Permit Number: DP18-0212
Parcel: 14026003Q

Address:
5975 S TUCSON BL

Review Status: Completed

Review Details: GRADING

Permit Number - DP18-0212
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/03/2018 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Tres Pueblos Este - Grading Plan
Development Package (1st Review)
DP18-0212 - Related to DP18-0107

TRANSMITTAL DATE: October 3. 2018

DUE DATE: October 11, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 27, 2019.


2-06.3.4 - A title block shall be provided in the lower right quadrant of each sheet.

1. COMMENT: The title block on the grading plan appears to be for PIA when submitting to TDOT. Revise the title block to match the title block of the tentative plat for this development.

2. COMMENT: Provide the development package case number, DP18-0212, adjacent to the title block on each sheet. Also reference the tentative plat case number Dp18-0107 next to the title block of all plan sheets.

3. COMMENT: Assure that any changes that are made to the grading plan or tentative plat affecting either plan are made accordingly. Zoning will approve the grading plan once the PDSD Engineering and Landscape reviewers have approved the plans.



If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Grading package
10/10/2018 ANDREW CONNOR NPPO REVIEW Reqs Change Ensure that any changes made to the grading plan or tentative plat affecting either plan are made accordingly. Landscape will approve the grading plan once the PDSD Engineering have approved the plans.
10/11/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP18-0212

1) All sheets. Title block shows references City of Tucson Department of Transportation. Title block appears to be incorrect. Provide an updated title block
2) Per City of Tucson Stormwater Detention/Retention Manual section 3.4.2 provide a grade control marker for each proposed basin. On the plans please also provide the coordinates of the grade control marker so that they can be easily located in the future
3) Sheet 7 detail N. Retaining wall detail does not match the detail shown in the page 7 of Wright Engineers geotechnical report Project No. 180269. Clarify and update
4) Per City of Tucson Administrative Manual (AM) section 2-06.4.7.B add the required hold harmless note

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
10/12/2018 NROSS1 ZONING-DECISION LETTER WRITE DECISION LETTER Reqs Change Plan Returned for Corrections (RFC) Notice: DP18-0212
Project Description: Tres Pueblos Este

To see review comments about the plans, please visit https://www.tucsonaz.gov/pro/pdsd/activity_search and enter activity number above.

This review has been completed and resubmittal is required. Prepare a Comment Response Letter which tells the reviewers what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd and the plans will re-enter the 20 working day review cycle:
1) Corrected plan set
2) Items requested by review staff

Please type the activity number in Project Description or Message of PDSD Filedrop for resubmittal. Please remember to name your files appropriately, for example: second (2nd) submittal,
2_plan_set.pdf
2_response_letter.pdf

Review fees must be paid prior to resubmittal review.

Nick Ross
Lead Planner
Planning & Development Services
City of Tucson

Final Status

Task End Date Reviewer's Name Type of Review Description
10/12/2018 NROSS1 APPROVAL SHELF Completed
10/12/2018 NROSS1 OUT TO CUSTOMER Completed
10/12/2018 NROSS1 REJECT SHELF Completed