Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP19-0104
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/06/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
05/07/2019 | MASHFOR1 | COT NON-DSD | FIRE | Approved | |
05/30/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
06/04/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. Activity Number: DP19-0104 Project Description: SITE - City of Tucson, solar, Ward 2B office, canopy mounted photovoltaic system. To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.) After all corrections are made, please name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, please include the Activity Number. 1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to) 2) Complete Plan Set (all pages, full set) 3) Any other items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero). Thank you. Sharon Beasley, Permit Technician City of Tucson Planning and Development Services Attn: Permit Counter 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
06/04/2019 | DAVID RIVERA | ZONING HC | REVIEW | Passed | |
06/04/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: DP19-0104 Solar Canopy (1st Review) 7575 E. Speedway Boulevard TRANSMITTAL DATE: June 4, 2019 DUE DATE: June 3, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: The property line has not been drawn correctly on the cover sheet. Revise the Property map to show the east property boundary in the correct location. 02. COMMENT: Include a cross section drawing of the canopy that includes the heights of the low and high ends of the canopy. 03. COMMENT: Label the building setback from the east property line (once it is corrected to the east edge of the canopy. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised DP |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/04/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |