Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP18-0311
Parcel: 141185480

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0311
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/08/2019 SBEASLE1 START PLANS SUBMITTED Completed
02/26/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change SECTION 4-01.0.0: COMMERCIAL RAINWATER HARVESTING
Provide a separate Water Harvesting Implementation Plan.
The plan shall detail the landscape water demand and the harvested water supply needed to meet 50 percent of landscape demand.
Provide a separate WHIP with information only pertaining to water budget data, along with the background data and assumptions used to develop it.
Ensure that all Zoning and Engineering comments and concerns are addressed.
Additional comments may apply
02/26/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
02/27/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Pine Center - Personal Storage Use
Development Package (1st Review) 9467 Old Vail Road
DP18-0311 - I-2 Zoning

TRANSMITTAL DATE: February 27, 2019

DUE DATE: March 11, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 24, 2019.

1. Follow up to Previous Comment: 8: Revise general note 3 to correctly sate the use specific standards. See previous comment 8.

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

Previous Comment 8: List the Use Specific Standards that apply to the Personal storage in the I-1 zone, 4.9.10.C.3 & .6 and 4.9.13.Q


2. Follow up to Previous Comment 9: The AEZ comments were not addressed on the plan or in your response memo. Review the AEZ comments and add the information as noted below in previous comment 9. Include a general note that states that this development will be designed to comply with the UDC Section 5.6 AEZ Regulations.

2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

Previous Comment 9: This parcel is not within the GCZ, remove the GCZ note from general note 16.

However the parcel is within the Davis Monthan AEZ overlay zone, specifically within the Noise Control District NCD-A, and within the Approach Departure Corridor ADC-3.

In the NCD-A the Office building must be sound attenuated to reduce the noise level to 40-45 Ldn in accordance with Technical Standards Manual.

In the ADC-3 overlay the following three items under the 5.6.8.C.1.a, .c, .d apply to this project;
.a for uses in the Industrial, Wholesaling and Storage land use groups, the maximum FAR is .40 of the project site area;
.c the minimum project site area is five acres; See UDC 5.6.8.C.3.c and .d for exception to 5 acre requirement.
.d a 62 foot height limitation; (for this project the maximum height of the buildings is below the maximum allowed by this development criteria.)



If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/12/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. As previously commented: The service approach to the northerly solid waste container enclosure encroaches into the parking space. Revise to remove the conflict.
03/13/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
Activity Number: DP18-0311
Project Description: E SITE/GRADING - THE PINE CENTER, Storage facility
To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. Name your documents in the following manner - a 3rd submittal document would be titled: 3_Plan_Set.
After the necessary corrections have been made, submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd
In the Project Description field, enter the Activity Number.
1) Comment Response Letter
2) Corrected plan set with all documents
3) Items requested by review staff
After submittal, the plans will then re-enter a 20-working-day review cycle. The fee balance is $0 (zero). You may contact the Project Manager via email: Loren.Makus@TucsonAz.gov or phone: (520) 837-4927.
Thank you.

City of Tucson
Planning and Development Services
Attn: Sharon Beasley
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
03/13/2019 SBEASLE1 OUT TO CUSTOMER Completed