Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP18-0239
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/21/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
02/26/2020 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approved | DP18-0239 / Hedrick / 2nd Submittal is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
03/10/2020 | LSHAMIS1 | ZONING | REVIEW | Approved | |
03/16/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
03/20/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The first floor elevations have been provided but nothing indicates which units need a backwater valve. The site plan shows the building sewer connecting to the 21" public sewer located in Hedrick Drive. Unless there is an existing HCS, it is doubtful that Pima County would allow you to connect to that sewer. If there is an existing HCS, the upstream manhole has a rim elevation of approximately 2380 feet which means that the first floor of each unit will require a backwater valve. The waste from the second-story units may not pass through a backwater valve. [Initial comment: Provide the first floor elevation for each building. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole in the public sewer system, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor. Floors discharging from above that reference point shall not discharge through the backwater valve. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson.] 2. Comment not addressed. [Initial comment: Determine the design daily sewer flow for the development.] |
03/24/2020 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | RETURNED FOR CORRECTIONS NOTICE Your Next Steps: Resubmittal with a Comment Response Letter DESCRIPTION: SITE/GRADING - Hedrick Development. PERMIT: DP18-0239 FEE BALANCE: $0 (zero) SEE REVIEWER'S COMMENTS and your submitted documentson PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, left side, Activity Search, enter the Activity Number - Permits section, click on blue tab - Reviews section, click on Review Details - Documents section, click on blue icon to the right of each document YOUR NEXT STEPS: Submit the following items to the Filedrop- https://www.tucsonaz.gov/file-upload-pdsd 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set) 3) Any other documents requested by review staff - Name your 3rd submittal documents to start with the submittal number, for example: 3_Plan_Set Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter 201 N. Stone Avenue, 2nd Floor Tucson, AZ 85701 email: COTDSDPermits@TucsonAz.gov NOTE: The City of Tucson's Permit Counter at 201 N. Stone Avenue (the physical office) is closed to the public until further notice. In the meantime, our office is still fully staffed but all communications will be via telephone or email. City of Tucson updates: https://www.tucsonaz.gov/manager/covid-19-updates |
03/24/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Correct instances of text layering, for example sheet 6. 2. Clearly indicate adequate wall openings. 3. Check plans for typographical errors. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/24/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |