Permit Number: DP18-0082
Parcel: 136048090

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP18-0082
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/06/2018 ALEXANDRA HINES START PLANS SUBMITTED Completed
04/23/2018 MARTIN BROWN FIRE REVIEW Approved
05/03/2018 MMORENO1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Michael Moreno
PDSD Zoning Review Section

PROJECT: Radiant Gymnastics
Development Package (1st Review)
DP18-0082

TRANSMITTAL DATE: May 2, 2018
DUE DATE: May 3, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is March 2, 2019.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.3.0 FORMAT REQUIREMENTS

CONTENT REQUIREMENTS

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: Provide the development package case number, DP18-0082, adjacent to the title block on each sheet.

2-06.4.4.A - Show the subject property approximately centered within the one square mile area;

2. COMMENT: Show the subject property approximately centered within the one square mile area project-location map

2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and,

3. COMMENT: Please provide the information noted by the standard above.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.


2-06.4.7.A.8 - For development package documents provide:

2-06.4.7.A.8.d - When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. If the project is being phased, calculations must show that, at each phase, requirements are being met.

4. COMMENT: when is the future building proposed to be constructed, is phasing a proposal?

2-06.4.8 - Existing Site Conditions

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements.

5. COMMENT: Please provide the approximate distance and measurement to the lot line that divides parcel 136-04-8100 & 136-04-8090. Add the distance and bearing for the north, east and south lot lines for parcel 136-04-8100.

2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements.

6. COMMENT: Please provide the SR zone classification on the site plan on sheet 2.

2-06.4.9.G - If the project is to be phased, provide calculations, setbacks, etc., to indicate that each phase complies with all requirements as a separate entity. Show phase lines on the drawing. Show and label any temporary improvements that may be needed to make the site function for each phase as one entity. If such temporary improvements are off the site of the phase under consideration, a temporary easement or other legal documentation to assure legal use of the property is required. Note recording information.

7. COMMENT: If applicable please provide the information noted by the standard above.


2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required.

8. COMMENT: All proposed and new sings will have to go through the permit process and will require a new permit

9. COMMENT: Remove Development Package PDSD approval stamp on all sheets. Reserve a three-inch by five-inch space in the lower right quadrant of each sheet for an approval stamp. The approval stamp will be applied electronically.

10. COMMENT: Please submit a document of cross access agreement for the proposed development.

11. COMMENT: Please provide the setback dimension from the back of future curb along Golf links Road.

If you have any questions about this transmittal, Contact Michael.Moreno@Tucson.az.gov at any time during the week.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
05/03/2018 MMORENO1 ZONING HC REVIEW Passed
05/04/2018 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change UNIFIED DEVELOPMENT CODE
4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
The landscape plan will contain the following identification in the lower right corner of each sheet:
Any relevant case number for reviews or modifications that affect the site.

2-06.3.5 - Remove Development Package PDSD approval stamp on all sheets. Reserve a three-inch by five-inch space in the lower right quadrant of each sheet for an approval stamp. The approval stamp will be applied electronically.

SECTION 4-01.0.0: COMMERCIAL RAINWATER HARVESTING
A separate Water Harvesting Implementation Plan shall be submitted with all applications for new commercial developments where landscaping is required. The plan shall detail the landscape water demand and the harvested water supply needed to meet 50 percent of landscape demand.

1. Provide water budget data, along with the background data and assumptions used to develop it.

2. Applicants may use this water budget format to enter site-specific data to develop their Site Water Budget. Alternatively, applicants may develop their own Site Water Budget format. Whichever format is used, the submitted Site Water Budget shall incorporate and provide the following information:

3. Output. Output of the Site Water Budget shall include calculations showing how 50 percent of landscape water demand as an average across the site will be met using harvested rainwater, and shall include assumptions and supporting calculations as necessary to document these outputs. Output of the Site Water Budget shall include total water demand and rainwater supply calculations for each Water Harvesting Infiltration Area at the site.

Provide Rain Water Harvesting data.

Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval.
Additional comments may apply.
05/04/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DP18-0082

1) Per City of Tucson Technical Standards Manual (TSM) section 10-01.3.3.D, minimum distance between wedge curb and new sidewalk along S Camino Seco is 2', show on plans
2) Extend new sidewalk along S Camino Seco to northern property line
3) Sheet 2: Keynote 29 is referenced 5 times on drawing. 4 references to the trash enclosures then another reference to the east pointing towards a sidewalk. This third reference is in error?
4) Provide letter from Geotechnical Engineer confirming that location of retention basin 2 is acceptable given its proximity to the base of the northern slope
5) Provide letter from Geotechnical Engineer confirming that geotechnical report is applicable to western most portion of property. Page 4 of Pattison Engineering Geotechnical Report 18-041, Site and Exploration Location Plan, mentions that the western most area was excluded from the study
6) Sheet 2: Existing spot grades on northern slope do not match general contours. Also spot grades are shown as decreasing in elevation traveling up the slope
7) Double check waste stream calculations. A two dumpster enclosure seems excessive for the building use.

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
05/09/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Revise the site drawing to include the rim elevations, invert elevations, and the Pima County Wastewater Management Department (PCWMD) reference number for the sanitary manholes and cleanouts upstream and downstream of the proposed sewer connection points. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2012.
05/10/2018 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
Prepare a Comment Response Letter which tells the reviewer what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to PDSD Filedrop:
1) Corrected plan set
2) Items requested by review staff
Please remember to name your files appropriately, for example: second (2nd) submittal,
2_plan_set.pdf
2_swppp_report.pdf and the plans will re-enter the review cycle.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/10/2018 KLEE1 OUT TO CUSTOMER Completed