Permit Number: DP18-0286
Parcel: 99999999A

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0286
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/24/2019 SBEASLE1 START PLANS SUBMITTED Completed
02/19/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Alisa Hamblin
PDSD Zoning Review Section

PROJECT: Silverbell Crossings - Grading Plan
Development Package (2nd Review)
DP18-0286

TRANSMITTAL DATE: February 19, 2019
DUE DATE: February 20, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 27, 2019.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.3.0 FORMAT REQUIREMENTS

1. Follow Up To Previous Comment 1: I believe Elisa was asking to have a brief legal description listed in the title block similar to what is on the final but also including the recorded Map and Plat numbers, "Book 62 at Page 65".

Revise the title block of all plan sheets as previous requested.

Previous Comment 1: 2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat;

2-06.3.2 - All mapped data shall be drawn at an engineering scale having no more than 50 feet to the inch. This scale is the minimum accepted to assure the plan will be legible during review and when digitized and/or reduced for record-keeping purposes. The same scale shall be used for all sheets within the set. Smaller scales (60:1 or greater) may be used for some or all of the sheets with the prior approval of PDSD when it is determined legibility and the ability to be digitized and/or reduced for archiving will not be affected.

2. COMMENT: Comments in this transmittal can be reviewed "over-the-counter" with the next submittal. Please contact me to schedule.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Grading Plan development package
02/20/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
02/25/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The review has been completed and a resubmittal is required.
Activity Number: DP18-286
Project Description: E GRADING/SWPPP - SILVERBELL CROSSING PHASE B LOTS 1-46 AND COMMON AREAS "A", "B", AND "C"
To see review zoning comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made, submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. Enter the Activity Number in the Project Description field and name the file as directed, for example, third submittal: 3_Plan_Set.pdf. The plans will then re-enter a 20-working-day review cycle.
1) Comment Response Letter
2) Corrected plan set with all documents
3) Items requested by review staff
The fee balance is $0 (zero). Loren Makus, copied, is the Project Manager to contact with any questions, email: Loren.Makus@TucsonAz.gov or phone: (520) 837-4927.
Thank you.

Sharon Beasley
City of Tucson
Planning and Development Services
201 N. Stone Avenue, First Floor
Tucson, AZ 85701
02/25/2019 JOHN VAN WINKLE ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
02/25/2019 SBEASLE1 OUT TO CUSTOMER Completed