Permit Number: DP18-0149
Parcel: 14101006C

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0149
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/06/2018 KELLY LEE START PLANS SUBMITTED Completed
09/06/2018 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the development plan for Saguaro Trails Block 4. Please provide a copy of the Approved plan to mburke@tep.com.

If you have any questions, please contact me at 520-917-8744.

Thank you,

Mary Burke

Right of Way Agent III

Tucson Electric Power Co.

Land Resources – RC 131

3950 E. Irvington Road

Tucson, AZ 85714-2114

Office - 520-917-8744

Cell - 520-401-9895

mburke@tep.com
09/06/2018 CHRIS POIRIER PIMA COUNTY ADDRESSING Approved DP18-0149 Saguaro Trails - Block 4, Phase I and II, Lots 1-143 / 2nd Submittal is Approved by Pima County Addressing.



Thank you,



Robin Freiman

Addressing Official

Pima County Development Services Department

201 N Stone AV – 1st Floor
Tucson, AZ 85701

(520) 724-7570
09/10/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP18-0149

1) Previous comment 4: Basin 1 has a side slope of 1:1 and a ponding depth of 2'. Basin 1 also has a side slope/height exceeding IBC 2012 section 1013. Provide a guard for the sidewalk running alongside Basin 1
2) Engineering can conduct an expedited electronic review once the above comments and any outstanding department comments have been addressed. Resubmittal of revised plans and new workflow is required.
09/12/2018 ANDREW CONNOR LANDSCAPE REVIEW Approv-Cond Ensure that Zoning and Engineering comments are addressed.
09/13/2018 EHAMBLI1 ZONING HC REVIEW Approved
09/13/2018 EHAMBLI1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Elisa Hamblin, AICP
Lead Planner

PROJECT: Saguaro Trails - Block 4
Development Package (2nd Review)
DP18-0149

TRANSMITTAL DATE: September 13, 2018

DUE DATE: September 13, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 19, 2019.

1. Previous comment 16. Indicate proposed locations of gang mailboxes. Locations are not visible on landscape plans.

2. Previous comment 19. The addition of general note 26 is not sufficient. Each lot with alternative garage configurations must be noted and an overall percentage included.

3. Previous comments 13 and 20. The revision of general note 19 on sheet 5 is not sufficient. Provide details and notations that identify the specific points of trail connections, as well as appropriate signage.

4. Previous comment 21. Open space requirement table on sheet 5 and 18 is not sufficient. Demonstrate how the total required functional open space is being provided. Included totals for park and common areas that meet the definition of functional open space.

5. Please move the tracking/running tables demonstrating compliance with the requirements of the PAD, from sheet 18 to earlier in the plat, preferably the cover sheet or a new sheet 2.

If you have any questions about this transmittal, please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
09/13/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change The rim elevation of the next upstream sanitary manhole is either above or is less than 12" below the first floor elevation for the following lots: 21 and 123. Provide a backwater valve notation for these lots. [Initial comment: The rim elevation of the next upstream sanitary manhole is either above or is less than 12" below the first floor elevation for the following lots: 6, 13, 14, 15, 44, 45, 52, 53, 54, 55, 64, 67, 76, 85, 86, 96, 115, 116, 117, 118, 122, 123, 125, 126, and 138. Provide a note on the plans requiring the installation of a backwater valve when future plumbing activities take place. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson.]
09/14/2018 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change Ryan:
This review has been completed and resubmittal is required. Please resubmit the following items:
Prepare a Comment Response Letter which tells the reviewer what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd

1) Corrected plan set
2) Items requested by review staff
Please remember to name your files appropriately, for example: second (2nd) submittal,
2_plan_set.pdf
2_swppp_report.pdf and the plans will re-enter the review cycle.
Thank you,
Kelly Lee
Lead Planner
Planning & Development Services
09/14/2018 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Denied PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

DP18-0149 Saguaro Trails Block-4 09/13/2018

() Final Plat
(X) Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other - Elevations
SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() Approved
(X) Denied
() Rezoning history on site
() Annexation history on site
() Tentative Plat
(X) Development Plan
() Landscape Plan
() Other
REVIEWER: MM
DATE: 09/13/2018
COMMENTS
DP18-0149 under The Saguaro Trails Plan Area Development states that the builder shall, at the time of submittal for building permits:

III.G.4 Architectural Review & Self-Certification at Time of Building Permits, given the extent of architectural character, design, and detail presented in this PAD document for Saguaro Trails, no separate or subsequent architectural review process is required for the project. The only protocol that will apply in this regard is the substantial conformance of the ultimate residences and structures with the aesthetics, architectural concept, building elevations, colors, and materials presented herein. The builder shall, at the time of submittal for building permits to PDSD, submit an accompanying sealed letter certifying this substantial conformance and referencing applicable Section III.G of this PAD.
Saguaro Trails PAD Section III.B.2.B - Demonstrate compliance with this section. A residential density "running table" shall be provided on each individual tentative resubdivision plat as residential development proceeds over the life of the project. The structure and content of this running table shall be developed in conjunction with PDSD staff prior to submittal of the first residential resubdivision plat; an updated version of the same table shall then appear on each subsequent resubdivision plat until full residential build-out is completed and the final density is determined.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/18/2018 KLEE1 OUT TO CUSTOMER Completed