Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP19-0038
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/19/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
04/22/2019 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
04/22/2019 | GARY WITTWER | COT NON-DSD | TDOT | Approved | TDOT LANDSCAPE - The comments from the first submittal have been addressed. There are no additional comments from TDOT LANDSCAPE. Thanks, David Marhefka |
04/29/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/02/2019 | EHAMBLI1 | ZONING HC | REVIEW | Reqs Change | See Zoning Review comments. |
05/02/2019 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approved | The Addressing review of DP19-0038 TCC Hotel, 2nd Submittal, is Approved by Pima County Addressing. The address 280 S Church Av has been issued for the TCC Hotel. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 4th Floor Tucson, AZ 85701 (520) 724-7570 |
05/02/2019 | ELISA HAMBLIN | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Planning and Development Services Department, Plans Coordination Office FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: TCC Hotel, 260 S. Church Av Development Package (2nd Review) DP19-0038 TRANSMITTAL DATE: May 2, 2019 DUE DATE: May 17, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 14, 2020. 1. 2-06.4.8.B - For existing easements, the recordation information, location, width, and purpose of all easements on site will be stated. Provide dimensions for existing easements. 2. 2-06.4.9.H.5.a - As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. Parking calculations have been provided on sheet 3, but must include a calculation for all components of the hotel. Include parking calculations on sheet 1 with running total on sheet 3. Per Section III.A.3.b. in the Tucson Community Center Planned Area Development (PAD-5), there are required parking calculations for: Hotel, Hotel Banquet Hall, Hotel Meeting Room, Hotel Ballroom, Hotel Courtyard, and Hotel Pool. Clarify that all proposed Hotel components are accounted for in the total. Clarify square footage for Hotel Courtyard per in-person discussion. 3. 2-06.4.9.H.5.b - Per separate discussions, off-site parking agreements will be postponed until C of O. Please indicate with appropriate notes in the parking calculations table. 4. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. Additionally, show on-site pedestrian circulation in conformance with Section III.A.3.d. in PAD-5. Demonstrate minimum pedestrian circulation is maintained on north sidewalk between any structural elements, planters and the building. If you have any questions about this transmittal, please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
05/02/2019 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Reqs Change | See Zoning Review comments. |
05/03/2019 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Reqs Change | May 2, 2019 Sharon Beasley Permit Technician City of Tucson Public Works Buildings - 201 North Stone Avenue Tucson, AZ. 85701 RE: DP19-0038 TCC Hotel, 2nd Submittal, Received April 19, 2019 Dear Ms. Beasley, Thank you for the opportunity to comment on DP19-0038, TCC Hotel, 2nd Submittal, a development package application for an approximately 2.08 acre site, located northwest of the intersection of South Church Avenue and West Cushing Street. The property is zoned Planned Area Development 5 (PAD-5), with the proposed development being a hotel. This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. Please revise the general notes of the development plan to include the below Condition of approval. This condition shall be identified in the general notes of the revised development plan. Condition of approval: 1. "According to the FAA Notice Criteria Tool, this project is located in proximity to a navigation facility and could impact navigation signal reception. The applicant shall file Form 7460 with the FAA at least 45 days before vertical construction activities begin for the project. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp" Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, Senior Airport Planner |
05/03/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
05/03/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. Activity Number: DP19-0038 Project Description: SITE/GRADING/SWPPP- TCC Hotel, construction of new hotel. To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) After all corrections are made, name your 3rd submittal documents accordingly, for example: 3_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, include the Activity Number. 1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to) 2) Corrected Plan Set (all pages, full set) 3) Items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero). The Project Manager can be reached via email or phone: Alexandra.Hines@TucsonAz.gov, (520) 837-6975. Thank you. Sharon Beasley City of Tucson Planning and Development Services Attn: Permit Counter 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/03/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |