Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP19-0079
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/15/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
04/18/2019 | MASHFOR1 | COT NON-DSD | FIRE | Approved | |
04/29/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
05/02/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Dutch Brothers - Grant and Swan - Commercial / Food Service Use Development Package (1st Review) DP19-0079 - C-1 Zoning / 4625 E. Grant Road TRANSMITTAL DATE: May 2, 2019 DUE DATE: May 13, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 2, 2020. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) Section 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 1. COMMENT: Provide the development package case number, DP19-0079, adjacent to the title block on each sheet. Clarify if the Dutch Brothers building will have a new address. If so list the address in the lower right corner of all sheets. 2-06.4.7.A.3 - If the plan/plat has been prepared in conjunction with a rezoning application, add the following note next to the existing zoning note: "Proposed zoning is ____." List the applicable rezoning file number and conditions of approval. Also place the C9-__-__ (if applicable) and the plan/plat file numbers in the lower right corner of each sheet. 2. COMMENT: Include with the next submittal the director's decision related to the proposed change of PDP. 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 3. COMMENT: Under general note 3, differentiate the existing use from the new use proposed on the same parcel. It is acknowledged that the use as listed in the UDC is the same but there are two different buildings on the site. Indicate on the site plan sheets if there is a proposal for outside seating. 2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 4. COMMENT: Dimension the PAAL area behind the four spaces just passed the existing concrete sidewalk. The PAAL appears to be 22 feet. The minimum PAAL width is 24 feet. 2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 5. COMMENT: Add a wheel stop to the north parking space in the 7 stall parking location next to the sidewalk, (adjacent to the building). 2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided. 6. COMMENT: There are two buildings on this parcel. 7.4.9.C.2.d - Where buildings have more than one public entrance or a site has more than one building, short-term bicycle parking must be distributed so that at least one short-term bicycle parking space is within 50 feet of each public entrance. Draw the public entrances to each building. Assure that the short term facilities are within 50 feet of a public entrance of each building. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. 7. COMMENT: Label the future back of curb location from the property line. Use the dimension per T.S. 10-01 150-foot cross section or what is required based on the intersection widening. Consult with TDOT for widening information at this location. 2-06.4.9.U - Indicate graphically, where possible, compliance with conditions of rezoning. 8. COMMENT: No additional response memo will be required for the rezoning conditions unless new or revised conditions have been proposed as part of the change of PDP. If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
05/02/2019 | DAVID RIVERA | ZONING HC | REVIEW | Approved | |
05/08/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP19-0079 1) Provide a dimension for the narrowest dimension of the PAAL located just north of the entrance off of Grant Rd. It appears to be less than the required 24'. This is where the east-west pedestrian circulation path crosses 2) Provide an ADA compliant pedestrian circulation path to Grant Rd. Show cross slopes and running slopes for all connecting sidewalks. Any curb access ramps along the path will need to be updated to current standards 3) Service vehicle maneuvering area in front of the trash enclosure is to be 40' deep. Please adjust as needed as the current plan shows the front maneuvering area to be about 35' deep. Reference City of Tucson Technical standards manual section 8-01.9.5.3 4) Verify that the drawdown time of the existing basin, which will be modified, is less than 12 hours 5) Per Stormwater Detention/Retention Manual section 3.4.2 provide a grade control marker for the proposed detention/retention basin. On the plans please also provide the coordinates of the grade control marker so that it can be easily located in the future John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
05/09/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. Activity Number: DP19-0079 Project Description: SITE/GRADING - Dutch Brothers, coffee shop with drive-thru. To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) After all corrections are made, name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, include the Activity Number. 1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to) 2) Corrected Plan Set (all pages, full set) 3) Items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. Prior to the completion of the next review, we require payment of the total fees (or the Review fees at a minimum). You can either pay in person at the permit counter or mail a check payable to the City of Tucson (address is below). Include the Activity Number on your check stub. The fee balance is $1,318.90 (see the Balance column in the image below). The Project Manager can be reached via email or phone: Andrew.Connor@TucsonAz.gov, (520) 837-4950. Thank you. Sharon Beasley City of Tucson Planning and Development Services Attn: Permit Counter 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
05/09/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. The landscape plan will contain the following identification in the lower right corner of each sheet: Any relevant case numbers for reviews or modifications that affect the site. Indicate graphically, where possible, compliance with conditions and objectives of rezoning Case # C9-87-62 Ensure that all Zoning and Engineering comments and concerns are addressed. Additional comments may apply |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/09/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |