Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP18-0302
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/14/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Reqs Change | January 14, 2019 ACTIVITY NUMBER: DP18-0302 PROJECT NAME: Foothills Storage PROJECT ADDRESS: 4068 E Ft Lowell PROJECT REVIEWER: Zelin Canchola TDOT Resubmittal Required: The following items must be revised and added to the Development package. 1. Improvements within the right of way must be shown on plan. Show Driveway, Sidewalk, unused curb cuts to be closed, dimensions and refer to PAG Standards details. 2. At time of construction a private improvement agreement (PIA) will be required for work within the right of way for the turn lane shown on the plan. If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov |
01/15/2019 | DAVID RIVERA | ZONING HC | REVIEW | Reqs Change | see zoning comments. |
01/15/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the site utility plan to include the invert and rim elevations of the upstream and downstream manholes along with the Pima County Wastewater Management Department (PCWMD) reference number. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2012. 2. Horizontal drainage piping (i.e. building sewer) shall be installed at a minimum slope in accordance with table 704.1, IPC 2012. A 0.5% slope is allowable for pipe 8" or larger only. 3. The sanitary sewers serving a single building on private property shall be constructed per the International Plumbing Code as adopted by the City of Tucson. |
01/15/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Foothills Storage - Commercial Use / Personal Storage Development Package (1st Review) Related to C9-18-05 DP18-0302 - Proposed Zoning is C-2 4068 E. Fort Lowell Road TRANSMITTAL DATE: January 15, 2018 DUE DATE: January 16, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 13, 2019. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) Section 2-06.3.0 FORMAT REQUIREMENTS 2-06.3.4 - A title block shall be provided in the lower right quadrant of each sheet. 1. COMMENT: Provide a title block in the lower right corner of all plan sheets including landscape sheets. The information in the title block shall be consistent on all sheets. 2-06.3.8 - The north arrow, contour interval, and scale as applicable to each sheet should be placed together in the upper right corner of each sheet. 2. COMMENT: Provide a north arrow and scale on sheets C1 and C2. 2-06.3.9 - The plan drawing shall be oriented with north toward the top of the sheet. If it is not practical to orient north to the top of the sheet, the plan drawing shall be oriented with north to the left side of the sheet. 3. COMMENT: Sheets C1 and C2 shall be oriented with north to the top of the sheet or to the left side of the sheet as noted by the standard above. 2-06.3.10 - A legend that shows and describes all symbols used on the drawing is to be provided, preferably on the first sheet. 4. COMMENT: Provide symbol and lines legend on the cover sheet. CONTENT REQUIREMENTS: 2-06.4.1 - The name, mailing and email addresses, and phone number of the primary property owner of the site, the developer of the project, registrant(s), and other person(s), firm(s), or organization(s) that prepared the development package documents shall be provided on the right half of the cover sheet. The applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines. 5. COMMENT: Relocate the project directory information to the cover sheet. List Robert W. Kubicek's information on the cover sheet. 2-06.4.2 - The title block shall include the following information and be provided on each sheet: 2-06.4.2.A - The proposed name of the project or subdivision, or if there is no name, the proposed tenant's name; 2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat; 2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet 1 of 11, 2 of 11, 3 of 11 etc). 6. COMMENT: Add to the title block on all plan sheets the information as noted in the standards above 2-06.4.2 through 2-06.4.2.D 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 7. COMMENT: Provide the development package case number, DP18-302, adjacent to the title block on each sheet. List next to the title block on all plan sheets the administrative street address. 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile, and provide the following information. 2-06.4.4.A - Show the subject property approximately centered within the one square mile area; 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and, 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled. 8. COMMENT: Revise the location map on the cover sheet as noted by the standards above, 2-06.4.4 through 2-06.4.4.C. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2-06.4.7.A.3 - If the plan/plat has been prepared in conjunction with a rezoning application, add the following note next to the existing zoning note: "Proposed zoning is ____." List the applicable rezoning file number and conditions of approval. Also place the C9-__-__ (if applicable) and the plan/plat file numbers in the lower right corner of each sheet. 9. COMMENT: List as a general note the proposed zoning and rezoning case number and list the conditions of rezoning. List the rezoning case number in the lower right corner next to the title block of all plan sheets. 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 10. COMMENT: Revise General note 2 to include the proposed use is for "Personal Storage" and list the applicable Use Specific Standards listed in Table 4.8.4. 2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan. 11. COMMENT: Fort Lowell Road is list as a major street and route on the Adopted MS&R map. The future right of way for Fort Lowell road in this area is a total of 100 feet per the MS&R map. Clarify when the dedication of right of way is to occur? Contact TDOT for dedication process and requirements. 2-06.4.7.A.8 - For development package documents provide: 2-06.4.7.A.8.d - When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. If the project is being phased, calculations must show that, at each phase, requirements are being met. 12. COMMENT: Revise the lot area calculations to be specific as it relates to the rezoning site and the storage site. While the rezoning includes a commercial component the storage area is a stand-alone site and the calculations should be based on the storage site only. Under the site data text block revise the site area calculations. 2-06.4.8 - Existing Site Conditions: The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 13. COMMENT: Provide on the site sheets the information as noted by the standard above. 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system. 14. COMMENT: Verify that the site boundary distances and bearing are consistent on all plan sheets. Add the distance and bearing of the new lot line related to the dedicated area. This project site is comprised of four individual parcels. Prior to approval of the DP a Pima County Tax Parcel combo will have to be completed. Provide the completed and Pima County approved documentation for the lot combo. 2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided. 15. COMMENT: If applicable add the easement information as noted by the standard above. 2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks. 16. COMMENT: Draw, label and dimension the information for Fort Lowell Road as noted by the standard above. 2-06.4.9 - Information on Proposed Development: The following information on the proposed project shall be shown on the drawing or added as notes. 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements. 17. COMMENT: Label the zoning classifications on the site plan sheet as noted by the standard above. 2-06.4.9.G - If the project is to be phased, provide calculations, setbacks, etc., to indicate that each phase complies with all requirements as a separate entity. Show phase lines on the drawing. Show and label any temporary improvements that may be needed to make the site function for each phase as one entity. If such temporary improvements are off the site of the phase under consideration, a temporary easement or other legal documentation to assure legal use of the property is required. Note recording information. 18. COMMENT: It does not appear that the PDP in the rezoning case was drawn or proposed as a phased development. Screen the line work for the commercial development and add a note that submittal of a separate development package for the commercial development for review and approval will be submitted to PDSD. 2-06.4.9.H.2 - Show future and existing sight visibility triangles. On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section. 19. COMMENT: Draw and label the current and future sight visibility triangles. 2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned. 20. COMMENT: Label Fort Lowell Road as a "Public Street". 2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. 21. COMMENT: Provide wheel stops for the parking spaces along the south west parking area to keep vehicles from overhanging onto the landscape areas. The extruded curbing can be relocated 2.5 feet from the front of the parking spaces providing for an 18 foot space but with a clear 2.5 foot overhang. A four foot wide sidewalk must be provided between the parking spaces and the north side of Building B. Wheel stops shall be provided 2.5 feet from the front of the parking spaces to keep vehicle from overhanging the sidewalk. Add dimensioned details drawing for the standard and accessible vehicle parking spaces as noted by the standard above. Label the size of the parallel parking spaces, minimum size is 8 feet by 23 feet. 2-06.4.9.H.5.c - Show all loading zones, vehicle maneuverability fully dimensioned, and access route. Provide as a note the number of loading spaces required, the number provided, whether the loading space is a Type A or B as provided in UDC Section 7.5.4. 22. COMMENT: Add a loading zone calculation that includes the number of loading zones and type required and number provided. That calculation should be based on the square footage of the buildings without direct vehicular access. 2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided. 23. COMMENT: Two short term bicycle parking spaces are required for the office use. Draw and label the short term bicycle parking location. The facility must be within fifty feet of the public entrance to the office area. (Draw and dimension the office area on the site plan sheet for reference.) Include a dimensioned detail drawing of the short term facility type specific to the proposed location on the site. Include a bicycle parking calculation listing the number of short term spaces required and number provided. 2-06.4.9.I - Show all right-of-way dedications on or abutting the site and label. If the development package documents have been prepared in conjunction with a subdivision plat or is required as a condition of approval of a review process, such as a rezoning, street dedications in accordance with the Major Streets and Routes (MS&R) Plan may be required by these processes. Projects bounded by streets having only a portion of the right-of-way width dedicated will be required to dedicate right-of-way, up to one-half, to complete the street width. Should there be any proposed street or alley vacation, provide this information. If vacation has occurred, include the recording information. 24. COMMENT: See related comment 11. 2-06.4.9.J - If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way lines for those streets. (Add the MS&R future sidewalk, right-of-way lines, sight visibility triangles, etc.) 25. COMMENT: Add the information as required by the standard above. 2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval. 26. COMMENT: If applicable add the proposed easement information as noted by the standard above. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. 27. COMMENT: Address the following building setback items on the site plan sheet. Building A: Label the street perimeter building setback based on the existing and future back of curb location. Label the building setback from the east property line. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s). 28. COMMENT: Draw, dimension and label the office area. Label the square footage of the office area within the building footprint. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. 29. COMMENT: All required sidewalks must be physically separated from the vehicular use areas. On this project, the sidewalks at buildings A and B must be raised concrete or the vehicle wheel stops must be provided from the end of the parking spaces to keep vehicles from overhanging onto the sidewalk areas. The minimum sidewalk width is four feet clear. Label the width of the two sidewalk areas. Where the sidewalk area is 6.5 feet or greater in width, wheel stops are not required. The onsite pedestrian sidewalk must be designed to connect to the Fort Lowell Road sidewalk. 2-06.4.9.S - Show existing or proposed pedestrian circulation along abutting rights-of-way. Such sidewalks must comply with accessibility requirements for the physically disabled and the design criteria in Section 10-01.0.0, Street Technical Standards, of the Technical Standards Manual. 30. COMMENT: Draw and label the sidewalk information along Fort Lowell Road for the current and future conditions. 2-06.4.9.U - Indicate graphically, where possible, compliance with conditions of rezoning. 31. COMMENT: Include with the next DP submittal a separate document that states how the rezoning conditions have been or will be addressed whether on the DP or upon development. (It is acknowledged that not all rezoning conditions apply to the Storage use.) 2-06.4.9.V - For gang mailboxes indicate location to assure there are no conflicts with other requirements, such as pedestrian accessibility, utilities, and landscaping. 32. COMMENT: It is assumed that mail will be delivered to the office building. Add a note stating so. 2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required. 33. COMMENT: As of this review zoning could not verify whether or not the sign may be within the SVTs until they are drawn on the site plan sheets. (Assure that the monument sign is out of the existing and future SVT.) 34. After a discussion with John Beall Rezoning Section Manager, the applicant must request a letter of determination regarding the change in PDP. While the site plan in the DP does not match the PDP the changes appear to be minor but must be approved through John Beall. Contact John Beal at 520-837-6966 or John.Beall@tucsonaz.gov . 35. COMMENT: All drawing sheets including the landscape sheets shall be compiled into one PDF document for the next submittal to PDSD. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
01/15/2019 | SBEASLE1 | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are affected by this development. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation (520) 837-8040 Howard.Dutt@tucsonaz.gov |
01/16/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. The landscape plan will contain the following identification in the lower right corner of each sheet: Any relevant case numbers for reviews or modifications that affect the site. Indicate graphically where possible the conditions of Re-zoning SECTION 4-01.0.0: COMMERCIAL RAINWATER HARVESTING 4-01.3.0 RAINWATER HARVESTING PLAN Revision of the Implementation Plan may be required in conjunction with preparation of the Grading Plan in order to coordinate the construction details and specifications. Verify that calculation are correct and engineering comments regarding Rainwater Harvesting plan are addressed. Ensure that all Zoning and Engineering comments and concerns are addressed. Additional comments may apply |
01/17/2019 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | |
01/22/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP18-0302 1) Combine all sheets into 1 package 2) Provide top/bottom spot grades for all proposed water harvesting areas to show that an effective ponding depth is maintained. Include a typical inlet/curb cut detail. Note that the spot grades should take into account any mulch or ground cover that is used. 3) Provide details for proposed equalizer pipe in retention basin 2. Include elevations for inlet, and outlets. Why can't the two separate basins be joined together? 4) Drainage report specifies a 12" equalizer pipe; plans show an 8" equalizer pipe. Update as needed 5) Provide draw down/infiltrations times for proposed basins 6) Clarify why drywells are being proposed and provide construction details and specifications. Note that the required draw down time for all basins is 12 hours, not 36 hours as mentioned in the drainage report 7) A drywell permit will be required from the Arizona Department of Environmental Quality (AZDEQ) for each proposed drywell 8) Show how the proposed plan is in compliance with City of Tucson (COT) Unified Development Code (UDC) section 7.6.6.C. Particularly the grading of the vehicular use areas should be in such a manner that runoff is directed into landscaped areas. Curb cuts should be provided at optimal locations to allow runoff to enter landscaped areas. Particularly along the eastern property line 9) Update landscape water harvesting plan volume calculations to account for the constructed volume/area of the basin, taking into account side slopes 10) Landscape plans. No Decomposed granite should be placed in water infiltration areas. DG silts and prevents infiltration. Revise material spec to be mulch or screened/washed gravel 11) Project site is greater than one acre. Provide a storm water pollution prevention plan and manual 12) Ensure that roof drains scupper underneath sidewalks. Reference COT Technical Standards Manual (TSM) section 7-01.4.1.E 13) TSM section 7-01.4.0. Provide a complete pedestrian circulation path. A sidewalk is required adjacent and parallel to any access lane of PAAL on the side where buildings are located. A pedestrian circulation path is also required to connect all buildings to Fort Lowell Rd 14) Add note to plans that all curb access ramps/accessible paths are to comply with ICC A117.1. Provide detail on plans for all curb access ramps, including detectable warnings 15) Site Visibility Triangles adhere to TSM Section 10-01.5.0 not Pima County Standards as referenced. Update SVT's as needed 16) Per TSM section 10-01.3.2.C, At the intersections of streets with other streets or collector or arterial streets with PAALs/Driveways, the curb lines will be connected with a curve having the minimum radius shown in Figure 6, measured at the face of the curb. Show the radius for the proposed curb return off of E Fort Lowell Rd. Entry needs to be based off of future right of way 17) Provide exact location line of future right of way 18) E Fort Lowell Rd does not appear to be accurately drawn. There appears to be a turn lane shown on the Site Plan. Update as needed 19) Show on plans the width of all proposed sidewalks including any potential vehicle overhang 20) Provide on plans waste stream calculations per TSM section 8-01.8.0 21) Provide a trash enclosure detail to meet TSM section 8 22) It is not clear how the two northern accessible parking spaces have access through the curb to the proposed building. Show details for the required curb access ramps 23) Provide a standard dimensioned detail for the service vehicle maneuvering paths shown 24) Landscape sheet P-1. Trees near the proposed trash enclosure appear to interfere with the required service vehicle vertical clearance area. Adjust positioning of landscaping as needed. Vertical clearance in maneuvering area is 25' 25) Additional comments may apply John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
01/23/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plans Returned for Corrections Notice Activity Number: DP18-0302 Project Description: E SITE/GRADING/SWPPP - FOOTHILLS STORAGE The review has been completed and a resubmittal is required. To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made, go to the PDSD Filedrop web page. Please enter the Activity Number in the “Project Description” field and name the files as directed, for example, second (2nd) submittal: 2_Plan_Set.pdf Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd The plans will then re-enter a 20-working-day review cycle. 1) Comment Response Letter 2) Corrected plan set with all documents 3) Items requested by review staff The current fee balance is $ 82.50 (see image below). Review fees must be paid prior to the second submittal review. Please include your Activity Number on the check stub. Thank you. Sharon Beasley City of Tucson Planning and Development Services 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
12/17/2018 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
12/17/2018 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Passed | Agency notified for their information only. |
12/17/2018 | SBEASLE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | Agency notified for their information only. |
12/17/2018 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | Agency notified for their information only. |
12/17/2018 | SBEASLE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | Agency notified for their information only. |
12/20/2018 | MASHFOR1 | COT NON-DSD | FIRE | Approved | This occupancy will be required to install a fire spinkler system based on S-1 usage and square footage. |
12/26/2018 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Reqs Change | **PDF attachment can be viewed on PRO in the "Documents" section** DP18-0302, Foothills Storage / First Submittal is being Returned for Corrections by Pima County Addressing. The attached pdf contains addressing's comments. Please let me know if you have any questions. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 4th Floor Tucson, AZ 85701 (520) 724-7570 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/23/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |