04/30/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
04/30/2019 | SBEASLE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | A review is not required. This agency was notified for their information only. |
04/30/2019 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Passed | |
04/30/2019 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | A review is not required. This agency was notified for their information only. |
04/30/2019 | SBEASLE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | A review is not required. This agency was notified for their information only. |
05/01/2019 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
05/15/2019 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | (See PRO "Documents" section for one additional document.) WR#6272018 May 15, 2019 City of Tucson Attn: Sharon Beasley Planning and Development Services 201 N. Stone Avenue, First Floor Tucson, AZ 85701 Dear Ms. Beasley: SUBJECT: Jewish Comm. Ctr, DP19-0102 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted April 30, 2019. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. The Development Plan show a small building being built by the existing tennis courts on the campus of the JCC property. TEP doesn't have facilities in this area. Note 4 of Page 6 of the site plans, indicates "New Electrical by Others". This is not clear if it is intended to be served from customer's side. Service will need to be fed from the existing service. Because TEP is already serving this address from an existing 3Ø pad mount transformer TJC-3, any additional facilites or services that may be requested, would be billable to the customer (Excess Facilities). Even though these items will need to be addressed by the customer, the Development Plan will be approved. The approval is due to the fact it doesn't show, nor do we have TEP facilities in the area of the new building. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. If TEP is needed, please call the New Construction Department at (520) 918-8300. Approved plans will be required (including a site plan, electrical load plans, and electrical one line). If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Mr. Richard Harrington, New Business Project Manager P. O. Box 711 (DB101) Tucson, AZ 85702 520-917-8726 Should you have any technical questions, please contact the area Designer, Susie Petty, at (520) 917-8741. Sincerely, Linda Metzer, Office Support Assistant Design/Build cc: DSD_CDRC@tucsonaz.gov, City of Tucson (email) S. Petty, Tucson Electric Power |
05/20/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
05/20/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
05/21/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL The Development Package will contain the following identification in the lower right corner of each sheet: Any other relevant case numbers for reviews or modifications that affect the site. If applicable Indicate graphically, where possible, compliance with conditions of PAD document. ARTICLE 7: DEVELOPMENT STANDARDS 7.6. LANDSCAPING AND SCREENING No additional landscaping will be required. Ensure that all Zoning and Engineering comments and concerns are addressed. |
05/28/2019 | DAVID RIVERA | ZONING HC | REVIEW | Approved | |
05/28/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | Site address should be 3822 E River Rd. Please confirm and update as needed A floodplain use permit will be issued for this development plan once the address has been confirmed |
05/28/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: DP19-0102 - Jewish Community Center - New Recreation office Development Package (1st Review) / 3700 E. River Road DP19-0102 - PAD 8 TRANSMITTAL DATE: May 28, 2019 DUE DATE: May 29, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 26, 2020. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 1. COMMENT: Provide the development package case number, DP19-0102, adjacent to the title block on each sheet. 2-06.4.7.A.8.c - Percentage of building, lot area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included; and, 2. COMMENT: Include an expansion calculation based on the last approved DP. (additional Comments may be forthcoming based on the overall expansion as of the last full code compliance review. If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
05/29/2019 | SBEASLE1 | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are affected by this development. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation, (520) 837-8040 Howard.Dutt@tucsonaz.gov |
05/31/2019 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | |
06/03/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. Activity Number: DP19-0102 Project Description: SITE/GRADING - Jewish Community Ctr, tennis center, new accessory building in existing tennis court area. To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.) After all corrections are made, please name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, please include the Activity Number. 1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to) 2) Complete Plan Set (all pages, full set) 3) Any other items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero). Thank you. Sharon Beasley, Permit Technician City of Tucson Planning and Development Services Attn: Permit Counter 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/03/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |