Permit Number: DP18-0209
Parcel: 107070230

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0209
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/27/2019 SBEASLE1 START PLANS SUBMITTED Completed
03/26/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
03/27/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Granite Stone Manufacturing and Display - General Manufacturing Use
Development Package (1st Review) 919 W Fairview Business Park Place
DP18-0209 - O-3 / I-1

TRANSMITTAL DATE: March 27, 2019
DUE DATE: March 26, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 27, 2019.

***Please address the remaining

1. Follow up to previous comment 8: The applicable use specific standards were not listed on the cover sheet or on sheet 2. The use note should read as follows; "General Manufacturing; Subject to UDC Use Specific Standards 4.9.5.C.2, .6, .7, .8 and 4.9.13.Q; include a reference to display as an accessory use."

Previous comment 8: Label the proposed use as General Manufacturing; Subject to UDC Use Specific Standards 4.9.5.C.2, .6, .7, .8 and 4.9.13.Q; include a reference to display as an accessory use.


2. Follow up to previous comment 14: The HC detail drawing is depicting an 8'0" access aisle, the access aisle on the site plan is dimensioned as 8'-6", which one is correct?

Previous comment 14 revise the Accessible parking detail to match what is proposed on the site.


3. Follow up to previous comment 18: This comment was not addressed as required. Revise on sheet 2 keynotes 5, 6, 7 and B. Revise the word 'vertical slope" to "Cross slope" for all annotations and keynotes.
Revise the typo on keynote 5 from "BOLLARS' to "Bollards".
Review the keynotes and revise any typos as required.

Previous comment 18: Revise the term vertical slope to "Cross Slope" on all annotations related to sidewalks.


4. Follow up to previous comment 19: Correct the typo of the word 'STRIPPED' to "Striped" for all notes, keynotes etc. where they occur.

Previous comment 19: On sheet 2, correct the typos for the words "striped" and "coordinate" in keynotes 6 and 7. Check keynotes for additional typos and correct as needed.

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/27/2019 DAVID RIVERA ZONING HC REVIEW Reqs Change see zoning comments
04/04/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP18-0209

1) Previous comment 2. Detail 4 on sheet L-1. The 6" depth of the water harvesting area needs to take into account whatever cover material is using. Provide an updated detail where the depth of cover is shown and then on top of that cover the 6" deep water harvesting basin
2) Update note on sheet G-1 which currently says "HARVESTING AREA (6" DEEP) ¾" DECORATIVE ROCK OR MULCH" TO SAY "WATER HARVESTING AREAS SEE DETAIL 4 ON SHEET L-1"
3) Previous comment 6. Remove note saying that detectable warnings are required only at transportation platforms. Per ICC A117.1, detectable warnings are required at all curb access ramps

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
04/05/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
Activity Number: DP18-0209
Project Description: E SITE/GRADING - Granite Store, manufacturing and display.
To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
After all corrections are made, name your documents accordingly - a 2nd submittal document would be titled: 2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, enter the Activity Number.
1) Comment Response Letter (lists changes to the Plan and which reviewer comments are being addressed)
2) Corrected Plan Set (all pages, full set)
3) Items requested by review staff
After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero).
The Project Manager can be reached via email: Nicholas.Ross@TucsonAz.gov or phone: (520) 837-4029.
Thank you.

City of Tucson
Planning and Development Services
Attn: Sharon Beasley
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
04/05/2019 SBEASLE1 OUT TO CUSTOMER Completed