Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP19-0038
Parcel: 11720029A

Address:
260 S CHURCH AV

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP19-0038
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/19/2019 SBEASLE1 START PLANS SUBMITTED Completed
02/19/2019 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed This agency was notified for their information only. A response/review is not required.
02/19/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed This agency was notified for their information only. A response/review is not required.
02/19/2019 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed This agency was notified for their information only. A response/review is not required.
02/20/2019 SBEASLE1 COT NON-DSD ENVIRONMENTAL SERVICES Approved Environmental & General Services has reviewed the Development Plan (DP19-0038) for the proposed TCC Hotel at 260 S. Church Avenue.
The waste generation calculations were reviewed and found to be accurate. The four 4 cubic yard containers (2 containers for refuse and 2 containers for recycle materials) will be rolled out of the building and positioned along Church Avenue for servicing. The servicing vehicle will not have to back up while collecting the refuse and recycle materials.
Based on this review, Environmental & General Services approves the proposed solid waste management plans for the TCC Hotel site.
Please let me know if there are any questions concerning this review.

Tom Ryan, P. E.
City of Tucson - Environmental & General Services Dept.
02/25/2019 JOE LINVILLE COT NON-DSD LANDSCAPE Reqs Change 02/21/19
Here are my comments:
1. Please add the standard notes for planting in the ROW - see attached.
2. Giant hesperaloe will need to be set back a min. of 5' off sidewalk in all areas.
3. Any cactus, yucca or agave with thorns needs to be set back off the sidewalk.

Gary Wittwer
TDOT Landscape
Gary.Wittwer@TucsonAZ.gov
520-791-5100
02/28/2019 MASHFOR1 COT NON-DSD FIRE Reqs Change New Fire Hydrant needs to be established on the plan set north side by Main Entrance for access to water source for Fire Ops per TFD.
03/01/2019 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Reqs Change February 27, 2019
Sharon Beasley
Permit Technician
City of Tucson
Public Works Buildings - 201 North Stone Avenue
Tucson, AZ. 85701
RE: DP19-0038 TCC Hotel, Received February 19, 2019

Dear Ms. Beasley,
Thank you for the opportunity to comment on DP19-0038, TCC Hotel, a development package application for an approximately 2.08 acre site, located northwest of the intersection of South Church Avenue and West Cushing Street. The property is zoned Planned Area Development 5 (PAD-5), with the proposed development being a hotel.
This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority conditionally approves the subject request contingent upon the following condition of approval, as noted below. This condition shall be identified in the general notes of the revised development plan.
Condition of approval:
1. "According to the FAA Notice Criteria Tool, this project is located in proximity to a navigation facility and could impact navigation signal reception. The applicant shall file Form 7460 with the FAA at least 45 days before vertical construction activities begin for the project. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes used which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp"
Although this project does not propose a change in plan designation or zoning the Tucson Airport Authority highly recommends the City of Tucson consider requiring the applicant to add the following note into the general notes of the revised development plans. This project is located approximately 6 miles northwest of Tucson International Airport and is within FAA traffic pattern airspace, an area which would be subject to aircraft overflight and noise due to being in close proximity to Tucson International Airport.
The proposed note would provide a means of assuring that future owners and tenants of the property are aware they are in proximity an airport and further assures the continued right of the City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson International Airport the right to utilize the airspace above or near the property. This would be accomplished through requiring the property owner to record the Avigation Easement. The Tucson Airport Authority believes the proposed note helps to support the City of Tucson Airport Environs Overlay Zone and supports Plan Tucson - Regional and Global Positioning policy 4 (RG-4).
1. "That prior to the City's approval of any construction permit for a permanent building, the property owner shall record the Avigation Easement which discloses the existence, and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The Avigation Easement shall be recorded in a manner with the Pima County recorder which shall document it as having title liability. The content of such documents shall be according to the form and instructions provided."
The current property owner or person authorized to sign on behalf of the current property owner shall complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder's Office. Once the Avigation Easement is recorded please send a complete copy of the recorded easement document to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below.
Scott Robidoux
Senior Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard
Suite 300
Tucson, AZ 85756

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,
Scott Robidoux, Senior Airport Planner
03/07/2019 CLAURIE1 DESIGN PROFESSIONAL REVIEW Completed The PAD supersedes the RNA. If design review is required, please contact John Beall.
03/14/2019 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this development.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation
(520) 837-8040
Howard.Dutt@tucsonaz.gov
03/14/2019 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved **Two PDF attachments from TEP can be viewed on PRO in the "Documents" section**

3/13/19
Regards,
Linda Metzer
Tucson Electric Power
4350 E. Irvington Rd.
Tucson, AZ 85702
OH201
Design Office Support Assistant
LMetzer@swenergysolutions.com>
(520) 918-8388
03/19/2019 EHAMBLI1 ZONING HC REVIEW Reqs Change See Zoning Review comments.
03/19/2019 ELISA HAMBLIN ZONING REVIEW Reqs Change CDRC TRANSMITTAL
TO: Planning and Development Services Department, Plans Coordination Office
FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: TCC Hotel, 260 S. Church Av
Development Package (1st Review)
DP19-0038

TRANSMITTAL DATE: March 18, 2019
DUE DATE: March 19, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 14, 2020.

1. 2-06.4.1 - On sheet 1, the applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines.

2. 2-06.4.3 - Adjacent to the title block on all sheets, add case C9-17-10 to the relevant case numbers. Also update the current case number to DP19-0038. If case number is assigned for Rio Nuevo Area review, also include on the plans.

3. 2-06.4.7.A.4 - Amend or add a general note to include the total number of hotel rooms and square footage assigned to other uses in the proposed hotel.

4. 2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any. The Tucson Community Center is located within the Rio Nuevo Area. As such, compliance with Article 5.12.7 of the UDC must be demonstrated, including design standards and review by appropriate review bodies. When RNA review is complete, include appropriate information on the plan set.

5. 2-06.4.4.B - On the location map on sheet 1, identify regional watercourses within the square mile area.

6. 2-06.4.8.B - Verify all existing easements have been drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.

7. 2-06.4.8.C - Provide full right-of-way information for all streets adjacent to the site, include type and dimensioned width of paving, curbs, curb cuts, and sidewalks. As all adjacent streets have a width greater than 50, the existing conditions across the street will be provided.

8. 2-06.4.9.H.5.a - As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. Parking calculations have been provided on sheet 3, but must include a calculation for all components of the hotel. Include parking calculations on sheet 1 with running total on sheet 3. Per Section III.A.3.b. in the Tucson Community Center Planned Area Development (PAD-5), there are required parking calculations for: Hotel, Hotel Banquet Hall, Hotel Meeting Room, Hotel Ballroom, Hotel Courtyard, and Hotel Pool. Clarify that all proposed Hotel components are accounted for in the total.

9. 2-06.4.9.H.5.a - Clarify the parking calculations on sheet 3. Do the total parking spaces for Parking Lot A include all the spaces planned to the east of the new hotel?

10. 2-06.4.9.H.5.b - If any of the required parking is located off-site as permitted by the UDC, a drawing of that parking area is to be provided, together with the city's required parking agreement (include a copy of the lease agreement if applicable) must be provided. Please remember that in these situations, if the off-site parking location is a new parking area, it must comply with all parking area requirements and must be allowed as a principal use by the zoning classification of that property. If the off-site parking area location is an existing parking lot, the parking spaces utilized for the proposed land use must be non-required parking for the existing use for which the parking area was established.

11. 2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Long-term bicycle parking location must be indicated and information meeting locker or location standards provided. Per UDC Article 7.4.9.C.2 "Short-term bicycle parking must be: within 50 feet of each public entrance to a building as measured along the most direct pedestrian access route." Demonstrate compliance with this standard.

12. 2-06.4.9.H.5.d - Provide, as a note, calculations for short and long term bicycle spaces required and provided. Bicycle parking calculations have been provided on sheet 1, but only for the hotel use. Per PAD-5, bicycle parking spaces are not provided on a use-specific basis, but rather for the entire PAD. Section III.A.3.g. states bicycle parking shall be "5% of the total number of vehicle parking spaces provided with the Plan area is required, of which 25% shall be Class I and 75% Class II. The bicycle parking spaces shall be evenly distributed throughout the TCC PAD area." Demonstrate compliance with this standard.

13. 2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval. Include required information and verify all proposed easements have been indicated on the plans.

14. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. A 30' setback has been indicated on the plans from Cushing St. However, the transitional buffer must be indicated separately. The transitional buffer extends from the property line and varies in width from 30' to 120' at the main TCC building. The depth of the buffer is roughly 65' at the west edge of the proposed hotel. Within the transitional buffer, the maximum building height is 25' and the minimum building setback is 30'. Indicate compliance with this standard by indicating the buffer boundary and the height of the building within the buffer. Information relating to the buffer size (including exhibit) and building height was previously provided at a CDRC Pre-submittal meeting with the applicant on July 26, 2018.

15. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s). Per preceding comment, indicate if different heights are proposed on different portions of the building.

16. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. Additionally, show on-site pedestrian circulation in conformance with Section III.A.3.d. in PAD-5. Demonstrate minimum pedestrian circulation is maintained on east sidewalk between planters and vehicle overhang area. Demonstrate minimum pedestrian circulation is maintained on north sidewalk between planters and the building.

If you have any questions about this transmittal, please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/20/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
03/20/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS
4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
The landscape plan will contain the following identification in the lower right corner of each sheet:
Any relevant case numbers for reviews or modifications that affect the site.
7.6. LANDSCAPING AND SCREENING

Indicate graphically, where possible, compliance with conditions of PAD-5 document.
DEVELOPMENT AREA D
d) Minimum landscape requirements: 9% of gross site area, in addition to any street landscape borders or parking lot screening required by City codes for vehicular parking areas. (see Section IIIA for Cushing Street edge treatment).
Landscaping/Screening Landscape Design:
Landscape materials shall enhance the major architectural design elements through the coordinated use of flower and leaf colors, tree forms, plant material masses, and lighting. Grouped masses of plant material shall be designed to complement architectural elevations and rooflines through color, texture, density and form on both the vertical and horizontal planes.
Wherever feasible, native or adaptive, drought-tolerant plant material shall be used. Appropriate plant materials shall be used to define space, create a visual image and separate differing land uses.
Landscaping shall consider solar rights of adjacent structures.
All landscaping shall comply with sight visibility triangles as established in the City of Tucson Street Development Standards.
Inclusion of landscape best management practices of rainwater harvesting applications as an additional plant irrigation resource Project Entries/Streetscapes:
Landscaping shall establish project identity and accentuate common entrance areas, as well as enhance the character and quality of the existing landscape and hardscape in the Tucson Community Center.
The TCC streetscape design shall be compatible with the guidelines in the Downtown Comprehensive Street Tree Plan.
Streetscape design shall incorporate a coordinated landscape palette that includes a mix of canopy trees, shrubs, and groundcover. Canopy trees shall be utilized to provide shade and promote unity in the streetscape.
The streetscape design shall cover areas within street medians, parking areas visible from public streets, and, where appropriate, the street edges of each development area. Landscaping shall be interspersed within parking areas and used to screen parking areas from public streets and adjacent residential neighborhoods.
All new parking shall be designed so that vehicles are not visible from the adjoining street level, through incorporation of any of the following: pedestrian arcades, occupied space, display space, vegetative screening, or berms.
Tucson Community Center Planned Area Development 24 The Cushing Street edge treatment shall be designed as a landscape promenade which encourages pedestrian movement and provides landscape plazas, where neighborhood activities such as craft fairs, can occur.
Preservation of the existing view corridor from the Fremont House to Granada Avenue for pedestrian access and public visibility shall be encouraged. Landscaped Plazas: Plazas within the interior of the Planned Area Development area shall be designed to create an inviting atmosphere for outdoor congregation, with such features as canopy trees for shade, comfortable outdoor seating, where appropriate.

Use of the Public Right-of-Way
Landscaping may be placed in the public right-of-way, if the following standards are met:
1. The landscaping is approved by the City Engineer or designee and complies with the City Engineer's standards on construction, irrigation, location, and plant type;
2. All vegetation complies with the standards of Section 7.6.4, Landscaping Standards; and,
3. The landscaping does not interfere with the use of the sidewalk.
Ensure that all zoning comments are addressed.
Additional comments may apply.
03/20/2019 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Reqs Change See Zoning Review comments.
03/20/2019 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
03/20/2019 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change **The PDF attachment mentioned here can be viewed on PRO in the "Documents" section**

The Addressing review of DP19-0038 TCC Hotel, 1st Submittal, is being Returned for Corrections by Pima County Addressing.
The attached pdf contains Addressing’s comments.
Please let me know if you have any questions.Thank you,

Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AVE, 4th Floor, Tucson, AZ 85701
(520) 724-7570
03/22/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change DP19-0038
1. Clearly show how water harvesting is maximized. (UDC 7.6.6.C)
03/25/2019 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
Activity Number: DP19-0038
Address: 260 S CHURCH AV
Project Description: SITE/GRADING/SWPPP - TCC Hotel, construction of new hotel
To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)

After the necessary corrections have been made, name your documents accordingly - a 2nd submittal document would be titled: 2_Plan_Set.
Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, enter the Activity Number.
1) Comment Response Letter (lists changes to the Plan and which review comments are being addressed)2) Corrected plan set with all documents (the full set)
3) Items requested by review staff
After resubmittal, the plans will re-enter the standard 20-working-day review cycle.
The fee balance is $0.
Alexandra Hines, AICP
Lead Planner at Planning and Development Services, City of Tucson
201 N Stone Ave 1st Floor, Tucson, AZ 85701
(520) 837-6975 - alexandra.hines@tucsonaz.gov
03/25/2019 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved Regional Traffic Engineering has no comments on this submittal and supports
its acceptance. The project location will have no significant affect to any
nearby ADOT facilities. Thank you

Tom Martinez <tmartinez@azdot.gov>

Final Status

Task End Date Reviewer's Name Type of Review Description
03/25/2019 AHINES2 OUT TO CUSTOMER Completed