Permit Number: DP18-0143
Parcel: 140240690

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0143
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/17/2019 AMARTIN1 START PLANS SUBMITTED Completed
07/18/2019 ALEXANDRA HINES OTHER AGENCIES TUCSON AIRPORT AUTHORITY Passed
08/09/2019 PCAMARE1 ZONING HC REVIEW Reqs Change See Zoning comments
08/09/2019 PAUL CAMARENA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT Commercial Storage Yard - (Within TIA Height Zones and Avigation Easement)
Development Package (2nd Review) - 1390 E Wieding Road
DP18-0143 - I-1 Zoning / Commercial Storage Use

TRANSMITTAL DATE: August 9, 2019
DUE DATE: August 14, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 14, 2020.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

1. COMMENT: The PAAL that is located to the south of the proposed chain link gate does not meet the required PAAL width of 24'


2. COMMENT: Sign for accessible parking space needs to be 7' from the bottom of the sign to the finish grade.

3. COMMENT: Key notes are missing from the site plan. Add key notes to the site plan and review the key notes to make sure everything is labeled accordingly.

4. COMMENT: Per key note 15, Detail 207 needs to be illustrated on plans, remove the word depressed from key note 15.

Revise key note 5 to say "chip" instead of cheap.




If you have any questions about this transmittal, Contact Paul Camarena at (520) 791-5550 or by email Paul.Camarena@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
08/14/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change LANDSCAPE PLAN REQUIREMENTS

Label Sheet 2 as Landscape plan.

Vehicular Use Areas

General Standards

Within a vehicular use area, one canopy tree is required for each four motor vehicle parking spaces or fraction thereof.

(1) The canopy trees must be evenly distributed throughout the vehicular use area. Every parking space must be located within 40 feet of the trunk of a canopy tree (as measured from the center of the tree trunk).

Additional parking spaces have been added provide trees to meet requirement.

Ensure that all Zoning comments are addressed.

Additional comments may apply.
08/14/2019 ANDREW CONNOR NPPO REVIEW Approved
08/19/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change The minimum PAAL width is 24 feet for 90-degree parking. Revise the interior PAAL to comply with the requirement.
As previously commented, provide a backup spur for the parking outside the gate.
Clearly show grade breaks for area graded to drain toward the landscape areas. Indicate the area in square feet that will be directed into water harvesting.
08/20/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change

Final Status

Task End Date Reviewer's Name Type of Review Description
08/23/2019 AMARTIN1 OUT TO CUSTOMER Completed