Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Permit Number - DP19-0029
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/03/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
04/22/2019 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Reqs Change | (The PDF attachment mentioned here can be viewed on PRO in the "Documents" section) The Addressing review of DP19-0029, Wingate Phase 1A & 1B, 2nd Submittal is being Returned for Corrections by Pima County Addressing. The attached pdf is only the Cover Sheet which contains the two small items Addressing needs corrected. Please let me know if you have any questions. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV 4th Floor, Tucson, AZ 85701 (520) 724-7570 |
04/23/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
04/23/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Wingate Phases 1A and 1B - SFR FLD Development Development Package (2nd Review) Lots 1-122 / Common Areas "A" DP19-0029 - R-1 Zoning Per Rezoning case C9-86-40 (effectuated) TRANSMITTAL DATE: April 23, 2019 DUE DATE: April 29, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is February 05, 2020. 1. Follow up to pervious comment 10: This parcel is zoned R-1. Per table 6.3.2.A Dimensional Standards, perimeter building setbacks (subdivision perimeter boundary), the required building setback is the greatest of 6 feet or 2/3 the building height. Per detail 5 on sheet five the perimeter yard building setback is listed as 10' or ¾ (H). Revise the perimeter yard setback for consistency with the UDC standards. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. Previous comment 10: Under the tabulations section of the cover sheet, specifically the setbacks; the building height is proposed at 25 feet. Street setbacks must be a minimum of 25 feet from the nearest edge of travel lane, based on the proposed height. The street setback note states 21 feet. Revise it to indicate 25 feet. (Actual setbacks are reviewed at time of the application for a building permit.) 2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD - ADDITIONAL REQUIREMENTS) ***The following standards are elated specifically to the FLD regulations. Add the notes, calculations, drawings or details necessary to indicate compliance. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
04/25/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Revise the site drawing to include the following existing utility information: a. Show the proposed connection point for each lot. (you do seem to call out the manholes as "existing") [Initial comment: The points of connection to existing public sewers.] b. Provide the first floor elevations. [Initial comment: The first floor elevation for the buildings. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole in the public sewer or private sewer collection system, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor. Floors discharging from above that reference point shall not discharge through the backwater valve. Reference: Section 714.1, IPC 2018 as amended by the City of Tucson.] Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2018 |
04/26/2019 | ALEXANDRA HINES | DESIGN PROFESSIONAL | REVIEW | Approved | Prior to building permits, applicant required to revise DP19-0029. Applicant opted to defer submittal of the AVP and PMP. |
04/29/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
05/01/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/02/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. Activity Number: DP19-0029 Project Description: TENTATIVE PLAT/FLD - Wingate, Phases 1A and 1B. An FLD Subdivision, Lots 1-227, Together with Common Areas "A" (Landscape, Drainage & Public & Private Utilities), Functional Open Space. To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) After all corrections are made, name your 3rd submittal documents accordingly, for example: 3_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, include the Activity Number. 1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to) 2) Corrected Plan Set (all pages, full set) 3) Items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero). The Project Manager can be reached via email or phone: John.VanWinkle@TucsonAz.gov, (520) 837-5007. Thank you. Sharon Beasley City of Tucson Planning and Development Services Attn: Permit Counter 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/02/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |