07/27/2018 | ALEXANDRA HINES | START | PLANS SUBMITTED | Completed | |
08/09/2018 | KELLY LEE | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | August 7, 2018 Alexandra Hines Lead Planner City of Tucson Public Works Buildings - 201 North Stone Avenue Tucson, AZ. 85701 RE: DP18-0138 Dutch Brothers / 2nd Submittal, Received July 27, 2018 Dear Ms. Hines, Thank you for the opportunity to comment on DP18-0138, Dutch Brothers; 2nd Submittal, a development package application for an approximately 1.04 acre site located southwest of the intersection of South Headley Road and West Valencia Road. The land use is commercial, with the proposed development establishing a restaurant use (coffee shop). This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority submitted a comment letter on the 1st submittal of this project, comment letter dated 6/28/2018. The Tucson Airport Authority is satisfied with the 2nd submittal and has no additional comments to submit. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, Senior Airport Planner cc file |
08/14/2018 | EHAMBLI1 | ZONING HC | REVIEW | Approved | |
08/14/2018 | EHAMBLI1 | ZONING | REVIEW | Approved | |
08/16/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
08/16/2018 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
08/21/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The rim elevation of the next upstream sanitary manhole (2478.95') is higher than the first floor elevation (2476.84). Provide a note on the plans requiring the installation of a backwater valve when future plumbing activities take place. [Initial comment: Revise the site utility drawing to include the rim elevation of the next upstream manhole. Evaluate the need for a backwater valve based on requirements of Section 715.1, IPC 2012 as amended by the City of Tucson. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2012.] |
08/29/2018 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plan Returned for Corrections Notice: DP18-0138 This review has been completed and resubmittal is required. View the comments on www.tucsonaz.gov/pro and search by activity number. Prepare a Comment Response Letter which tells the reviewer what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd:1) Revised Plan Set2) All items requested by review staff3) All items needed to approve these plans Please remember to name your files appropriately, for example: Example third submittal:3_plan_set.pdf3_comment_response _letter.pdf Zoning Letter Review Comment: Remove the development package stamp from all sheets and leave a blank 3" x 5" space in the same lower right hand corner on all sheets for the electronic stamp. The plumbing and zoning letter review comments can be reviewed by appointment, similar to "over the counter". Please specify in the comment of the filedrop webpage that there are minimal comments for us to review right away. Thank you, Alexandra Hines |
Final Status