Permit Number: DP19-0127
Parcel: 116241110

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP19-0127
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/05/2019 SBEASLE1 START PLANS SUBMITTED Completed
06/06/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/06/2019 ALEXANDRA HINES ZONING REVIEW Reqs Change 1. Provide detail of stairs and handrail on plan set.
2. Provide detail of new concrete path and showcase run and fall dimensions are compliant with ADA requirements.

Alexandra Hines
06/06/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
Fee Balance: $1,084.60 (see the Balance column in the image below). Prior to the completion of the next review, we require payment of the total fees (or the Review fees at a minimum). You may pay in person at the City of Tucson permit counter or mail a check payable to the City of Tucson (see address below). Please write your Activity Number on the check stub.
Activity Number: DP19-0127
Project Description: SITE/GRADING - Sentinel Peak Park, trailhead ramada.
For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number.
(If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
After all corrections are made, please name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to)
2) Complete Plan Set (all pages, full set)
3) Any other items requested by review staff
After resubmittal, the plans will re-enter the standard 20-working-day review cycle.
Thank you.
Sharon Beasley, Permit Technician

City of Tucson
Planning and Development Services
Attn: Permit Counter
201 N. Stone Avenue, First Floor
Tucson, AZ 85701
06/06/2019 AHINES2 ZONING HC REVIEW Reqs Change See zoning comment.
06/06/2019 MARTIN BROWN COT NON-DSD FIRE Approved
06/06/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change This site is within:

5.2. HILLSIDE DEVELOPMENT ZONE (HDZ)

Add the following notes to cover sheet:

Vegetation Retention and Revegetation
a. Vegetation Retention
(1) Existing viable and transplantable trees with four inch or greater trunk diameter and cacti shall be preserved in their original locations, except for building sites and access and utilities serving building sites.
(2) When retention of the above trees and cacti in their original locations is not possible due to building site location, the trees and cacti shall be salvaged and replanted in areas requiring revegetation, whenever possible.
b. Revegetation
All cut or fill slopes that are no steeper than three horizontal to one vertical and all utility trenches or septic leaching fields that are not located in parking or driveway areas shall be revegetated in compliance with the following standards:
(1) All plants used in revegetation shall be the same as the native vegetation on the site prior to grading or clearing or any adjacent site; and,
(2) Revegetation shall be accomplished with the following minimum standards for plants:
(a) Desert trees, a minimum of 15-gallon size with a minimum trunk diameter of two inches measured at the soil level, or large specimen cactus shall be placed at the same vegetation density found on the site prior to any clearing, grubbing, or grading; and,
(b) Seeds for trees, desert shrubs, and grasses shall be planted with a density adequate to control erosion and may use one of the following methods of planting: Raked into the soil with appropriate mulch materials; hydroseeding; anchored mulches; or established on jute, rolled straw, or similar material. Another method may be approved by PDSD.
(3) A temporary watering system shall be installed until the revegetation materials are established.
3. Slope Stabilization
All slopes steeper than a ratio of three horizontal to one vertical, with the exception of retaining walls, shall be stabilized with properly engineered stone riprapping or sculptured rock as follows:
a. Stone riprapping shall be hand-placed on the slope;
b. The stabilizing material used shall blend with the natural appearance of the site or lot and the surrounding terrain; and,
c. Vegetation retention and revegetation should be used in conjunction with riprapping.
C. Color
All exposed exterior walls and roofs of structures, retaining walls, and accessory structures, except satellite dishes, shall be earth tone in color and shall blend with the predominant natural colors found on the lot or parcel. Satellite dishes may be black. White is not permitted.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/06/2019 SBEASLE1 OUT TO CUSTOMER Completed