Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP18-0186
Parcel: 121115330

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0186
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/24/2018 KELLY LEE START PLANS SUBMITTED Completed
10/29/2018 MARTIN BROWN COT NON-DSD FIRE Approved
11/13/2018 DAVID RIVERA ZONING HC REVIEW Approved
11/13/2018 DAVID RIVERA ZONING REVIEW Reqs Change TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Warrior Village Lots 1-8 and Common Areas A, B, C, D
Development Package (1st Review) Tentative Plat
DP18-0186 - 1185 N. Riverfront Estates

TRANSMITTAL DATE: November 13, 2018
DUE DATE: November 21, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 1, 2019.


Follow Up To Previous Comment 7: The applicant must contact John Cahill (520-837-6768) with the City Of Tucson Real Estate Division to request information on the process to abandon already dedicated right of way by a previous plat.

Zoning cannot approve the DP until the above item has been processed or not required by City Of Tucson Real Estate Division. Provide any documentation related to this item on the next submittal.

2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.

PREVIOUS COMMENT 7: On sheet 4 the current recorded plat is depicted with the existing recorded easements. The previous plat drawing should be removed and the new plat drawn in its place. The existing easements can remain and annotated as shown.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov
11/16/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
11/19/2018 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved DP18-0186 Warrior Village / 2nd Submittal is Approved by Pima County Addressing.

Thank you,

Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701
(520) 724-7570
11/21/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP18-0186

1) Previous Comment. Sheet 2 Keynote 19 is pointing towards a rip-rap let down channel into the proposed retention/detention basin. The rip-rap channel to the west is correctly identified by keynote 15. The corresponding detail for Keynote 19 on sheet 3 does not match what is drawn.
11/21/2018 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL
SECTION 2-10.0.0:
LANDSCAPE PLAN REQUIREMENTS
4.1 Identification and Descriptive Data
All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the
base plan (site plan or tentative plat). Should amendments be required to the
base plan through the review process, the same amendments will be made to the
landscape plan which will then be resubmitted along with the base plan.
The applicant must contact John Cahill (520-837-6768) with the City Of Tucson Real Estate Division to request information on the process to abandon already dedicated right of way by a previous plat.
Ensure that all Zoning and Engineering comments are addressed.
Additional comments may apply
12/13/2018 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change 12/12/18
SUBJECT:
Activity Number: DP18-0186
Address: 1185 N Riverfront Estates Pl
Due Date: Tuesday, November 20, 2018

Tucson Electric Power Co. (TEP) has reviewed and conditionally approves the Development Plan (Tentative Plat) submitted for review on October 24, 2018.

Please address the following comments with the next/final submittal:
- Previously requested - Please show existing TEP overhead facilities on the west side of the project
- Pole #217 is referenced with Keynote 10 - "Existing TEP Power Pole to remain". Please add a note that this pole is to be relocated.
- Pole #234 Access - Please add a note stating a 4' gate will be provided by the developer for access.
- Sheet 2 of 8 - In the SE corner of CA "D" the 10'x10' Electric Easement is incorrectly labeled as Keynote #1. Please correct to be labeled at Keynote #11.
- Sheet 4 of 8. There are two lots both labeled "Lot 5". Please correct

Costs for the relocation or removal of existing TEP facilities will be billable to the developer.

In order for an electrical design to be completed, please provide a copy of the Approved Tentative Plat and the subdivision AutoCAD file to mburke@tep.com<mailto:mburke@tep.com> . Easements for TEP facilities must be shown on the Final Plat before TEP can approve the plat.

If you have any questions, please feel free to contact me at 918-8205. Thank you,

Courtney Tejeda, Right of Way Agent
Land Resources Dept. RC131
Tucson Electric Power Co.
3950 E. Irvington Rd., Tucson, AZ 85714
12/13/2018 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Plans Returned for Corrections (RFC) Notice: DP18-0186
Project Description: E TENTATIVE PLAT - WARRIOR VILLAGE

The review has been completed and a resubmittal is required.
To see review comments about the plans, visit PRO at www.tucsonaz.gov/PRO, then search by activity number.
(If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made to the plans, submit the following items to PDSD Filedrop at www.tucsonaz.gov/file-upload-pdsd. The plans will then re-enter the 20-working-day review cycle.
1) Comment Response Letter
2) Corrected plan set
3) Items requested by review staff
Please type the activity number in the Project Description and name the files as described on the PDSD Filedrop web page.
The current fee balance is $ 2,226.53 (see image below).
Loren Makus, copied, is the Project Manager to contact with any questions: (520) 837-4927. Thank you.

Sharon Beasley
City of Tucson
Planning and Development Svcs. Dept.
201 N. Stone Ave., First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
12/13/2018 SBEASLE1 OUT TO CUSTOMER Completed