Permit Number: DP19-0003
Parcel: 11504602G

Address:
880 E 2ND ST

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP19-0003
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2019 SBEASLE1 START PLANS SUBMITTED Completed
01/10/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL
SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS
4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
Clearly identify correct property lines and Right of Way's on the landscape plans.
The landscape plan will contain the following identification in the lower right corner of each sheet:
" Any relevant case numbers for reviews or modifications that affect the site.
If landscape replacement is proposed within the Pubic ROW the following applies
Use of the Public Right-of-Way

Landscaping may be placed in the public right-of-way, if the following standards are met:

1. The landscaping is approved by the City Engineer or designee and complies with the City Engineer's standards on construction, irrigation, location, and plant type;

2. All vegetation complies with the standards of Section 7.6.4, Landscaping Standards; and,

3. The landscaping does not interfere with the use of the sidewalk.

Ensure that all Zoning and Engineering comments and concerns are addressed.

Additional comments may apply
02/08/2019 NICHOLAS ROSS ZONING REVIEW Reqs Change The lot lines have changed since the previously approved site plan. Please accurately show the new property boundaries and include the second parcel (11504609B) that lies within the main parcel (11504602G). These lot lines must show accurate distance and bearing.

When correcting the property boundary please also show the full extent of 2nd Street to the north, Tyndall Avenue to the east, and University Blvd to the south.

Once these changes have been made, please contact me directly upon your second submittal and I can approve for Zoning in person at the Zoning Counter. If you have any questions my contact info is Nicholas.Ross@tucsonaz.gov or 520-837-4029.
02/11/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The review has been completed and a resubmittal is required.
Activity Number: DP19-0003
Project Description: SITE/LANDSCAPE - MARRIOTT UNIVERSITY PLAZA HOTEL

To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made, submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. Please enter the Activity Number in the Project Description field and name the file as directed, for example, second submittal: 2_Plan_Set.pdf. The plans will then re-enter a 20-working-day review cycle.­
1) Comment Response Letter
2) Corrected plan set with all documents
3) Items requested by review staff
The current fee balance is $ 346.50 (see image below). Review fees must be paid prior to the next submittal review. Please include the Activity Number on your check stub. Thank you.

Sharon Beasley
City of Tucson
Planning and Development Services
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
02/11/2019 SBEASLE1 OUT TO CUSTOMER Completed