Permit Number - DP18-0286
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2019 | ELISA HAMBLIN | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Elisa Hamblin, AICP Principal Planner PROJECT: Silverbell Crossings - Grading and Drainage Development Package (1st Review) DP18-0286 TRANSMITTAL DATE: January 2, 2019 DUE DATE: January 2, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 2, 2019. 1. 2-06.4.2.B - A brief legal description and a statement as to whether the project is a resubdivision are to be provided. On resubdivisions, provide the recording information of the existing subdivision plat; 2. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 3. Ensure all Engineering Review comments have been addressed prior to approval by Zoning Review. 4. Comments in this transmittal can be reviewed "over-the-counter" with the next submittal. Please contact me to schedule. If you have any questions about this transmittal, please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
01/02/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | Ensure that all Zoning and Engineering comments and concerns are addressed prior to Landscape Section approval. Include previous approved landscape and NPPO plans with next submittal. Additional comments may apply. |
01/04/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plans Returned for Corrections (RFC) Notice: DP18-0286 Project Description: E GRADING/SWPPP - SILVERBELL CROSSING PHASE B LOTS 1-46 AND COMMON AREAS "A", "B", AND "C" The review has been completed and a resubmittal is required. To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by activity number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made to the plans, go to on the PDSD Filedrop web page. Please enter the Activity Number in the “Project Description” field and name the files as directed, for example, second (2nd) submittal: “2_Plan_Set.pdf”. Submit the following items to the PDSD Filedrop at www.tucsonaz.gov/file-upload-pdsd. The plans will then re-enter a 20-working-day review cycle. 1) Comment Response Letter 2) Corrected plan set with all documents 3) Items requested by review staff The current fee balance is $0 (zero). Loren Makus, copied, is the Project Manager to contact with any questions, email: Loren.Makus@TucsonAz.gov or phone (520) 837-4927. Thank you. Sharon Beasley City of Tucson Planning and Development Services 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
01/04/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP18-0286 1) Sheet 1 references S04-188. Supplied with this grading plan were S09-015 and T06BU00053. S04-188 is superseded by S09-015 and T06BU00053 has been withdrawn so it is not applicable. Please add all applicable previous job references to sheet 1 2) Supply the previously approved drainage report for review 3) Supply a SWPPP manual upon next submittal 4) Per City of Tucson Administrative Manual (AM) section 2-06.4.7.B add the required hold harmless note 5) Sheet 4. Near the bottom of this sheet are "???" in place of what should be slope call outs. Address as needed 6) A flood plain use permit will be needed for any work proposed within the 100 year flood plain limits John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
12/03/2018 | SBEASLE1 | START | PLANS SUBMITTED | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/04/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |