Permit Number: DP18-0117
Parcel: 10605008A

Address:
535 W ROGER RD

Review Status: Completed

Review Details: DEV PKG - REVISION

Permit Number - DP18-0117
Review Name: DEV PKG - REVISION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/24/2019 SBEASLE1 START PLANS SUBMITTED Completed
01/24/2019 SBEASLE1 WWM REVIEW Approved From: Joseph Godoy [Joseph.Godoy@pima.gov] on behalf of Sewer [Sewer@pima.gov]
Sent: Wednesday, January 16, 2019 8:19 AM
To: jean armstrong
Cc: Chris Anderson; Gerry Koziol
Subject: RE: Tucson Subaru Project - Revised Plan in City of Tucson

This project will not need to be submitted for a preliminary sewer layout review and approval as there are no buildings proposed or connections into the public sewer system. Please be aware that any changes to this plan with the addition of a building/s and proposed connection into G-65-001, and the 33-inch interceptor in Roger Rd. will require special approval for this.
Let us know if you have any questions.

Joseph Godoy, Site Division Manager
Pima County Development Services
201 N. Stone Ave
Tucson, AZ 85701
joseph.godoy@pima.gov
(520) 724-6756
02/05/2019 MASHFOR1 COT NON-DSD FIRE Approved
02/20/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
02/21/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
02/22/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP18-0117

1) Per Stormwater Detention/Retention Manual section 3.4.2 provide a grade control marker for each proposed basin. On the plans please also provide the coordinates of the grade control markers so that they can be easily located in the future
2) An expedited electronic review can be conducted once the above comment has been addressed and a new work flow opened. Please email to schedule

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
02/25/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change REVISION PLAN RETURNED FOR CORRECTIONS NOTICE
Project Description: E SITE/GRADING/SWPPP- TUCSON SUBARU COMMERCIAL STORAGE1st Revision is parking area expansion
The review has been completed and a resubmittal is required. To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by activity number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made to the plans, go to on the PDSD Filedrop web page. Enter the Activity Number in the “Project Description” field and name the files as directed, for example, second (2nd) submittal of revision: “REV-1_2_Letter.pdf”.
Submit the following items to the PDSD Filedrop at www.tucsonaz.gov/file-upload-pdsd. The plans will then re-enter a 20-working-day review cycle.­
1) Comment Response Letter
2) Corrected plan set with all documents
3) Items requested by review staff
The current fee balance is $0 (zero). Thank you.

Sharon Beasley
City of Tucson
Planning and Development Services
201 N. Stone Avenue, First Floor
Tucson, AZ 85701
02/25/2019 EHAMBLI1 ZONING HC REVIEW Approved
02/25/2019 ELISA HAMBLIN ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Tucson Subaru Commercial Storage Site - Vehicle Storage
Development Package (Revision #1) - 1st Review
DP18-0117 - 533 and 535 W. Roger Rd

TRANSMITTAL DATE: February 25, 2019
DUE DATE: February 21, 2019

COMMENTS: This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 22, 2020.

1. The additional parcel that has been added to these plans does not appear to have the same dimensions as the City's online mapping system. Pima County Assessor's information also indicates a rectangular lot without a 'cut-out' at the northeast corner. Please provide legal documentation that the lot is aligned as illustrated on the plans.
2. With the acquisition of an additional parcel, a lot combination is required. Zoning is requesting that the parcels be combined or an access easement or agreement is put into place. An access easement or access agreement ensures the western parcel is guaranteed access, regardless of current or future ownership. Provide updated plans or documents demonstrating recordation of the access.
3. As these corrections are minor, an over-the-counter review can be completed. Please contact me to set an appointment when you are ready for review of the final plans.

If you have any questions about this transmittal, please contact me at (520) 837-4966 or Elisa.Hamblin@tucsonaz.gov.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/25/2019 SBEASLE1 OUT TO CUSTOMER Completed