| 06/21/2018 | KELLY LEE | START | PLANS SUBMITTED | Completed | |
| 07/10/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The rim elevation of the next upstream sanitary cleanout (2508.5') is higher the first floor elevation (2506.20'). Provide a note on the plans requiring the installation of a backwater valve when future plumbing activities take place. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson. [Initial comment: Revise the site drawing to include the rim elevations of the manholes upstream and downstream of the point of connection to the existing public sewer. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2012.] |
| 07/13/2018 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape ARTICLE 7: DEVELOPMENT STANDARDS 7.6. LANDSCAPING AND SCREENING Screening for individual land uses and zones must be provided as determined in Table 7.6.4-1 and in addition to the required landscape borders. Screening is not required between similar uses in accordance with Table 7.6.4-1. Note: Drive thru requires a 30" screen. Canopy Trees in Vehicular Use Areas General Standards Within a vehicular use area, one canopy tree is required for each four motor vehicle parking spaces or fraction thereof. The canopy trees must be evenly distributed throughout the vehicular use area. Every parking space must be located within 40 feet of the trunk of a canopy tree (as measured from the center of the tree trunk). Verify that every parking space is within 40' of a tree. Ensure that all Zoning and Engineering comments and concerns are addressed. Additional comments may apply |
| 07/17/2018 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Starbucks at Grant and Tanque Verde - Food Service Use Development Package (2nd Review) DP18-0112 - C-2 Zoning TRANSMITTAL DATE: July 17, 2018 DUE DATE: July 20, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 10, 2019. 1. Follow Up To Previous Comment 15: The SVT drawn on sheet 3 should be a Pedestrian SVT and the SVT facing east from the PAAL entrance needs to be drawn and labeled. Revise the SVT's. It is acknowledged that the proposed sign if placed as depicted will not be within the SVT. Draw and label the proposed monument sign on the Landscape plan sheets. 2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required. PREVIOUS COMMENT 15: If applicable indicate on the plans the locations of any free-standing monument signage. 2. COMMENT: Assure that any changes made to the DP are made on all plan sheets. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 07/17/2018 | DAVID RIVERA | ZONING HC | REVIEW | Approved | |
| 07/20/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
| 07/23/2018 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plan Returned for Corrections Notice: DP18-0112Project Description: E SITE/GRADE- STARBUCKS AT GRANT & TANQUE VERDE To see reviewer's comments about your plans, please visit https://www.tucsonaz.gov/pro/pdsd/activity_search.You will need to enter the activity number shown above to see comments about the plan. This review has been completed and resubmittal is required. Prepare a Comment Response Letter which tells the reviewers what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to PDSD Filedrop and the plans will re-enter the 20 working day review cycle:1) Corrected plan set2) Items requested by review staff Please remember to name your files appropriately, for example: third (3rd) submittal,3_plan_set.pdf3_response_letter.pdf Alexandra Hines, AICP Lead Planner at Planning and Development Services, City of Tucson 201 N Stone Ave 1st Floor, Tucson, AZ 85701 (520) 837-6975 - alexandra.hines@tucsonaz.gov |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/23/2018 | AHINES2 | OUT TO CUSTOMER | Completed |