Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP18-0258
Parcel: 117141430

Address:
450 S MEYER AV

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Permit Number - DP18-0258
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/27/2019 SBEASLE1 START PLANS SUBMITTED Completed
07/16/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change The maximum distance between cleanouts is100'-0" measured along the developed pipe length between cleanout access points therefore the drop from the rim of the upstream cleanout must be added to the horizontal length of the pipe. The developed pipe length between CO 4 and CO 3 is 104'-6", not 100'-0". [Initial comment: Since the private sewer system will probably be built under the 2018 Codes, the maximum distance between cleanouts is100'-0" measured along the developed pipe length between cleanout access points (see utility keynote 13 on sheet T2). Reference: Section 708.1.1, IPC 2018.]
07/23/2019 DAVID RIVERA ZONING HC REVIEW Approved
07/23/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office
FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Kennedy and Meyer Townhomes - Single Family Residential Development
Development Package (2nd Review) - 450 S. Meyer Avenue
DP18-0258 - HC-3 Zoning / related to HPZ-18-90, T18SA00502

TRANSMITTAL DATE: July 23, 2019
DUE DATE: July 26, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 18, 2019.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

*** Address only the new "Follow up Comments numbered 1 - 4". The previous comment and previous follow up comments have been left as reference for the reviewer and applicant's courtesy.

2-06.3.0 FORMAT REQUIREMENTS

1. Follow up to Comment 2: The Subdivision case number S19-045 has been assigned to this project. List the case number in the lower right corner of all plan sheets. Also, list as reference the TSMR case number in the lower right corner of plan sheets.
Previous follow up comment 2: Previous Comment is still applicable; ensure to list the "S" number next to the title block of all plan sheets.
Previous Comment 8: 2-06.4.7.A.8.b - Once the final plat "S" number is issued provide it adjacent to the title block on each sheet.
2. Follow up to Previous Comment 4: Once the recording has been completed and the recording information has been obtained, list the recording number.
Previous follow up comment 4: The previous comment is still applicable until the comment can be addressed.
Previous Comment 11: 2-06.4.8.b - Sheet 3 "RECORD DATA KEYNOTE" 2 you reference abandoning part of the easement. Provide the recordation information for this abandonment.
3. Follow up to Previous Comment 8: Until the approval for an Aerial Easement has been granted, the previous comment is still applicable.
Previous follow up comment 8: Previous comment is still applicable until the easement is approved and recorded.
Previous Comment 22: Lots 6 & 7 it appears that the proposed roof will overhang into the right-of-way, some type of easement or temporary use permit maybe required, contact TDOT Real Estate department.
4. Follow up to previous Comment 9: Per your response to the previous comment. A site exhibit was included for the division of parcel 117-14-146A. A separate legal description describing the new parcel boundary for the Kennedy and Meyer subdivision was included with the warranty deed but the legal description for the remaining parcel was not included. Please include the missing documents with the next submittal of the DP.
Previous follow up comment 9: Clarify if an application has been submitted and if so list the case number as reference on the DP plan sheets next to the title block.
Previous Comment 23: As you are proposing to subdivide parcel 117-14-146A via this project a new development package will need to be provided to PDSD so that records has the correct DP for this commercial site.

If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
07/24/2019 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved DP18-0258 for Kennedy and Meyer Townhomes at 450 S Meyer AV, 3rd Submittal, is Approved by Pima County Addressing.
Thank you,

Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701
(520) 724-7570
07/30/2019 LOREN MAKUS ENGINEERING REVIEW Approved
08/05/2019 FRANK PODGORSKI HPZ ADVISORY BOARD HPZ ADVISORY BOARD DATE Approved Historic Preservation staff has reviewed the responses and revised plans for this project. The plans now reflect the Decision Letter dated 2.7.19.
If you have any questions, please let me know.
Jodie Brown, AICP, Historic Preservation Officer
City of Tucson, 201 North Stone Avenue
P.O. Box 27210, Tucson, AZ 85726-7210
www.tucsonaz.gov/historic-preservation
Direct line: 520.837.6968
08/06/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
- The reviews have been completed
- A resubmittal is required

Permit/Activity Number: DP18-0258
Description: E TENTATIVE PLAT/HPZ - Kennedy and Meyer Townhomes, Lots 1-13 and common area "A" (landscape, drainage, utilities).
Project Manager: Steve.Shields@TucsonAz.gov, (520) 837-4956
The fee balance is $0 (zero).
To view the review comments: www.tucsonaz.gov/PRO, enter Activity Number.
(If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
Name your 4th submittal documents accordingly, for example: 4_Plan_Set.
Submit the following items to the PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (listing your response to reviewer's comments)
2) Plan Set (all pages, full set)
3) Any other items requested by review staff
Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
08/06/2019 SBEASLE1 OUT TO CUSTOMER Completed