Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP18-0247
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/07/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
01/09/2019 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | January 9, 2019 Sharon Beasley City of Tucson Public Works Buildings - 201 North Stone Avenue Tucson, AZ. 85701 RE: DP18-0247 Abrazo Micro Hospital, 2nd Submittal, Received December 19, 2018 Dear Ms. Beasley, Thank you for the opportunity to comment on DP18-0247, Abrazo Micro Hospital; 2nd Submittal, a development package application for an approximately 3.5 acre site, located southeast of the intersection of East Los Reales Road and Interstate 10. The land use is Planned Area Development (PAD) 7 with the proposed development being a hospital. This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority is satisfied with the 2nd project submittal and has no additional comments to submit. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, Senior Airport Planner TUCSON AIRPORT AUTHORITY 7250 South Tucson Boulevard Suite 300 Tucson, AZ 85756 Phone 520-573-8100 Direct 520-573-4811 www.flytucson.com |
01/15/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The comment response letter stated that two 3" water meters would be serving the hospital (one meter for redundancy) but the public water notes on sheet C11 still call for 2" water meters. In addition, will a single 2" reduced pressure backflow preventer (Febco model 825Y) be capable of supplying the total demand of the hospital? [Initial comment: Tucson Water will not allow water meters and backflow preventers to be manifolded to achieve additional capacity. Each of the two required water sources to the building is to have a single water meter and reduced pressure principle backflow assembly capable of serving the total proposed water demand for the building.] |
01/16/2019 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Approved | 1/15/19 email: Regional Traffic Engineering has no comments on this submittal. The consultant, for the development, submitted a completed From 240 from the ADOT 'Traffic Engineering Guidelines and Processes' (TGP), which identified minimal impact to nearby the Wilmot Interchange. ADOT requests additional documentation, and mitigation, for the future development of the Estancia PAD for the traffic operations at the Wilmot interchange. This would include any intersection design, signing, striping and signal modifications. Thank you. Tom Martinez TMartinez@azdot.gov |
01/16/2019 | DAVID RIVERA | ZONING HC | REVIEW | Approved | |
01/16/2019 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Abrazo Micro Hospital - (Commercial - Major Medical Use) Development Package (2nd Review) (Rezoning C9-99-SP-7) DP18-0247 - PAD 7 Zoning &401 S Wilmot Road TRANSMITTAL DATE: January 16, 2018 DUE DATE: January 17, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 3, 2019. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 1. Follow Up To Previous Comment 18: Previous Comment 18 is still applicable until the documentation is provided. 2-06.4.9.E - Proposed land splits or existing lot lines shall be drawn on the plan with dimensions and the identification number and approximate square footage of each lot. (Please be aware that, if land division occurs and the number of lots falls within the definition of subdivision, a subdivision plat is required.) Land splits require a separate permit and review. PREVIOUS COMMENT 18: Documentation for the land division must be included with the next submittal. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
01/17/2019 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | |
01/17/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
01/22/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP18-0247 1) Update the final drainage report, pdf page 5 and 8, section 1.4, runoff flows are limited to 85% of the pre-existing condition not 90%. The 2,10 and 100 year cfs values under developed conditions should all be reduced by 15%. PDF page 58 appears to show only a 10% reduction 2) The 5 year threshold is a retention requirement, not a detention requirement. Update as needed. 3) Clarify in the report the basins that are for retention or detention or a combination of both. As an example, the detention basin drain time on pdf page 11, should be a retention basin drain time John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
01/23/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plans Returned for Corrections Notice Activity Number: DP18-0247 Project Description: E SITE/GRADE/SWPPP - ABRAZO MICRO HOSPITAL The review has been completed and a resubmittal is required. To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made, go to the PDSD Filedrop web page. Please enter the Activity Number in the “Project Description” field and name the files as directed, for example, 3rd submittal: 3_Plan_Set.pdf Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd The plans will then re-enter a 20-working-day review cycle. 1) Comment Response Letter 2) Corrected plan set with all documents 3) Items requested by review staff The current fee balance is $0 (zero). Thank you. Sharon Beasley City of Tucson Planning and Development Services 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
12/19/2018 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
12/27/2018 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Reqs Change | **PDF attachment can be viewed on PRO in the "Documents" section** 12/27/18 email: DP18-0247, Abrazo Micro Hospital / 2nd Submittal is Approved by Pima County Addressing subject to a correction to the Legal Description as shown below. Since this lot split is being processed (S18-104) please add “A portion of” and remove “per Pima County Submittal Checklist for Site Construction Permit”. Nick |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/23/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |