Permit Number: DP18-0235
Parcel: 11811015Q

Review Status: Completed

Review Details: DEV PKG - REVISION

Permit Number - DP18-0235
Review Name: DEV PKG - REVISION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/12/2019 SBEASLE1 START PLANS SUBMITTED Completed
02/13/2019 MARTIN BROWN COT NON-DSD FIRE Approved
02/13/2019 SBEASLE1 PIMA COUNTY ADDRESSING Approved The revision of DP18-0235 does not require review by Pima County Addressing and does not impact our prior approval of the 2nd submittal. Thank you

Nicholas Jordan, Addressing Specialist
Pima County Development Services Department
201 N Stone AV, Tucson, AZ 85701
(520) 724-9623
02/26/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
02/27/2019 ELISA HAMBLIN ZONING REVIEW Approved Pima County lot combination of parcels 11811015P and 11811006B is required. A final inspection has been placed on building plans T18CM08172. Lot combination documentation must be provided prior to issuance of the Certificate of Occupancy.
02/28/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP18-0235

1. Clarifications on pumping system
i. Provide detail for pump and label automatic control switch with a vertical float mechanism, or an equivalent device.
ii. Explain in drainage report and show on plans how the pumps are accessible when the tank or basin is full.
iii. Explain in drainage report and show on plans how pump inlets are screened.
iv. Explain in drainage report and show on plans pump-inlet box is drained when the pump is not running.
Per TSM section 2-01.13.1, add the following maintenance notes to the plan:
v. Call PDSD (791-5550) for inspections of installation and post-construction of any pumps as well as all other subsurface drainage improvements.
vi. Prior to final TDOT approval for drainage improvements impacting the public drainageway, final certification of drainage facilities & as-builts will be required.
vii. If subsurface drainage improvements are determined by City Engineer, (or from annual report inspections by civil engineer hired by owner), to be not functioning, a revised design will need to be submitted to PDSD for review and acceptance prior to reconstruction under separate permits.
2. Per TSM section 4-02.2.5.B.2.f, please provide an alternative to the concrete or rock veneer currently shown as the outlet detail into the Greyhound Wash. Acceptable alternatives may include: gabion mattress or baskets, or sized rip rap with filter fabric. Double check scour calculations with revised alternative
3. Confirm and update if necessary to show that the 100 year flood plain is contained within the greyhound wash. Provide appropriate freeboard
4. Confirm which portions of the project on the northern side of the greyhound wash would otherwise discharge to the north into the 18th st watershed and adjust final grading as needed so that existing watersheds are maintained as closely as possible
5. Development into the 100 year flood plain needs to be documented through an Environmental Resource Report which includes a map of Protected Riparian Area per TSM section 4-02.2.5.B. Maximum of 5% encroachment of the PRA is allowed. If no disturbance is proposed within the PRA, then no ERR Report will be required.
6. Update drainage report per TSM section 4-04.14.3, to include drainage facility maintenance recommendations for annual maintenance inspection by Civil Engineer, or EOR.
7. Per TSM section 4-04.2.3.1.4.C.7: Label all drainage easements as private or public. Specifically, any drainage improvements on the City parcel 11811011D shall be shown within a private maintenance easement to be maintained by the project's parcel owner.
8. Confirm draw down times in the proposed basins. Drawdown time for storm water should be less than 12hrs

Engineering can conduct an expedited electronic review once the above comments have been addressed

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
03/01/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change REVISION PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews are completed and a resubmittal is required.
Activity Number: DP18-0235
Project Description: E SITE/GRADING/SWPPP - Project Cactus
To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made, submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
Enter the Activity Number in the Project Description field and name the file as directed, for example, second revision submittal: REV-1_2_Plan_Set.pdf. The plans will then re-enter a 20-working-day review cycle.
1) Comment Response Letter
2) Corrected plan set with all documents
3) Items requested by review staff
Please pay the assessed fees, or Review Fees at a minimum, at the permit counter or mail a check (payable to the City of Tucson, address is shown below) prior to the completion of the next review. Include the Activity Number on your check stub. The fee balance is $429.00.
John Van Winkle, copied, is the Project Manager to contact with any questions, email: John.VanWinkle@TucsonAz.gov or phone: (520) 837-5007. Thank you.

Sharon Beasley
City of Tucson
Planning and Development Services
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
03/01/2019 SBEASLE1 OUT TO CUSTOMER Completed