Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP19-0022
Parcel: 11450023C

Review Status: Completed

Review Details: GRADING

Permit Number - DP19-0022
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/13/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change These comments apply to both DP19-0296 and DP19-0022. The two projects are correctly submitted separately. Since they are related, the drainage analysis must address both projects and must be submitted with both projects.
1. The Environmental Resource Report and the civil engineer's response both reference the drainage report. Provide copy of the drainage report along with the next submittal.
2. Include a complete engineering analysis for reducing the fill pad. Include a discussion of required toe-down of the riprap slope protection. The justification must include a discussion of expected flow velocities at the margins of the fill pad and must be supported by appropriate analysis.
3. The drainage statement submitted with DP19-022 ("Drainage Statement 8721 E Woodland Parcel #:1145023B & C, Dated November 1, 2018) doesn't meet any basic requirement in support of these developments. The following requirements must be included in the report.
a. Encroachment analysis for both fill pads with sufficient calculations and modeling to establish there will be no adverse impacts to adjacent properties.
b. Engineering discussion of expected velocities adjacent to the fill pad with appropriate calculations of rip-rap sizing and toe-down depth.
02/14/2019 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: DP19-0022 - New detached metal building (Accessory use?)
Grading plans (1st Review)
8721 E. Woodland Road

TRANSMITTAL DATE: February 14, 2019

DUE DATE: February 15, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Zoning has reviewed the grading plans for the proposed location of the detached metal building but cannot approve them at this time. Please address the following comments and resubmit the plans with a separate response memo detailing how the zoning comments have been addressed.

A detached accessory structure cannot be permitted on a residential parcel without a principal structure (Dwelling). A permit for a dwelling on this parcel along with a complete plot plan for the residential use and detached accessory structure is required with the next submittal.

All detached accessory structures in a residential zone shall not exceed 50% the square footage of the existing or new dwelling.

The height of a detached accessory structure in a residential zone is 12 feet. The proposed metal building height is listed as 22 feet. A Board of Adjustment variance approval is required in order to construct an accessory structure greater than12 feet in height.

2. COMMENT: Add the DP stamp to all grading plan sheets for plan reviewer signatures. The digital stamp can be downloaded from the PDSD web site.

3. COMMENT: List the DP case number DP19-0022 in the lower right corner next to the title block of all sheets.

4. COMMENT: Zoning will not be able to approve the grading plan until it is verified whether or not a dwelling will be constructed on this parcel. The accessory structure cannot stand alone on this SR zone parcel.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email at David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov
02/14/2019 ANDREW CONNOR NPPO REVIEW Reqs Change Submit ERR electronically for review.

Over the counter review is available.

Ensure that Zoning and Engineering comments are addressed.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/25/2019 SBEASLE1 OUT TO CUSTOMER Completed