street and South 4th Avenue. The property is zoned Historic Residence Zone 3 (HR-3) with the proposed development being a single family residential development, which would contain a combination of duplexes and single family homes. This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority conditionally approves the subject request contingent upon the following conditions of approval, as noted below. These conditions of approval shall be identified in the general notes of the revised development plan as Note 26 unless FAA staff, with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA), provides the project applicant with written communication that filing FAA Form 7460 is not required. Conditions of approval: 1. “According to the Federal Aviation Administration (FAA) Notice Criteria Tool, this project area is located in proximity to a navigation facility and could impact navigation signal reception. The project applicant shall file FAA Form 7460 with the FAA at least 45 days before construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA), provides the project applicant with written communication that filing FAA Form 7460 is not required. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp” Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, Senior Airport Planner Tucson Airport Authority |
05/13/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP19-0128 1) On the west side of the 3 parking spaces for lots 4,5,6 indicated if what is shown is a sidewalk and provide the width. It appears that the lot line of lot 6 has been adjusted to accommodate the sidewalk. Clarify if this is the case or if there is an access easement on the east side of lot side for the onsite circulation path to lots 5 and 4 2) For the driveway apron that will be closed off indicate that it will be replaced with a PAG standard detail curb 3) Provide the spacing between the southernmost proposed driveway apron and the exiting driveway apron on the property to the south. It appears that the minimum spacing of 12' is being maintained John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov |
05/18/2020 | FRANK PODGORSKI | HPZ ADVISORY BOARD | HPZ ADVISORY BOARD DATE | Approved | Approved on May 15, 2020. Jodie Brown, AICP Historic Preservation Officer Jodie.Brown@tucsonaz.gov City of Tucson |
05/18/2020 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | RETURNED FOR CORRECTIONS NOTICE Your Next Step: Resubmittal of documents NOTE: All City of Tucson offices (except for emergency services) will be closed on Monday, May 25, for the Memorial Day holiday. DESCRIPTION: TENTATIVE PLAT/FLD/HPZ - 811 S. 4th Ave, Lots 1-7 and common area "A" (private parking). PERMIT/ACTIVITY: DP19-0128 FEE BALANCE: $0 (zero) Thank you for the payment. SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on blue icon to the right of each document YOUR NEXT STEP: Submit documents to the Filedrop https://www.tucsonaz.gov/file-upload-pdsd NOTE: On the Filedrop page, select the box "Development Package or Land Division" for quickest processing 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff - Name the 3rd submittal documents starting with the submittal number, for example: 3_Plan_Set NOTE: The City of Tucson's Permit Counter at 201 N. Stone Avenue (the physical office) is closed to the public until further notice. Our staff is working remotely. All communications are by telephone or email. CONTACT US Monday-Friday, 8:00 am to 12:00 noon https://www.tucsonaz.gov/pdsd/virtual-service-counter For information or an over-the-counter review, sign in to the Virtual Service Counter and we will give you a call. Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services email: COTDSDPermits@TucsonAz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/18/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |