| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/14/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 12/02/2019 | MGAYOSS1 | DESIGN PROFESSIONAL | REVIEW | Approved | Design Professional Review Comments Date: 2 December 2019 To: Maria Gayosso Planning and Development Services City of Tucson 201 N. Stone Avenue Tucson, AZ 85701 From: R. Fe Tom, AIA City of Tucson Design Professional Project: 127 S 5th Avenue IID-19-06 Re: Application Review Comments for 127 S 5th Avenue Development, Site and Building Plans: Activity #T19SA00227; Permit DP19-0122 The purpose of this document is to show the results of my review comments. The Applicant has submitted a new DP Package dated November 2019. The Applicant has revised the Development Plan drawings to show the following: 1) Pg. 2: IID Notes - Addition of notes detailing the requirements of the IID that was approved on 11/12/19. 2) Pg. 3: Modification to layout to parking stalls along southside of 1st floor parking garage, results in one additional parking space. 3) Pg. 3: Reduction of one parking stall at end of center bank of parking at 1st floor, results in 2 less spaces. 4) Pg. 3: Reduction of one parking stall at north end of 1st floor parking garage, results in 1 less parking space. 5) Pg. 3: Reconfiguration of parking space along west end of 1st floor parking garage, results in 2 additional parking spaces. 6) Pg. 10: Shade study reduction in total hardscape area and shade required. New calculation exceeds shade requirements. Based on the drawings, the alterations to the garage parking lot, the total parking spaces provided has not changed. Per the IPP, 50 parking spaces are approved, the reconfigured plan provides 50 parking spaces. I see this as a minor revision that does not impact the compliance with IID requirements, therefore I approve this change. End of Review Comments Richard Fe Tom, AIA COT Design Professional |
| 12/02/2019 | PAUL CAMARENA | ZONING | REVIEW | Approved | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Paul Camarena PDSD Zoning Review Section PROJECT: Multi-family - Residential Use Development Package (1st Review) 127 S. 5th Avenue DP19-0122 C-3 Zoning - IID-19-06; TRANSMITTAL DATE: November 26, 2019 DUE DATE: December 12, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 9, 2020. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) Section 2-06.3.0 FORMAT REQUIREMENTS 01. COMMENT: Zoning has done a review of the Development Package. Please a address the following comment 02. COMMENT: Zoning cannot approve the Development package until the Design Professional reviewer has approved the development package. If you have any questions about this transmittal, Contact Paul Camarena at (520) 837-4082 or by email Paul.Camarena@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THEOLLOWING IS REQUIRED: Revised development package |
| 12/04/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Approved | PLAN APPROVAL NOTICE / Request for documents Please follow the steps below. Permit/Activity Number: DP19-0122 Project Description: SITE/GRADING/IID - 127 S. 5th Ave, 8-story residential building. Fee Balance: $0 (zero). REPLY to this email and attach the following documents: 1. City of Tucson Permit: Checkmarked and signed (see attached) 2. Contractor Letter of Intent: Include the project title, project address, Activity Number, ROC license number After replying, please allow a few days for our staff to stamp the plans, upload them to PRO (www.tucsonaz.gov/pro), and send you a "Plan Issued" email notification. The email will include a link to the approved stamped plans and a list of required inspections. Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, 3rd Floor Tucson, AZ 85701 email: COTDSDPermits@TucsonAz.gov |
| 12/04/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
| 12/04/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/04/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |