Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP18-0140
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/14/2018 | ALEXANDRA HINES | START | PLANS SUBMITTED | Completed | |
06/14/2018 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Passed | Agency notified for information only. |
06/14/2018 | ALEXANDRA HINES | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | Agency notified for information only. |
06/14/2018 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Passed | June 27, 2018 WR# 6236122 DSD_CDRC@tucsonaz.gov Dear Alexandra SUBJECT: Sprung @ Pantano Christian Church 1755 S Houghton Rd DP18-0140 Tucson Electric Power Company has reviewed and not approved the development plan. It appears there are TEP facilities that are in conflict with existing facilities and will need to be relocated. Please make corrections and resubmit for approval. There are no facilities shown on the map. There is an easement depicted which should encompass the 3Ø primary cable and transformer. The existing transformer is 500kVA 277/480V. Depending on the needs of the proposed building it may need to be re-sized. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Rich Harrington New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8726 Should you have any technical questions, please call the area Designer, Cruz Vega @ 917-8713. Sincerely, Beth Shelton Elizabeth "Beth" Shelton Admin Assistant Design |
06/14/2018 | ALEXANDRA HINES | OTHER AGENCIES | U. S. POST OFFICE | Passed | Agency notified for information only. |
06/14/2018 | ALEXANDRA HINES | UTILITIES | SOUTHWEST GAS | Passed | Agency notified for information only. |
06/20/2018 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
07/03/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
07/06/2018 | ALEXANDRA HINES | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are affected by this development. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation (520) 837-8040 Howard.Dutt@tucsonaz.gov |
07/09/2018 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Site Section Manager PROJECT: 'Sprung' at Pantano Christin Church - 1755 S. Houghton Road Development Package (1st Review) DP18-0140 TRANSMITTAL DATE: July 9, 2018 DUE DATE: July 10, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 12, 2019. CONTENT REQUIREMENTS 1. 2-06.4.3 - Provide the development package case number, DP18-0140, adjacent to the title block on all sheets. 2. 2-06.4.2.C - The section corners listed on the location map are not correct, section 25 should be on the east and 26 on the west, also section 15 should be 13. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2-06.4.7.A.8 - For development package documents provide: 3. 2-06.4.7.A.8.c - Provide a building square footage expansion calculation on the plan. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 4. 2-06.4.9.H.5 - Sheet 3 there is a PAAL measurement of 23' per UDC Figure 7.4.6-A and Table 7.4.6-1 the minimum width of a PAAL providing access to 90 degree vehicle parking is 24'-0". 5. 2-06.4.9.H.5.a - Based on the most current aerial photos it appears that a reconfiguration of the accessible vehicle parking spaces shown near the southeast corner of the proposed building is proposed. Cleary demonstrate that the requirements of ICC A117.1-2009 section 502.5 for the parking space and access aisles. 6. 2-06.4.9.H.5.a - The last approved site plan shows 633 vehicle parking spaces provided, this plan shows 730, clarify the difference. 7. 2-06.4.9.R - Cleary demonstrate how pedestrian access is provided from the accessible vehicle parking spaces shown near the southeast corner of the proposed building to the sidewalk to the north. 8. 2-06.4.9.R - Per TSM Section 7-01.4.A At least one sidewalk is required to a project from each street on which the project has frontage, unless there is no vehicular access from a street because of a physical barrier. Clearly show the required connects to the streets. Once the above comments have been addressed Zoning is willing to provide and over-the-counter review. Email to schedule an appointment for this review. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
07/09/2018 | SSHIELD1 | ZONING HC | REVIEW | Reqs Change | See Zoning comments. |
07/09/2018 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL 7.6.2. APPLICABILITY The provisions of this section apply to the following: A. All new development; and, B. Expansion of existing development, as provided below: 1. Buildings Greater Than 10,000 Square Feet On sites where the gross floor area of the existing building(s) is more than 10,000 square feet, expansion in square footage of land area, floor area, lot coverage, or vehicular use area as follows: a. If the expansion is less than 25%, the standards of this section apply only to the proposed expansion. Existing development on the site is subject to the zoning standards in effect at the time the existing development received zoning approval. b. If the expansion is 25% or greater or if expansions as of February 15, 1991, cumulatively result in a 25% or greater expansion in land area, floor area, lot coverage, or vehicular use area, the standards of this section apply to the entire site. Verify that expansion calculations cumulatively are not greater than 25% |
07/09/2018 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
07/10/2018 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | |
07/12/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | DP18-0140 1) As shown on the development plan, the project encroaches into a riparian area. Provide an Environmental Resource Report and Mitigation Plan. Update drainage report to reflect the proposed encroachment. 2) Provide a copy, for review, of the previously approved grading/drainage plan for the existing development 3) Show on plans that any roof drains (downspouts) scupper underneath sidewalks or pedestrian walkways. Reference TSM section 7-01.4.1.E. John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 4) In the drainage statement, under proposed development, include the parking lot square footage in the description of impervious cover. |
07/13/2018 | KELLY LEE | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plan Returned for Corrections Notice: DP18-0140 This review has been completed and resubmittal is required. Please resubmit the following items to PDSD Filedrop https://www.tucsonaz.gov/file-upload-pdsd 1) Revised Plan Set 2) All items requested by review staff 3) All items needed to approve these plans Please remember to name your files appropriately, for example: Example 2 (second submittal): 2_plan_set.pdf 2_soils_report.pdf Kelly Lee Lead Planner Planning & Development Services (520) 837-6999 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/29/2018 | AHINES2 | OUT TO CUSTOMER | Completed |